Peter Petruzzi
Architect · Peter Petruzzi Architect · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-18480First issued Jul 15, 1987, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 181 permits since 2000, 181 in the last 5 years. Latest filed Aug 14, 2026.
- What kind of projects?
- Commercial or tenant improvement 80 · Home remodel 23 · Legalize or fix a violation 20
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 80 permits in San Francisco
Time to get a permit
Median from filing to permit, from 67 issued permits filed since 1966; 4 still in review. City is the San Francisco median for the same kind of review, from 19,488 permits.
Where
- South of Market12
- Mission9
- Nob Hill7
- Inner Sunset6
Most recent
- 617 Irving StInstall ada restroom and remove abandoned gas/ water/ elect.Aug 14, 2026Issued
- 5241 Geary BlBarrier removal, remove column, alter entry alcove slope, install batter power activator. install steel channel.Aug 14, 2026Filed
- 4220 California StRemodel existing office spaces into 1 single family dwelling at first and 2nd floor remodel space to kitchen, living, bedrooms and bathroomsJan 27, 2026Issued
- 895 Ofarrell StPartial demolition of (e) partitions, restrooms etc. reconstruct interior partitions, entertainment area. install elevator, new code compliant exit stairs, new restrooms.Sep 10, 2025Filed
- 1040 Bryant StChange of use from b/u to b/f-1 continuation of existing industrial (cultivational) ag. for cannabis and new distribution (wholesale sales)Feb 10, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 14, 2026 | 617 Irving St Install ada restroom and remove abandoned gas/ water/ elect. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Aug 14, 2026 | 5241 Geary Bl Barrier removal, remove column, alter entry alcove slope, install batter power activator. install steel channel. Filed | Commercial or tenant improvement | Filed | — | |
| Aug 5, 2026 | 197 Anzavista Av To comply with nov #202655939. permit retaining wall and permit landing. Issued | Legalize or fix a violation | Issued | Within 1 month | |
| Jul 24, 2026 | 2306 Broadway Create new pilaster & metal sercurity gate @ front yard Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Jun 26, 2026 | 701 Minna St #13 Remodel (2) bathrooms - fixture replacement in kind. Issued | Home remodel | Issued | Within 1 month | |
| May 4, 2026 | 164 14th St To comply with nov 202046581 - fire damage replacement in-kind replace 2 teel beams; replace exterior metal siding of north wall Filed | Legalize or fix a violation | Filed | — | |
| Apr 23, 2026 | 201 Capistrano Av Construct (n) deck and stairs at rear of dwelling. top of deck apprx. 7'-10" above grade. area of deck apprx. 112sf. install (n) waterproofing outlet at deck Complete | Deck, stairs or patio cover | Complete | 4 months | |
| Jan 27, 2026 | 4220 California St Remodel existing office spaces into 1 single family dwelling at first and 2nd floor remodel space to kitchen, living, bedrooms and bathrooms Issued | Commercial or tenant improvement | Issued | 8 months | |
| Oct 21, 2025 | 41 Mallorca Wy Convert existing ground floor storage to master suite. add warm board radiant heat, bathroom, new pell. all wood lifestyle windows in like kind of existing; remove any residual knob/tub replace with romex move electrical meters from rear to front near gas/ water. new sewer lateral & slab on grade Complete | Home remodel | Complete | 1 month | |
| Sep 10, 2025 | 895 Ofarrell St Partial demolition of (e) partitions, restrooms etc. reconstruct interior partitions, entertainment area. install elevator, new code compliant exit stairs, new restrooms. Filed | Commercial or tenant improvement | Filed | — | |
| Feb 10, 2025 | 1040 Bryant St Change of use from b/u to b/f-1 continuation of existing industrial (cultivational) ag. for cannabis and new distribution (wholesale sales) Complete | Commercial or tenant improvement | Complete | 9 months | |
| Oct 18, 2024 | 617 Irving St Perform accessibility upgrades per abe report 202307247966 including. relocate hardware on door and install battery operator power actuator. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 18, 2024 | 993 Filbert St #0 Revision to 202308033633. revised 1st flr bedroom and bathroom layout. revise 2nd flr bedroom and bathroom layout. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 18, 2024 | 701 Chenery St Revisions to permit 202406144495. for abe: 202208303524. relocate access entry to side of building. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 6, 2024 | 621 Irving St Install battery operated power assist and actuator for abe #202308168273. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Sep 6, 2024 | 619 Irving St Install battery operated power assist and actuator for each address. abe #202308168272. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Jul 22, 2024 | 37 Niagara Av To respond to nov# 202419221: replace (4) railing posts, railing and guardrail at rear of property. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jun 14, 2024 | 701 Chenery St Reconfigure restroom for accessible complian construct access to rear entry for abe compliance abe #202208303524 Complete | Commercial or tenant improvement | Complete | 1 month | |
| May 31, 2024 | 916 Clement St Comply with abe #202405170105. install powered actuator at entry. replace door. renovate restroom for accessible compliance. extend hardrails at stairs. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 31, 2024 | 690 Sacramento St Remove partition wall to enlarge bathroom door opening. replace (e) bathroom door. Issued | Commercial or tenant improvement | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Peter Petruzzi? Request a correction.