Mark David Macy
Architect · Macy Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-20541First issued Jul 20, 1989, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 27 permits since 2001, 27 in the last 5 years. Latest filed Mar 12, 2025.
- What kind of projects?
- New building 9 · Home remodel 5 · Commercial or tenant improvement 5
- How long do their permits take?
- New building: 4 months. City typical for the same review: 6 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
New building: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 3 issued permits filed since 1966; 5 still in review. City is the San Francisco median for the same kind of review, from 422 permits.
Where
- South of Market2
- Castro/Upper Market2
- West of Twin Peaks1
- Tenderloin1
Most recent
- 2320 Funston AvAdding one 2-bedroom detached accessory dwelling unit (adu) of 749 sf to an existing single family residence.May 7, 2024Complete
- 468 Turk StNew 9-story multi-family dwelling builingJun 25, 2021Filed
- 1237 Folsom StTo erect a 10-story, type 1b, 1 basement, mixed use bldg w/ 24 residential units, 2 hotel(transient) rooms and retail space. comply to maher ord# 155-13, route to dph.Jul 3, 2019Filed
- 2140 Market StTo erect a type 1-b, 8-story multi-family residential with (33) units and retail. no basements.Dec 18, 2018Filed
- 2135 Market StErect a 8-story, type 1b, 1 basement, mixed use bldg with 30 residential units.Dec 14, 2018Filed
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 2, 2025 | 2320 Funston Av P/a to address nov 2025-37685 and to revise p/a 202503122082 to include the construction of a r/f concrete retaining wall along north/side property line and portion of the east/rear property line (~90 lineal feet). Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 12, 2025 | 2320 Funston Av Project is a 231 sf addition to the (e) 268sf detached "guesthouse" to create a (n) dwelling unit per ab 1893. project also includes regrading and repaving driveway to accomadate accessible rear yard access and the creation of a 26sf trash/recycling enclosure. Issued | ADUType unconfirmed | Issued | Within 1 month | |
| May 7, 2024 | 2320 Funston Av Adding one 2-bedroom detached accessory dwelling unit (adu) of 749 sf to an existing single family residence. Complete | New building | Complete | 4 months | |
| Aug 31, 2022 | 126 Laguna St #0 Fill-in 2 (e) p|l windows (2.5x5') at north p|l of (e) 1/f flat, not visible from street. fill in with (n) 1hr fire rated wall assembly. (e) windows to remain. no exterior envelope changes. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Jun 1, 2022 | 126 Laguna St #0 Remodel (e) kitchen (184 sf) & (e) bathroom (64 sf), add (n) bathroom (50 sf) & renew interior finishes of (e) 1st fl flat (126 laguna); no exterior envelope changes Reinstated | Home remodel | Reinstated | Within 1 month | |
| Jun 25, 2021 | 468 Turk St New 9-story multi-family dwelling builing Filed | New building | Filed | — | |
| Jul 3, 2019 | 1237 Folsom St To erect a 10-story, type 1b, 1 basement, mixed use bldg w/ 24 residential units, 2 hotel(transient) rooms and retail space. comply to maher ord# 155-13, route to dph. Filed | New building | Filed | — | |
| Apr 25, 2019 | 65 Scott St 1st fl studio remodel, removing interior non structural walls. partial in-fill of light well Complete | Home remodel | Complete | 3 months | |
| Dec 18, 2018 | 2140 Market St To erect a type 1-b, 8-story multi-family residential with (33) units and retail. no basements. Filed | New building | Filed | — | |
| Dec 14, 2018 | 2135 Market St Erect a 8-story, type 1b, 1 basement, mixed use bldg with 30 residential units. Filed | New building | Filed | — | |
| Sep 26, 2018 | 351 12th St #0 Erect a 6-story building, type iii-a over type 1-a residential building (r-2) with an elevator and 39-adaptable sleeping units. Filed | New building | Filed | — | |
| Apr 30, 2018 | 1394 Harrison St To demolish 1 story car wash building. Approved | Other | Approved | — | |
| Mar 14, 2018 | 65 Scott St Additon of studio dwelling unit per ord# 162-16 in basement. soft story retrofit under pa# 201803143642. Complete | ADU | Complete | 11 months | |
| May 15, 2017 | 1 Henry Adams St Revision to 201606170315 to add additional outlets, heatlamps, sump pump, lights and larger elec panel to a fully accessible restaurant within gr fl commercial space, type 1 a podium of new mixed use res commercial building Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 17, 2016 | 1 Henry Adams St North - construction of a fully accessible restaurant within ground floor commercial space (type 1a podium) of a new mixed use residential/commercial building. n/a for maher. 7/20/16 mech replacement shts m2.1, e03.2/0.5/1.0/1.1/2.0/2.0/p2.11/2.12 Issued | Commercial or tenant improvementType unconfirmed | Issued | 1 month | |
| Mar 21, 2016 | 1 Henry Adams St North building: construction of a storefront only, for a future fully accessible restaurant in ground floor commercial space (type ia) or a new mixed use residential/commercial bld. maher na Issued | New buildingType unconfirmed | Issued | Within 1 month | |
| Jan 26, 2016 | 125 Saint Germain Av Bathroom improvements & window upgrade/replacement at 2 openings. no expansion of exterior envelope Complete | Home remodel | Complete | Within 1 month | |
| Aug 19, 2015 | 1394 Harrison St To erect 6 stories, no basement, type i-b, 67 residential units with commercial building. (r-2,m,u,s-2) ** ssordinance-extended required ** Cancelled | New building | Cancelled | 35 months | |
| Nov 20, 2013 | 323 Grant Av #0 Install a vehicular and pedestrian gate located in the public right of way in harlan place alley. the gate is attached to and supported by 321 grant av. Disapproved | Deck, stairs or patio cover | Disapproved | — | |
| Nov 20, 2013 | 333 Grant Av #0 Install a vehicular and pedestrian gate located in the public right of way in harlan place alley. the gate is being attached to and supported by 333 grant ave. Disapproved | Deck, stairs or patio coverType unconfirmed | Disapproved | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Mark David Macy? Request a correction.