Jin Qing Li
Engineer · J. Li & Associates · Millbrae
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-47534First issued Aug 2, 1991, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 65 permits since 2002, 65 in the last 5 years. Latest filed Oct 27, 2026.
- What kind of projects?
- Home remodel 16 · Commercial or tenant improvement 15 · Addition 8
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 16 permits in San Francisco
Time to get a permit
Median from filing to permit, from 12 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 10,218 permits.
Where
- Sunset/Parkside3
- Inner Richmond2
- Tenderloin1
- Outer Richmond1
Most recent
- 338 12th AvAlteration to (e) house at front. 1. install a new elevator to (e) house. 2. remove (e) interior stair from 2nd floor to ground floor. 3. convert part of the (e) closet into a powder room on 2nd floor.Oct 27, 2026Filed
- 155 Hyde StRepair or replace sheetrock in e utility room with new 5/8 in type x gyp bd. repair and upgrade electrical serviceApr 14, 2026Filed
- 338 12th AvConvert part of the 1st floor garage into living space; convert existing 1st floor laundry room into a half bath; gas tankless water heater relocation from 1st floor garage to corridor; convert part of the existing 4th floor family rm into a new den; 4th fl. bedroom remodel with layout change.Aug 20, 2025Withdrawn
- 619 47th AvRenovation to (e) rec room at rear of (e) g/f. enclose (e) lightwell at 2/f. remodel (e) kitchen. renovate (e) master suite at 3/f. relocate 2nd bathroom to 3/f. minor change to 3 steps hallway next to (e) stair on g/f.Oct 11, 2023Complete
- 1604 Mcallister StRepair fire damage to (e) bldg as per plans in-kind. repair exterior wall @ 2nd & 3rd fl. repair roof framing above unit 4. ground floor work under separate permit.Feb 16, 2023Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 27, 2026 | 338 12th Av Alteration to (e) house at front. 1. install a new elevator to (e) house. 2. remove (e) interior stair from 2nd floor to ground floor. 3. convert part of the (e) closet into a powder room on 2nd floor. Filed | Home remodel | Filed | — | |
| Oct 9, 2026 | 4355 Anza St Revision to pa #202606153242. replace existing wood beam with new steel beam. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 26, 2026 | 2972 Bush St Minor structural change to interior stair from 2nd floor to 3rd floor under pa# 202405021295, 202309086180 & 202403208264 Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Jun 15, 2026 | 4355 Anza St Permit revision to 202508284114: ground floor occupancy revised from i-4 to e per ab-005 to change from 2022 to 2025 codes. revise i4 to e per 2025 cbc sec 308.5.1. remove sprinkler reqmt per 2025 cfc 903.2.3. Issued | Revision or supplement | Issued | 2 months | |
| Apr 14, 2026 | 155 Hyde St Repair or replace sheetrock in e utility room with new 5/8 in type x gyp bd. repair and upgrade electrical service Filed | Home remodel | Filed | — | |
| Feb 13, 2026 | 1942 44th Av Revision to bpa# 201806071280 and 202603117387 restore existing bedroom closset at ground floor. 3/13/2026 Issued | Revision or supplement | Issued | 2 months | |
| Jan 19, 2026 | 240 Cotter St 2-story addition (1,212 sf) ground floor change of use - convert (e) garage to a child care facility (0-months to 5-years old), new deck and ada ramp; 2/f living room area remodel with layout change, add an outdoor staircase, roof-removal and replacement of the roof with new skylights. Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Jan 5, 2026 | 2345 Wawona St G/f:change of use and occupancy-convert (e) garage and living area to child care (3m to 5y) up to 23 kids facility.new dual meter panel (2x100a) w/ disconnect. new heat pump (heating and cooling system). 2/f: laundry relocated to 2/f bathroom. Filed | Commercial or tenant improvement | Filed | — | |
| Jan 4, 2026 | 443 Campbell Av Two story addition to the rear. re-arrange top floor layout. add one full bathroom. re-arrange ground flr with one recreation room, bedroom, and one bath. new two level deck and stair to rear yard. Issued | Addition | Issued | 7 months | |
| Dec 17, 2025 | 568 Shotwell St #0 Revision to pa#202508203543. 1. remove existing lath sheathing at both side of the hallway. 2. new 2x6 partition with plywood at one side as shown on ground floor. 3. minor revision to the location of the new 6x6 beam at rear stair Filed | Revision or supplement | Filed | — | |
| Sep 24, 2025 | 6038 Geary Bl Demolition of rear year 1-story, type v-b shed. Triage | Other | Triage | — | |
| Sep 19, 2025 | 2380 Franklin St Revision to pa # 2023-1017-8770 & 2025-0414-4364. minor revisions to adu. adu area increased from 300 sf to 355 sf. Filed | Revision or supplement | Filed | — | |
| Sep 19, 2025 | 4355 Anza St Ground floor change of use: change 1st flr piano studio to childcare center. (3-months to 2-year old, 22 kids). 2nd flr new laundry. Issued | Commercial or tenant improvement | Issued | 7 months | |
| Aug 20, 2025 | 338 12th Av Convert part of the 1st floor garage into living space; convert existing 1st floor laundry room into a half bath; gas tankless water heater relocation from 1st floor garage to corridor; convert part of the existing 4th floor family rm into a new den; 4th fl. bedroom remodel with layout change. Withdrawn | Home remodel | Withdrawn | — | |
| Aug 20, 2025 | 568 Shotwell St #0 To comply with 202538357 for items 2, 3, 4, and 6. structural repair to (e) rear stair and footing next to front stair including new bracings and metal connectors. new laundry room in (e) basement. Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 23, 2025 | 2654 31st Av Revision to pa 202405152194 add new skylight above (e) dining room and bathroom; add a catch basin @ rear yard Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 23, 2025 | 239 Crestmont Dr Repair (e) exterior stair stringer w c8 x 13.75 steel chanel Complete | Deck, stairs or patio cover | Complete | 8 months | |
| Apr 18, 2025 | 2322 41st Av Legalization of rear yard improvement: new trellis, retaining wall, stairs and landscape Filed | Legalize or fix a violation | Filed | — | |
| Apr 14, 2025 | 2380 Franklin St #0 Revision to pa #2023-1017-8770 redesign the layout for 4th fl. expand the (e) deck in 2nd fl from 5'1" to 5'1" x 10-4". eliminate fire place on 2nd fl. update foundation plan, 1st fl framing plan & 2nd fl framing plan. new skylights Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 10, 2025 | 399 09th St Renovation to the existing vacant space including new store front. two ada restroom Filed | Commercial or tenant improvement | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jin Qing Li? Request a correction.