CheckMyDesigner

Kevin Gerald Morton

Engineer · Hohbach-Lewin Inc. · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-5181First issued Jan 25, 2008, expires Sep 30, 2028.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
20 permits since 2006, 20 in the last 5 years. Latest filed Sep 3, 2026.
What kind of projects?
Home remodel 6 · Commercial or tenant improvement 5 · Other 3
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Home remodel: 6 permits in San Francisco

From 2011 to 2026, latest filed Jun 10, 2026.

Time to get a permit

Theirs
Within 1 month
City
Within 1 month

Median from filing to permit, from 4 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 4,701 permits.

Where

  • Potrero Hill3
  • South of Market2
  • Pacific Heights1
Permits
34 permits that name Kevin Gerald Morton, newest first, including 14 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Sep 3, 2026400 Pacific Av

Basement & 1st floor partial seismic upgrades, ada accessibility upgrades, office ti. mep under separate permits.

Filed
Jul 6, 2026402 Jackson St

New 510sf roof deck and (e) exterior fire escape/landing revision per ab-019. see 2025-012106coa & a0.5 for prior coa approval.

Filed
Jun 16, 2026120 Grant Av

Barricade (only) for replacement of door in storefront ref 2025-0710-9261

Issued
Jun 16, 2026120 Grant Av

Revision to pa#: 202506279718. demo (e) and replace subfloor (phase 2 south floor area).

Issued
Jun 10, 2026657 Arkansas St

1st fl: renovate (e) bedroom closets, bathroom and home office. 2nd fl: renovate (e) kitchen and dining areas, remove and replace (e) wood burning fireplace with new gas fp and add 2new skylights. replace (e) house gas furnace with new heat pump and replace (e). replace (e) tank water heater with ne

Filed
Jun 2, 20261 Sansome St

Install 2000 gallon fiberglass-coated-steel double wall ust in sidewalk to replace ust removal bpa 202602256471. install new pump and pipe to connect new ust to existing day tank. install new panel control and sensors for leak detection, overfill protection, and vacuum moritoring

Issued
May 5, 2026350 Bush St

Fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring.

Issued
Apr 3, 2026555 09th St

Back of house expansion (e)ground level occupying additional 1393 sqft of former tenant sapce. work includes (n) relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024

Complete
Dec 22, 2025402 Jackson St

Voluntary seismic upgrade -no exterior changes proposed.

Issued
Sep 22, 2025200 Powell St

Revision to 202507020036: structural detail & calculation provided for new suspended light box

Complete
Jun 18, 20252675 Geary Bl

Commercial tenant improvement for future grocery store.

Issued
Jan 3, 20252201 Broadway

Repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage.

Filed
Sep 30, 20242741 16th St

Installing of a temporary pre fabricated vibration test room housing vibration test equipment. accessory to the existing light manufacturing use on the adjacemnt property. ref pa 201211214631

Complete
Aug 29, 20245 Lucerne St #0

Facade repairs to the west side of the subject property of areas of dryrot. wood framing to be removed and replaced in kind per the original construction (1991 ubc) per charter 4 of the 2022 sfebc. maintain fire rating. approx 2500 sf of affected area.

Issued
Jun 12, 2024150 Post St

At gr floor: modification of existing tenant space to health spa. to include selective demo, construction of non load bearing partitions. new office door, frames, millwork, new sinks, finishes. mep deferred

Filed
Jun 29, 202338 Meadow Dr

***prioirty process***deferred submittal yerba buena island project - parcel 4y: shop drawings, install interior railings for issued pa# 201905170934 (bldg# 26)

Complete
Jun 29, 202337 Meadow Dr

***priority process*** deferred submittal yerba buena island project parcel 4y: shop drawings install interior railings for issued pa# 201905170931 (bldg# 23)

Complete
Jun 29, 202335 Meadow Dr

***priority process***deferred submittal yerba buena island project -parcel 4y: shop drawings - install interior railings for issed pa# 201905170929 (bldg# 21)

Complete
Oct 19, 2022700 V Minnesota St

Esprit park - renovation of an (e) park, includeing tree work, (n) lighting and plumbing, site furnishsings, planting, paving, signage, adult exercise equipment, and disability access complinace - related right of way work (curb ramp replacement) natural and synthetic turf lawns

Complete
Jun 15, 2021711 Eddy St

Revision to pa #201808086727 due to changes in the associated permit changes in the field.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Kevin Gerald Morton? Request a correction.