CheckMyDesigner

Michelle Anne Sullivan

Architect · Ssdp · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-25093First issued Jun 13, 1994, expires Feb 28, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
132 permits since 2008, 132 in the last 5 years. Latest filed Aug 11, 2026.
What kind of projects?
Home remodel 89 · Commercial or tenant improvement 16 · Other 14
How long do their permits take?
Home remodel: 7 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Home remodel: 89 permits in San Francisco

From 2013 to 2025, latest filed Apr 30, 2025.

Time to get a permit

Theirs
7 months
City
Within 1 month

Median from filing to permit, from 88 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 10,301 permits.

Where

  • Bayview Hunters Point56
  • Mission18
  • Japantown6
  • Chinatown3

Most recent

Permits
157 permits that name Michelle Anne Sullivan, newest first, including 25 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Sep 9, 20261035 Van Ness Av

Revision to bpa: 202510157392 - as requested by the project mechanical plan checker, this permit revsion documents the (e) ptac, or baseboard heater and bathroom exhaust fans that are remain in the project and removes the words ("design-build")

Issued
Aug 11, 20261033 Van Ness Av

The 1015 and 1033 ven ness ave project consists of providing tenant improvements to the existing gr fl vacant commercial space for existing building tenants. the proposed architectural scope is all interior and does not include any additions to the existing building footprint or envelope.

Issued
Jul 17, 20261035 Van Ness Av

Revision to pa# 202510157392: lv 1 - removal of storefront @ new mailroom, mailbox layout revision adding door from mailroom to 1015 vanness space + remove partition wall and door, add door from 1033 van ness space to storage room. lv 5 - add interior partition w/ rated door and interior window...

Complete
Jul 17, 2025657 Clay St

Second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348

Complete
Jun 5, 2025629 Post St

Ed 13-01:bsmt,1/f upgrades to offices/common area;elevator to bsmt.alt (e) entrances for ada; voluntary seismic upgrades, soft story retro.alt 1/f residences:20 of 63 units upgrade w/ (n) cooking area. limited ceiling r/r in-kind for floor ties passthrough for seismic upgrade.

Issued
Jun 4, 2025585 Geary St

Revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator

Complete
Apr 30, 20251178 Folsom St

Unit #406,506 & 601 conversion of 3 residential units (studio b type) to mobility units (b-m type) enlarge bathroom to provide circular turning space per cbc 11b-304.3.1 inside the bathroom. relocate (e) toilet & tub, (n) accessible lavatory. relocate (e) accessible pocket door. (n) kitchen counter

Complete
Apr 30, 2025835 Turk St

Ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm.

Issued
Apr 30, 20251174 Folsom St

G/f ste #a t.i. included 1 unisex bathroom w/ toilet & lavatory. lunch area counter w/ upper cabinets, sink, refrigerator, file storage room, prefabricated movable meeting pod w/ integrated ventilation, moveable , mep improvements

Complete
Mar 31, 2025657 Clay St

Interior unit entry door and door frame replace in kind per ca historical bldg code. the replaced door and frame will maintain the (e) door dimensions. the door and frame will be upgraded to be 20 minute fire rated, and new single motion lever and lock door hardware will be installed.

Complete
Aug 16, 20243055 16th St

Revision to pa# 2022-1107-6021 100% affordable housing additional structural support required at the storefront. revised storefront, repair & finishes to match existing.

Complete
Jun 25, 2024585 Geary St

100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures.

Complete
May 14, 2024585 Geary St

Repair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear,east,and west elevation.not visiable from street. scope includes new flooring,interior painting, and interior volutary signage.

Complete
May 3, 20241100 Palou Av

Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.

Complete
May 3, 20241152 Palou Av

Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.

Complete
May 3, 20241033 Oakdale Av

Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.

Complete
May 3, 20241077 Oakdale Av

Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.

Complete
May 3, 20241096 Palou Av

Existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.

Complete
May 3, 2024754 Kirkwood Av

(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.

Issued
May 3, 2024778 Kirkwood Av

(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Michelle Anne Sullivan? Request a correction.