Luis Rodriguez
Engineer · Innovative Design Engineering · Richmond
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-87060First issued Feb 7, 2017, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 43 permits since 2010, 43 in the last 5 years. Latest filed Sep 24, 2026.
- What kind of projects?
- Home remodel 20 · Addition 8 · Deck, stairs or patio cover 6
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 20 permits in San Francisco
Time to get a permit
Median from filing to permit, from 18 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 18,601 permits.
Where
- West of Twin Peaks3
- Sunset/Parkside2
- Glen Park2
- South of Market2
Most recent
- 1716 Baker StReplace door system at rear, kitchen wall with cabana doors upgrade shear.Jun 17, 2026Issued
- 76 Dorado TrBathrooms remodeling - one bathroom remodel in kind, change master bathroom layout. install new furnace and waterheater. replace skylights in kind, not visible from the street.Jul 11, 2024Issued
- 76 Dorado TrKitchen remodel- remove kitchen walls, new kitchen island, new sink, new appliancesApr 4, 2023Complete
- 1363 35th AvVoluntary structural strenghteningMay 26, 2022Complete
- 233 30th StAdding a new half bathroom in existing closets. remove non load bearing wall in kitchen area.May 24, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 24, 2026 | 1873 Turk St In kind balcony repair 6 x21 balcony. no extensions or changes like for like repair at rear Filed | Deck, stairs or patio cover | Filed | Within 1 month | |
| Jun 17, 2026 | 1716 Baker St Replace door system at rear, kitchen wall with cabana doors upgrade shear. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| May 18, 2026 | 1923 32nd Av Add 290 sq ft roof deck to existing roof. existing access door and guardrailing to remain. Complete | Deck, stairs or patio cover | Complete | 2 months | |
| Mar 19, 2026 | 339 Faxon Av Revision to 202311030091: new livable space at 1st/f, kitchenette, bathroom, & 2 bedrooms Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 22, 2025 | 73 Fountain St Revision to pa2020-0113-1721 installed hardy boards instead of hardy shingles on front elevation; installed horizontal railing instead of vertical; changed the arch on top of front porch. want the plans to reflect the changes in the railings and shingles Complete | Revision or supplement | Complete | Within 1 month | |
| May 1, 2025 | 21 Samoset St Installation of (1) fixed window at the entryway next to the front door. the new window will be alum clad wood, obscured and tempered glass. (there is a preliminary approval from a planner) Complete | Other | Complete | Within 1 month | |
| Jul 11, 2024 | 76 Dorado Tr Bathrooms remodeling - one bathroom remodel in kind, change master bathroom layout. install new furnace and waterheater. replace skylights in kind, not visible from the street. Issued | Home remodel | Issued | Within 1 month | |
| Feb 29, 2024 | 73 Fountain St Rev to #202401103751, which was a revision to 202001031721. new office superseding partial deck on ground floor, add 2 lights, 4 outlets in office and 1 register can. Complete | Revision or supplement | Complete | 4 months | |
| Jan 22, 2024 | 76 Dorado Tr Revision 202304045019- structual details to address field condtions of footing Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 3, 2023 | 339 Faxon Av Convert 1st story basement to finished space. full 2nd story remodel.structural strengthening.addition of 250sqft to back of hosue w/deck above for master bedroom Issued | Addition | Issued | 18 months | |
| Apr 13, 2023 | 73 Fountain St Revision to permit 202001131721. new details for foundation. Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 4, 2023 | 76 Dorado Tr Kitchen remodel- remove kitchen walls, new kitchen island, new sink, new appliances Complete | Home remodel | Complete | Within 1 month | |
| Nov 10, 2022 | 1750 48th Av Addition to back of house: 2 levels attched to the back of the (e) home. 1 master bedroom with a closet and a walk-in closet. home office and an additional bathroom. new sunroom. new deck right above the sunroom. Cancelled | Addition | Cancelled | — | |
| Oct 24, 2022 | 2591 25th Av Rev to pa# 2017-0710-1367. increase scope of foundation replacement. update simpson strongwall along grid d. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 24, 2022 | 1363 35th Av Rev to pa 202205265036: structural revision - details of beam connection only. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 17, 2022 | 1012 Shrader St Remove (e) chimney. (n) code compliant stairs at 3rd flr to 4th flr at rear. (n) dormers at 4th flr. convert (e) attic to habitable conditioned space. (n) vert addition. (n) deck at roof. Filed | Addition | Filed | — | |
| May 26, 2022 | 1363 35th Av Voluntary structural strenghtening Complete | Home remodel | Complete | Within 1 month | |
| May 24, 2022 | 233 30th St Adding a new half bathroom in existing closets. remove non load bearing wall in kitchen area. Complete | Home remodel | Complete | 1 month | |
| Apr 25, 2022 | 672 Carolina St #0 Kitchen remodeling per plans, remove non-bearing wall, replace new appliances, new island, update mep up to code, new dryer/washer at kitchen, new hood. Complete | Home remodel | Complete | 1 month | |
| Mar 24, 2022 | 590 06th St #301 Unit 301: new closet partitions @ laundry room, non bearing walls to be removed, 1/f-2/f bathrooms, (2) total, to be remodeled, relocate 1/f bedroom door, 1/f new windows Issued | Home remodel | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Luis Rodriguez? Request a correction.