Jeffrey A Schmierer
Architect · Gensler · Castro Valley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-29750First issued Apr 26, 2004, expires Nov 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 35 permits since 2018, 35 in the last 5 years. Latest filed Jul 14, 2026.
- What kind of projects?
- Commercial or tenant improvement 22 · Other 10 · Retaining wall or site work 3
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 22 permits in San Francisco
Time to get a permit
Median from filing to permit, from 21 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 24,421 permits.
Where
- Financial District/South Beach7
- Presidio Heights2
- Noe Valley2
- Lakeshore2
Most recent
- 98 West Portal AvNo change in occupancy or use . no additions to area or height. interior ti of (e) retail bank and financial banking center to include (n) finishes, partitions, and mepsJul 14, 2026Issued
- 5655 Geary BlNo change in occupancy or use in this building. no additonal area or height is part of the scope. interior tenant improvement of existing retail bank and financial banking center at existing building including but not limited to new finishes, partitions, mechanical and electrical.Apr 30, 2026Filed
- 315 Montgomery St1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of americaJun 10, 2025Complete
- 3533 California StT.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parkingFeb 12, 2025Complete
- 3533 California StInterior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanicalFeb 5, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 14, 2026 | 98 West Portal Av No change in occupancy or use . no additions to area or height. interior ti of (e) retail bank and financial banking center to include (n) finishes, partitions, and meps Issued | Commercial or tenant improvement | Issued | 3 months | |
| Apr 30, 2026 | 5655 Geary Bl No change in occupancy or use in this building. no additonal area or height is part of the scope. interior tenant improvement of existing retail bank and financial banking center at existing building including but not limited to new finishes, partitions, mechanical and electrical. Filed | Commercial or tenant improvement | Filed | — | |
| Jun 10, 2025 | 315 Montgomery St 1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of america Complete | Commercial or tenant improvement | Complete | 4 months | |
| Mar 27, 2025 | 3525 California St Disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. Complete | Retaining wall or site workType unconfirmed | Complete | Within 1 month | |
| Mar 6, 2025 | 3533 California St Disabled access upgrade limited to exterior rear entrance landing, sidewalk, curb ramp, accessible route, parking stalls, accessible aisle, signage, and limited re-grading of adjacent parking surfaces. Complete | Retaining wall or site workType unconfirmed | Complete | 1 month | |
| Feb 12, 2025 | 3533 California St T.i. for existing financial banking center. no additional height is past of the scope. scope included new non-load bearing partitions, load beariing gravity columns, exterior glazing, floor finishes, ceiling, millworks, lighting, plumbing, hvac distribution, lefe safety, system accessible parking Complete | Commercial or tenant improvement | Complete | 3 months | |
| Feb 5, 2025 | 3533 California St Interior soft demo of (e) vacant space. ada upgrades will be provide on subsequent ti permit ab-017. level 1 consists of demo (e) interior non-structural paritions, doors, millwork, floor finishes, furnitures, atm, ceiling systems, light fixtures, ceiling accesories, electrical outlets, mechanical Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 5, 2024 | 2310 Fillmore St Rev 202403188043- scope of work includes storefront upgrade at (e) bank branch. structural work to support storefront entrance. new slab on grade in some locations. Complete | Revision or supplementType unconfirmed | Complete | 9 months | |
| Aug 13, 2024 | 5500 Geary Bl Exterior work only to include replacing light fixture housings, and re-painting of select exterior (street facing) locations, including stucco wall, roof rafter facades; exterior brick facing to remain. Filed | Other | Filed | — | |
| Jul 11, 2024 | 245 Winston Dr Project is an exterior improvement of e bank. no additonal area or height is part scope. scope is limited to exterior only including removal of existing metal clad awning, painting exterior walls and installation of bollard in front of atm sunshade. Complete | Other | Complete | 2 months | |
| Jun 7, 2024 | 111 Pine St #0 Tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to exterior only including but not limited to partial demo of exterior spaces, new finishes, new door and signage per elevations Complete | Other | Complete | 2 months | |
| May 31, 2024 | 111 Pine St Revision to permit 202402075406. revision will be on 1/f and cellar interior Complete | Revision or supplement | Complete | 2 months | |
| May 31, 2024 | 4098 24th St Alteration level 2: interior reconfiguration of office area, csr area, and back of house areas including wellness room, atm, and work room with new ceiling layout, finishes, and furniture. Complete | Commercial or tenant improvement | Complete | 4 months | |
| May 29, 2024 | 3251 20th Av Suite 103-fire only- modify (3) sprinkers for (n) store layout Complete | Other | Complete | Within 1 month | |
| May 23, 2024 | 3251 20th Av Revision to pa#202403057106: ste 103 *zara stockroom* per narative - electrical, arch, structural updates w/ layout changes. add layoout changes to update mechanical/arch plans Issued | Revision or supplement | Issued | 2 months | |
| Mar 18, 2024 | 2310 Fillmore St Interior and exterior tenant improvement of (e) building. trades include ameps. storefront remodel associated with new tenant, citibank. no change of use, sq footage, or building height. no impacts to (e) egress. this permit is associated with 2023-007557 prj/cua. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Mar 12, 2024 | 1007 Taraval St Project is exterior improvement of an (e) bank (bank of america). no additional area or height is part of the scope. scope is limited to exterior only including but not limited to cleaning and painting the exterior of the building and replaceing (1) light fixture. Complete | Other | Complete | 3 months | |
| Mar 5, 2024 | 3251 20th Av Tenant improvement for 3135 sqft storage space for zara store. expand interior storefront, new lighting, finishes, storage racks. hvac-new interior facade signage. Issued | Commercial or tenant improvement | Issued | 2 months | |
| Feb 7, 2024 | 111 Pine St #0 Gr/f: tenant improvement for (e) financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demo of interior spaces, new finishes, new partitons and electrical. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jan 23, 2024 | 111 Pine St Work is to remove the e existing millwork and furniture. remove the e finish partitions, doors, ceilings, and associated electrical work as noted in the following plans. project is exempt from da checklist under ab-017 vacant tenant space. ada improvement will be provided under subsquent t.i. Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.