CheckMyDesigner

Mariah B Meyer

Architect · Brr · Overland Park

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-37440First issued Oct 24, 2018, expires Aug 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
19 permits since 2019, 19 in the last 5 years. Latest filed May 25, 2023.
What kind of projects?
Commercial or tenant improvement 15 · Other 2 · Deck, stairs or patio cover 1
How long do their permits take?
Commercial or tenant improvement: 5 months. City typical for the same review: 12 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
28 permits that name Mariah B Meyer, newest first, including 9 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
May 25, 2023300 California St

1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flr

Complete
Mar 2, 2023690 Stanyan St

Installation of amazon package return kiosk

Filed
Apr 29, 2022450 Rhode Island St #1

Interior remodel; equipment update and minor demolition create order pick up area(not visible from the street)

Complete
Feb 24, 20223801 03rd St

Change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelving

Complete
Jun 21, 20211765 California St

T.i for (e) whole foods. interior metal stud framing, interior concrete slab modifications for utility piping and conduit, interior finishes, new/relocated equipment, lighting, hvac, updates to sales flr, offices, and basement team member lounge.

Complete
Feb 18, 2021355 Bay Shore Bl

Revision to pa# 2019-1223-0345; modification to walk in cooler and refrideration, switching entrance door to surface mounted auto slider and minor fixture layout changes

Complete
Dec 16, 20203 Embarcadero Center

Suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area.

Complete
Oct 24, 2020353 Bay Shore Bl

Construct 4 ada stall within (e) parking lot nw of (e) bldg. demo (e) columns, concrete wall & sidewalk, concrete wheel stop, eradicating striping, concrete curb, asphalt pavement, truncated domes, raise utility structure, raise strom drain inlet. construct concrete sidewalks, truncated domes,

Complete
Sep 15, 20201150 Ocean Av

T.i installation of freezers, coolers, work table, wire racking and storage cabinet. minor electrical & plumbing. work area: 1600 sq ft.

Complete
Sep 15, 20201765 California St

Mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. no walls are being constructed. seismic anchers provided. some work being done in garage below for new equipment.

Complete
Sep 15, 2020399 04th St

Replacing refigeration fixtures and related refigeration equipment including regigeration racks, etc. no walls proposed.

Complete
Jul 14, 20203950 24th St

Extg whole food: interior work only. at the back of the house(employee area only), we are installing 1 reach in prefabricated self contained cooler, a packaging table and some utility shelvs/racks. the shelves are not for storage. they are operational. also infilling walkin cooler door.

Complete
Jun 26, 202098 Post St

Rev to pa# 201912058714 & 202003066369 revised electrical distribution and circuting to eliminate new 480v service, loads on (e) circuits are revised, new circuits are revised to be served from (e) 208v service to demissed premises

Issued
Apr 23, 2020399 04th St

Essential construction project: install 4 prefabricated reachin coolers and 2 freezer and 4 dry storage metro shelves. this work is for mobile order pick ups of groceries. no new walls

Complete
Mar 6, 2020575 Market St

Ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058718. maher na

Complete
Mar 6, 202098 Post St

Ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058714. maher na

Issued
Feb 3, 2020300 California St

Revision to pa #2019-1202-8428: revise portion of mercantile space to back of house. add wall, door, and room tag.

Complete
Jan 21, 2020300 California St

Permit for dph review health only. original permit 201912028428 not routed to health

Issued
Dec 26, 2019370 Drumm St

Add 2 canopies to provide weather protection over 4 existing tennis courts. replace entry doors with automatic glass sliding doors. cover and update finishes over a portion f entry trellis signage under sep permit; as did not exist in 1988.

Cancelled
Dec 23, 2019355 Bay Shore Bl

Convert (e) tenant space into (n) grocery outlet store. scope includes metal stud framing, interior finishes, (n) restrooms, offices & breakroom. (n) work in cooler & freezer boxes, refrigerated cases on sales floor, (n) shelving & roll up door in stock room. fire alarm and sprinklers sep permits.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Mariah B Meyer? Request a correction.