Malcolm Christopher Davis
Architect · Malcolm Davis Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23744First issued Oct 23, 1992, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 43 permits since 2004, 43 in the last 5 years. Latest filed Jul 28, 2023.
- What kind of projects?
- Home remodel 17 · Addition 17 · Legalize or fix a violation 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 17 permits in San Francisco
Time to get a permit
Median from filing to permit, from 17 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 574 permits.
Where
- Mission3
- Inner Richmond2
- Marina2
- Pacific Heights2
Most recent
- 250 Locust StRenovation, window additions @ set-back stucco portion of (e) bldg, no changes to brick elevations/building height. structural stregthening @ ground/f, roof deck w/in (e)stem walls. no visible adjustments from public way.Jul 28, 2023Complete
- 42 06th AvInterior remodel of existing single family residence, including a new skylight, altered fenestrations at rear of house & revised interior layout.Jan 23, 2019Complete
- 601 04th St #320#320: interior loft renovation. kitchen remodel, expansion of mezzanine and addition of a second bathroom at the mezzanine level. maher naOct 30, 2017Complete
- 2931 Pierce StProposed interior remodel of kitchen, replacement of main interior stair, master bedroom and bathroom remodel. remodel incudes new windows, skylights, plumbing/electrical fixtures and appliances.Sep 16, 2016Issued
- 2570 Folsom St #0Interior remodel of kitchen, master bedroom and bath including new plumbing fixtures, light fixtures, appliances & finishes, new windows and doors on rear and south facing facade. new heating and hot water system for whole house.Feb 27, 2015Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 3, 2025 | 48 Cook St Recommencement and completion of work approved under 202304256432 Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 23, 2024 | 250 Locust St Revision to pa# 202307283188. this revision captures the exterior steel stair previously noted in the scope of work as a deferred submittal along with minor structural & arch adjustments necessitated by (e) conditions @ job site discovered during construction admin. anything not clouded was Expired | Revision or supplement | Expired | 3 months | |
| Jul 28, 2023 | 250 Locust St Renovation, window additions @ set-back stucco portion of (e) bldg, no changes to brick elevations/building height. structural stregthening @ ground/f, roof deck w/in (e)stem walls. no visible adjustments from public way. Complete | Home remodelType unconfirmed | Complete | 4 months | |
| Apr 25, 2023 | 48 Cook St New kitchen added to the ground floor of an existing two-story dwelling unit (existing is only a bedroom & den only) at the rear of the lot. Expired | AdditionType unconfirmed | Expired | 1 month | |
| Aug 29, 2022 | 23 07th Av Interior remodel of an (e) single family residence. includes a foundation replacement, altered fenestrations at rear of house, several exterior volumetric additions not visible from front of property, and new skylights at the roof. Cancelled | AdditionType unconfirmed | Cancelled | 12 months | |
| Sep 16, 2021 | 4072 Cesar Chavez St Revisioin to pa# 201706129044-s1. revisioin incorporates changes to the rear deck, opening types and foundation. Complete | Revision or supplement | Complete | 16 months | |
| Aug 10, 2021 | 1029 Douglass St Rev to pa 201803153777 for clarifying that fire sprinler system shall be install per nfpa 13d. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 22, 2019 | 42 06th Av Revision to 201902153094/201901231024 add skylights, all other exterior and interior work previously approve under other permits Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 15, 2019 | 42 06th Av Minimal vertical addition above (e) 1st flr pop out at the rear of the property, in addition to several altered fenestrations in that pop out. all other exterior & interior work in separate permit app #2019-0123-1024. Complete | Addition | Complete | 6 months | |
| Jan 23, 2019 | 42 06th Av Interior remodel of existing single family residence, including a new skylight, altered fenestrations at rear of house & revised interior layout. Complete | Home remodel | Complete | 4 months | |
| Jun 13, 2018 | 476 Noe St Revision to #201604124546 s1. rebuild the front stair treads in-kind in order to regulate therise and run and eliminate the (e) tripping hazard. Cancelled | Revision or supplement | Cancelled | — | |
| May 10, 2018 | 48 Cook St To erect 3 stories, no basement, single family dwelling. type v-b Filed | New building | Filed | — | |
| Apr 24, 2018 | 476 Noe St Revision to pa #201604124546. alter the size of window wow per request of neighbor. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 4, 2018 | 2931 Pierce St Revision to pa 2016-0916-8038 - elimination of 2 front skylights, keep existing supports for gable roof, structural field revisions Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 21, 2017 | 283 10th Av Remodel (e) 2-unit dwelling. rear horizontal addition & lifting of whole structure to accomodate (n) garage. (e) 2nd unit is moved from front to rear of bldg to better take advange of views & light Cancelled | Addition | Cancelled | — | |
| Oct 30, 2017 | 601 04th St #320 #320: interior loft renovation. kitchen remodel, expansion of mezzanine and addition of a second bathroom at the mezzanine level. maher na Complete | Home remodel | Complete | Within 1 month | |
| Jun 12, 2017 | 4072 Cesar Chavez St Vertical & horizontal expansion & insteror remodel. new bay windows & framing new door & finishes @ entry new rear exterior wall w/ doors & glazing . pop out deck @ flr 1. new interior layout & finishes, plumbing electrical, lights & appliances. new radiant heat. bay windows @ street. Complete | Addition | Complete | 28 months | |
| Mar 31, 2017 | 3880 Cesar Chavez St #0 Horizontal & vertical addition. single family residential renovation. along with the addition of roof decks to the third & fourth level. the renovation is intended for a couple and their growing family. Issued | Addition | Issued | 29 months | |
| Sep 16, 2016 | 2931 Pierce St Proposed interior remodel of kitchen, replacement of main interior stair, master bedroom and bathroom remodel. remodel incudes new windows, skylights, plumbing/electrical fixtures and appliances. Issued | Home remodel | Issued | 7 months | |
| Jun 2, 2016 | 30 Bird St Revision to pa# 201406178571, (e) fence along dearborn has been revised to remain, the rated partial height wall was removed at the rear deck as it is not required by code, the rear deck foundation was revised to reflect fence changes. Complete | Revision or supplement | Complete | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Malcolm Christopher Davis? Request a correction.