Mark P Sarkisian
Engineer · Skidmore, Owings & Merrill · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-4639First issued Jan 23, 2003, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 15 permits since 2005, 15 in the last 5 years. Latest filed Jan 28, 2026.
- What kind of projects?
- Other 9 · New building 2 · Commercial or tenant improvement 2
- How long do their permits take?
- Commercial or tenant improvement: 4 months. City typical for the same review: 4 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Other: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966.
Where
- Lakeshore6
- Financial District/South Beach3
Most recent
- 300 Clay St #0Remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist.Feb 26, 2025Complete
- 88 Kearny StRooftop: install 2 am receive only and 2 fm receive only antennas and gpa only receive antenna and one receive only satelite.Aug 10, 2022Complete
- 810 Gonzalez DrBuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Dec 18, 2007Complete
- 310 Arballo DrBuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Dec 18, 2007Complete
- 350 Arballo DrBuild structural concrete pad to support new generator. install new electrical conduit/wiring to (e) building panel board located in basement of building being served. generator installation under separate permit.Dec 18, 2007Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jan 28, 2026 | 345 Montgomery St Change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23. Issued | Commercial or tenant improvement | Issued | 5 months | |
| Feb 26, 2025 | 300 Clay St #0 Remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist. Complete | Other | Complete | 2 months | |
| Jan 27, 2025 | 1750 Van Ness Av Revision to pa 2021-1123-2980 s2: remove all finishes, stone cladding, stone cladding support steel and the sawtooth ceiling from the shrine and meditation room. revise the buddha pedestal to gypsum board and paint. revise the lighting design for shrine area. Cancelled | Revision or supplement | Cancelled | Within 1 month | |
| Aug 15, 2023 | 450 Pacific Av #0 Deferred structural scope from 202307172307 including removal of approximately 50% of level 3. new diaphragm strengthening to levels 2, 3 & 4. addition of stability bracing to seismic braces at gl3.7. infill. Complete | Home remodelType unconfirmed | Complete | 3 months | |
| Aug 10, 2022 | 88 Kearny St Rooftop: install 2 am receive only and 2 fm receive only antennas and gpa only receive antenna and one receive only satelite. Complete | Other | Complete | Within 1 month | |
| Nov 23, 2021 | 1750 Van Ness Av Erect new 6-story over 1 bsmt, type ib, 40,514 gross sqft bldg for new buddhist temple & accessory bookstore. bsmt lvl of 23,517 sqft for below grade garage w/7 veh. parking, 1 ada, 14 class-1 bike space, storage, mech area. project includes 30 private, no-cost dorm rm for attendees/religious guest. Issued | New building | Issued | 13 months | |
| Nov 12, 2021 | 300 Clay St #0 This is an renovation project of the (e) basement, ground, loading dock & plaza level at 300 clay st. demolition of (e) walls, ceilings, finishes, mechanical, electrical & plumbing equipment. construction of (n) restrooms & kitchens, locker rooms, office & dry storage, storage & cooler. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Dec 6, 2019 | 400 02nd St To erect 27 stories, 3 basements, type i-a, office, pdr, retail building. (b,m,a-3,s-2) Approved | New building | Approved | — | |
| Jan 24, 2019 | 300 Clay St #0 Phase 2 of 2. upgrade to existing lobby, new entry canopy and enclosed plaza level space along the builing's edge to locate an additional commercial tenant. Issued | AdditionType unconfirmed | Issued | 17 months | |
| Jan 15, 2015 | 1127 Market St Header hanger frame for av display art wall. install av display panels. n/a for the intrim. reference to t.i. permit appl. #201212115890 for deferred submittal item. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 2, 2008 | 405 Serrano Dr Tower 47 - revision to 200712180787: installation of generator at tower 47. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 355 Serrano Dr Tower 46 - revision to 200712180801: installation of generator at tower 46. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 750 Gonzalez Dr Tower 26 - revision to 200712180783: installation of generator at tower 26. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 810 Gonzalez Dr Tower 27 - revision to 200712180793: installation of generator at tower 27. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 350 Arballo Dr Tower 39 - revision to 200712180789: install generator at tower 39. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 310 Arballo Dr Tower 40 - revision to 200712180792: install generator at tower 40. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 100 Font Bl Tower 15 - revision to 200712180796: install generator at tower 15. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 125 Cambon Dr Tower 14 - revision to 200712180794, install generator at tower 14. Complete | Revision or supplement | Complete | 2 months | |
| Jun 2, 2008 | 55 Chumasero Dr Tower 17 - revision to 200712180799: install generator at tower 17. Issued | Revision or supplement | Issued | 2 months | |
| Jun 2, 2008 | 150 Font Bl Tower 16 - revision to 200712180788: install generator at tower 16. Complete | Revision or supplement | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Mark P Sarkisian? Request a correction.