Michael Shad Howard Beazer
Architect · Studio 22 Design
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33524First issued Mar 5, 2012, expires Dec 31, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 36 permits since 2012, 36 in the last 5 years. Latest filed Sep 24, 2026.
- What kind of projects?
- Commercial or tenant improvement 13 · Home remodel 12 · ADU 3
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 12 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,701 permits.
Where
- North Beach4
- Russian Hill4
- Mission1
- South of Market1
Most recent
- 2707 Folsom StAdd communicating door from (e) preschool adjacent tenant space, change adjacent space to e occupancy.Aug 21, 2024Complete
- 221 04th St1st fl - replace store front, interior renovations in areas reflected by new work refinish floors restroom accesibility upgrades, replace lighting & electrical where affected by new work; install tensile fabric shade at plaza. mep/lf under separate permitFeb 7, 2024Issued
- 2720 Taylor StVoluntary accessibility upgrades to extg non conforming restroom element tenant spaces vacant.Jun 17, 2021Complete
- 2720 Taylor StRenovation to comply with s.f. accessible bldg entrance program, new door thresholds, door hardware and sidewalk grading. per ordinance 51-16Dec 31, 2019Withdrawn
- 2873 Octavia StTo comply with abe program per ord 51-16Oct 29, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 24, 2026 | 472 Pacheco St Front bldg- volumtary partial plywood stiffening @ foundation, add new anchor bolts Filed | Seismic retrofit or foundation | Filed | — | |
| Apr 16, 2025 | 3536 22nd St Whole home remodel: add bathrooms at 1st and 2nd level. remove fireplace & chimney, replace w/gas fireplace & flue. replace electrical wiring & outlets throughout. selective demo of interior spaces remodel kitchen & bath. (n) appliances fixtures & finishes. mep under separate permit Issued | Home remodel | Issued | Within 1 month | |
| Aug 21, 2024 | 2707 Folsom St Add communicating door from (e) preschool adjacent tenant space, change adjacent space to e occupancy. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 31, 2024 | 221 04th St Rev 202402075386: update 2 door locations due to (e) field conditions. depress slab & provide ramp at door #2 to provide clear level landing at interior exterior door. Reinstated | Revision or supplement | Reinstated | Within 1 month | |
| Apr 10, 2024 | 838 43rd Av Revision to permit 202402206154. replace deficient wall, ceiling and roof framing within area of work. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 20, 2024 | 838 43rd Av Kitchen & bath remodel, selective demo of finishes, fixtures in area of work. new fixtures, finishes & cabinets to be provided, mep under separate permit. add 2 skylights, replace (e) window with garden window, replace (e) sliding door at porch. no change in size or location. Complete | Home remodel | Complete | Within 1 month | |
| Feb 8, 2024 | 3927 Clement St Remodel to single family home, include soft demo to interior space, reconfigure (2) bedrooms located at 2nd floor, remodel kitchen and bathroom finishes, fixtures. add (n) full bathroom located at second floor. replace window in the same opening located at side of property. mep under seperate permit Complete | Home remodel | Complete | Within 1 month | |
| Feb 7, 2024 | 221 04th St 1st fl - replace store front, interior renovations in areas reflected by new work refinish floors restroom accesibility upgrades, replace lighting & electrical where affected by new work; install tensile fabric shade at plaza. mep/lf under separate permit Issued | Commercial or tenant improvement | Issued | 2 months | |
| Nov 28, 2023 | 515 Foerster St Revision to 202308164511. adjust interior wall layout, add 3 closets, delete window at rear, adjust side yard windows Expired | Revision or supplement | Expired | Within 1 month | |
| Aug 16, 2023 | 515 Foerster St Residential remodel, selective demo of e kitchen, bathrooms. build back of kitchen, bath areas in 2, enlarge e gr fl winodws, south side. new finishes, fixtures, appliances, south side. new finishes, fixtures, appliances in area of work, add wc at gr fl. mep under sep permit Complete | Home remodel | Complete | Within 1 month | |
| Apr 14, 2022 | 1718 Great Hy Infill existing light well at north side of property, no shared windows with adjacent propoerty. add stairs and landings at rear of building as permitted obstrucitons per zab-05 & sfpc sec 136 Issued | Deck, stairs or patio coverType unconfirmed | Issued | 17 months | |
| Jun 17, 2021 | 2720 Taylor St Voluntary accessibility upgrades to extg non conforming restroom element tenant spaces vacant. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Oct 5, 2020 | 1787 Haight St Renovate (e) split bath. (n) bathroom additional interior work only. in-kind kitchen remodel. mep under separate permit. Complete | Home remodel | Complete | 2 months | |
| Oct 5, 2020 | 1718 Great Hy Stucco and rot repair at front facade. replace doors and windows. extend third story deck to align with second story deck Withdrawn | Other | Withdrawn | — | |
| Sep 8, 2020 | 1857 Church St Kitchen & bath remodel, selective demo & build back (e) spaces. no work to front facade. mep under seperate permit. vertical/horizontal expansion of (e) building envelope. demo rear sunroom structure & construct new 2-story 352 sq ft crate breakfast nook, remodel bathroom, create garden storage area Complete | Addition | Complete | 25 months | |
| Dec 31, 2019 | 2720 Taylor St Renovation to comply with s.f. accessible bldg entrance program, new door thresholds, door hardware and sidewalk grading. per ordinance 51-16 Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Oct 29, 2019 | 2873 Octavia St To comply with abe program per ord 51-16 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 10, 2019 | 655 Beach St Interior t.i. of (e) gallery space including selective demolistion of partitions & finishes; new partitions & finishes. mep & fire life safety under sep permit. maher n/a. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Feb 7, 2019 | 74 Harper St Renovation of kitchen area, repair in-kind of select exterior area including siding roofing, entry steps & windows, mep under seperate permit to comply w/nov 201864101 Complete | Legalize or fix a violationType unconfirmed | Complete | Within 1 month | |
| Oct 25, 2018 | 43 Noe St Revision to app#2011.1108.8493. changes to floor plan for as built field conditions and owner requested changes, remove 1 bedroom. correct unit count from 5 to 4 under pa#2011.1108.8493 Cancelled | Revision or supplement | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael Shad Howard Beazer? Request a correction.