Katherine Ann Fontaine
Architect · Actually Design Build
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34740First issued Jul 14, 2014, expires Sep 30, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 57 permits since 2017, 57 in the last 5 years. Latest filed Sep 16, 2026.
- What kind of projects?
- Home remodel 21 · Addition 13 · Other 7
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 21 permits in San Francisco
Time to get a permit
Median from filing to permit, from 21 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Sunset/Parkside10
- Glen Park2
- Bernal Heights2
- Castro/Upper Market2
Most recent
- 27 Roanoke StRemodel kitchen, install new slider door at l2 rear, eliminate wall between kitchen and family room.Jun 25, 2026Issued
- 378 Franconia StRemodel ground level: add new bedroom, new bathroom. new window and door at rear wall.Jun 4, 2026Issued
- 159 Beaver StReplace damaged roof framing adn third floor framing. remodel 2 bathrooms and kitchen. add storage closet at laundry. new stucco at front. new windows at front and rear walls.Jul 16, 2025Issued
- 422 Funston AvUnit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units.May 28, 2025Complete
- 4035 20th StLevel 2: kitchen and bathroom remodel. replace flooring throughout. replace tile at patio. level 3: primary bathroom remodel. replace flooring throughoutApr 30, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 28, 2026 | 2627 16th Av Revision to permits 202502251029,202507312075,202512081232. replace two street facing windows, revise title 24 documentation. change furnace to hydronic radiant heating. Filed | Revision or supplement | Filed | — | |
| Sep 16, 2026 | 1723 35th Av G/f: add 1 adu, 805sf adu 1-bed. remodel 2/f including 2 beds, 1 bath, 1 powder rm, kitchen and living area. add 3/f including laundry room, offie and master suite. add rear deck and spiral stair from 2/f to rear yard.project is subject to ab112 all-electric ordinance. Filed | ADU | Filed | — | |
| Aug 6, 2026 | 159 Beaver St Revision to pa#202507160911: structural repairs at rear concrete retaining wall. waterproofing at existing rear retaining wall. Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 21, 2026 | 1262 46th Av Revision to bpa:202510207736- at rear southeast corner, step in south and west exterior walls in 6" @ 1st floor and add 1 skylight. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 25, 2026 | 27 Roanoke St Remodel kitchen, install new slider door at l2 rear, eliminate wall between kitchen and family room. Issued | Home remodel | Issued | Within 1 month | |
| Jun 17, 2026 | 1262 46th Av Revision to 202510207736. clarity deferred submittal note on title sheet. 13d sprinkler system to be provided. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 4, 2026 | 378 Franconia St Remodel ground level: add new bedroom, new bathroom. new window and door at rear wall. Issued | Home remodel | Issued | 2 months | |
| Apr 17, 2026 | 1250 42nd Av Revision to pa#202506269526, t-24 revision, remodel of an existing second floor bathroom to include (n) plumbing fixtures. Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 15, 2026 | 1260 46th Av Provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential 1262 46th ave neighboring property structure under pa# 202510207736. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Apr 15, 2026 | 1266 46th Av Front building, provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential 1262 46th ave neighboring property structure under pa# 202510207736. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Apr 15, 2026 | 1264 46th Av Provide geogrouting at north and south property line for stabilization of soil pouring construction of new residential structure under pa#202510207736. Complete | Retaining wall or site workType unconfirmed | Complete | Within 1 month | |
| Dec 3, 2025 | 1262 46th Av Erect a (n) type v-b, 3-story building with 2 residential units. Issued | New building | Issued | 4 months | |
| Dec 3, 2025 | 1262 46th Av Demolish existing type 5, 2-story 1-bedroom single family home. Complete | Other | Complete | 4 months | |
| Dec 2, 2025 | 1250 42nd Av Revision to pa # 2025-0626-9526. structural framing changes based on as built conditions Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 31, 2025 | 422 Funston Av Revise pa #2025-0528-7428 to include the additional scope of work: replace 3 front-facing, level 4 windows, replace waterproofing and exterior siding at the entirety of level 4, add 1 skylight at level 3 roof, perform structural repairs to existing framing per field and construction conditions. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 18, 2025 | 2339 39th Av Rear deck and stair. replace two windows at front elevation. replace two rear windows with doors. Issued | Deck, stairs or patio coverType unconfirmed | Issued | 2 months | |
| Jul 16, 2025 | 1250 42nd Av At first floor: reconfigure existing bathroom and bedroom, add one bedroom. at second floor: extend primary bedroom and relocate powder room. adding 435 sf conditioned area. new windows and door at rear walls. Complete | Addition | Complete | 3 months | |
| Jul 16, 2025 | 159 Beaver St Replace damaged roof framing adn third floor framing. remodel 2 bathrooms and kitchen. add storage closet at laundry. new stucco at front. new windows at front and rear walls. Issued | Home remodel | Issued | Within 1 month | |
| Jul 7, 2025 | 422 Funston Av Addition of adu located at ground floor to be submitted under state program . adu to be studio apartment (total 630sf) seismic upgrade to 1st floor. Complete | ADU | Complete | 2 months | |
| May 28, 2025 | 422 Funston Av Unit# 422: remodel (e) bathroom and add powder room. unit# 424: remodel (e) kitchen, guest bathroon and primary bathroom. widen openings between kitchen/dining/living rooms. replace staircase to upper floor. replace rear windows and siding at both units. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Katherine Ann Fontaine? Request a correction.