- Licensed?
- License activeCivil Engineer C-89281First issued Jul 13, 2018, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 11 permits since 2022, 11 in the last 5 years. Latest filed Sep 5, 2024.
- What kind of projects?
- Commercial or tenant improvement 10 · Other 1
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 10 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966; 5 still in review. City is the San Francisco median for the same kind of review, from 10,218 permits.
Where
- Financial District/South Beach10
Most recent
- 300 Grant AvNew ramp addition for retail space. apply new wall finishes. no exterior (facade) workSep 5, 2024Filed
- 300 Grant Av1/f: ti office, mep per for new retail, lobby, staircase and toilet rooms.Dec 13, 2023Filed
- 300 Grant Av5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred)Nov 15, 2023Complete
- 300 Grant AvDemo existin tenant interior fixtures on the 1st flr, re-route mep pipes from basement to the 2nd flr. b/f, !/f & 2/f are fully vacant (separate ti permits)Oct 5, 2023Filed
- 300 Grant AvBasement, 1st & 2nd flr: tenant improvement- creating lobby space on 1st flr,new stair case from basement to 2nd flr with floor opening, 2-new bathrooms on the 1st flrJul 27, 2023Filed
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 5, 2024 | 300 Grant Av New ramp addition for retail space. apply new wall finishes. no exterior (facade) work Filed | Commercial or tenant improvement | Filed | — | |
| Jan 31, 2024 | 300 Grant Av 5/f:deferred submittal of mechanical, electrical & plumbing work only. ref ti pa# 202311150842. Complete | Revision or supplement | Complete | 4 months | |
| Dec 13, 2023 | 300 Grant Av 1/f: ti office, mep per for new retail, lobby, staircase and toilet rooms. Filed | Commercial or tenant improvement | Filed | — | |
| Nov 15, 2023 | 300 Grant Av 5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred) Complete | Commercial or tenant improvement | Complete | 7 months | |
| Oct 5, 2023 | 300 Grant Av Demo existin tenant interior fixtures on the 1st flr, re-route mep pipes from basement to the 2nd flr. b/f, !/f & 2/f are fully vacant (separate ti permits) Filed | Commercial or tenant improvement | Filed | — | |
| Jul 27, 2023 | 300 Grant Av Basement, 1st & 2nd flr: tenant improvement- creating lobby space on 1st flr,new stair case from basement to 2nd flr with floor opening, 2-new bathrooms on the 1st flr Filed | Commercial or tenant improvement | Filed | — | |
| Apr 19, 2023 | 300 Grant Av 4th flr - generate new meeting rooms (3): new two small meeting room. modify existing to accomodate one meeting room. install new partition wall, ceiling, recessed light (with dimmer switch). mep deferred and sprinkler/fire alarm permit will be processed separately. ref 201612275920"s". Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Apr 3, 2023 | 300 Grant Av Install (n) interior panels to reception area over (e) non-rated interior partition wall Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 1, 2023 | 300 Grant Av 4th fl - extend (e) wall to the ceiling (vertically); extend 9 ft height wall to 11'-9 height wall; (e) elevation to remain; there is no electrical work. sprinkler and mep permit will be filed separately Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 21, 2023 | 300 Grant Av 4/f: generate new private office, install new partition wall, new drywall ceiling, install 6 recessed lights on ceiling w/ 2 dimmer switches, install 1 track lighting on ceiling w/ 1 dimmer switch - all work on the 4th floor. sprinkler/mep will be filed separately. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 6, 2023 | 300 Grant Av Install (n) non-electric double face banner sign. Complete | Other | Complete | 2 months | |
| Jan 9, 2023 | 300 Grant Av Install new stair case from basement floor to 2nd floor. new (2) bathrooms on the 1st floor. Approved | Commercial or tenant improvement | Approved | — | |
| Aug 4, 2022 | 300 Grant Av 4/f: new non-structural partitions and finishes, new painting, lighting and electrical throughtout. Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.