Mariah B Meyer
Architect · Brr · Overland Park
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-37440First issued Oct 24, 2018, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 19 permits since 2019, 19 in the last 5 years. Latest filed May 25, 2023.
- What kind of projects?
- Commercial or tenant improvement 15 · Other 2 · Deck, stairs or patio cover 1
- How long do their permits take?
- Commercial or tenant improvement: 5 months. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 15 permits in San Francisco
Time to get a permit
Median from filing to permit, from 12 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 5,576 permits.
Where
- Financial District/South Beach3
- Bayview Hunters Point2
- Western Addition2
- South of Market2
Most recent
- 300 California St1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flrMay 25, 2023Complete
- 690 Stanyan StInstallation of amazon package return kioskMar 2, 2023Filed
- 450 Rhode Island St #1Interior remodel; equipment update and minor demolition create order pick up area(not visible from the street)Apr 29, 2022Complete
- 3801 03rd StChange of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelvingFeb 24, 2022Complete
- 1765 California StT.i for (e) whole foods. interior metal stud framing, interior concrete slab modifications for utility piping and conduit, interior finishes, new/relocated equipment, lighting, hvac, updates to sales flr, offices, and basement team member lounge.Jun 21, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 25, 2023 | 300 California St 1/f: demolition of 2 partition walls in existing mdf room. patching as necessary of demo scars after wall removal. vacant space on ground flr Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Mar 2, 2023 | 690 Stanyan St Installation of amazon package return kiosk Filed | Commercial or tenant improvementType unconfirmed | Filed | — | |
| Apr 29, 2022 | 450 Rhode Island St #1 Interior remodel; equipment update and minor demolition create order pick up area(not visible from the street) Complete | Commercial or tenant improvement | Complete | 6 months | |
| Feb 24, 2022 | 3801 03rd St Change of use. t.i. to institute retail general grocery use (formula retail): replace main entrance doors, metal stud framing interior finishes, toilet rm fixtures and finishes, office and break room, coolers and freezers, remodel stock room, lighting equipment and mech equipment & product shelving Complete | Commercial or tenant improvementType unconfirmed | Complete | 6 months | |
| Jun 21, 2021 | 1765 California St T.i for (e) whole foods. interior metal stud framing, interior concrete slab modifications for utility piping and conduit, interior finishes, new/relocated equipment, lighting, hvac, updates to sales flr, offices, and basement team member lounge. Complete | Commercial or tenant improvement | Complete | 6 months | |
| Feb 18, 2021 | 355 Bay Shore Bl Revision to pa# 2019-1223-0345; modification to walk in cooler and refrideration, switching entrance door to surface mounted auto slider and minor fixture layout changes Complete | Revision or supplement | Complete | 2 months | |
| Dec 16, 2020 | 3 Embarcadero Center Suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area. Complete | Commercial or tenant improvement | Complete | 5 months | |
| Oct 24, 2020 | 353 Bay Shore Bl Construct 4 ada stall within (e) parking lot nw of (e) bldg. demo (e) columns, concrete wall & sidewalk, concrete wheel stop, eradicating striping, concrete curb, asphalt pavement, truncated domes, raise utility structure, raise strom drain inlet. construct concrete sidewalks, truncated domes, Complete | Retaining wall or site work | Complete | 1 month | |
| Sep 15, 2020 | 1150 Ocean Av T.i installation of freezers, coolers, work table, wire racking and storage cabinet. minor electrical & plumbing. work area: 1600 sq ft. Complete | Commercial or tenant improvement | Complete | 7 months | |
| Sep 15, 2020 | 1765 California St Mep work only. replace like for like reach in cases and replacement of a rtu on rooftop. no walls are being constructed. seismic anchers provided. some work being done in garage below for new equipment. Complete | Other | Complete | 4 months | |
| Sep 15, 2020 | 399 04th St Replacing refigeration fixtures and related refigeration equipment including regigeration racks, etc. no walls proposed. Complete | OtherType unconfirmed | Complete | 2 months | |
| Jul 14, 2020 | 3950 24th St Extg whole food: interior work only. at the back of the house(employee area only), we are installing 1 reach in prefabricated self contained cooler, a packaging table and some utility shelvs/racks. the shelves are not for storage. they are operational. also infilling walkin cooler door. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Jun 26, 2020 | 98 Post St Rev to pa# 201912058714 & 202003066369 revised electrical distribution and circuting to eliminate new 480v service, loads on (e) circuits are revised, new circuits are revised to be served from (e) 208v service to demissed premises Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 23, 2020 | 399 04th St Essential construction project: install 4 prefabricated reachin coolers and 2 freezer and 4 dry storage metro shelves. this work is for mobile order pick ups of groceries. no new walls Complete | Commercial or tenant improvement | Complete | 5 months | |
| Mar 6, 2020 | 575 Market St Ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058718. maher na Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 6, 2020 | 98 Post St Ti renovation with new interior partitions, finishes, fixtures, equipment & restroom. revision to pa #201912058714. maher na Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 3, 2020 | 300 California St Revision to pa #2019-1202-8428: revise portion of mercantile space to back of house. add wall, door, and room tag. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 21, 2020 | 300 California St Permit for dph review health only. original permit 201912028428 not routed to health Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 26, 2019 | 370 Drumm St Add 2 canopies to provide weather protection over 4 existing tennis courts. replace entry doors with automatic glass sliding doors. cover and update finishes over a portion f entry trellis signage under sep permit; as did not exist in 1988. Cancelled | Deck, stairs or patio cover | Cancelled | — | |
| Dec 23, 2019 | 355 Bay Shore Bl Convert (e) tenant space into (n) grocery outlet store. scope includes metal stud framing, interior finishes, (n) restrooms, offices & breakroom. (n) work in cooler & freezer boxes, refrigerated cases on sales floor, (n) shelving & roll up door in stock room. fire alarm and sprinklers sep permits. Complete | Commercial or tenant improvement | Complete | 13 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Mariah B Meyer? Request a correction.