Raymond Situ
Engineer · Innovative Const · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-64647First issued Jan 23, 2003, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 345 permits since 2012, 345 in the last 5 years. Latest filed Oct 27, 2026.
- What kind of projects?
- Home remodel 125 · Commercial or tenant improvement 72 · Legalize or fix a violation 62
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 125 permits in San Francisco
Time to get a permit
Median from filing to permit, from 115 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Sunset/Parkside27
- West of Twin Peaks19
- Outer Richmond16
- Inner Sunset11
Most recent
- 1044 Guerrero StAdd 2 new bathroom per unit. remodel (e) bedrooms, kitchen, & family room in each unit. replace 45 windows like for like on side & rear wall. upgrade (e) electrical panels.Oct 21, 2026Issued
- 38 Portola DrRemodel: window replacement in-kind for entire house. relocate interior staircase. remodel (e) bedroom, powder room, kitchen at 2/f and (e) bedroom & baths on 3/f. reconfig 2 (e) bedrooms into 1 new master suite at 3/f. add (n) deck and new roof deck with spiral staircase.Sep 9, 2026Filed
- 1874 18th AvLightwell in-fill. propose new bedroom, new primary bedroom, new bathroom & new family room on g/f. rebuild interior staircase w/ code compliance. reconfigure bedrooms, bath, & kichen remodel.Aug 27, 2026Issued
- 742 Cabrillo StRev 202204051558: change interior starcase directions on 2/f to lower lvl. add new elec panelboard. relocate laundry. plumbing fixtures reconfig at 3/f master bedroom.Jul 27, 2026Complete
- 86 Stratford DrRemodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdwsJun 30, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 27, 2026 | 2058 29th Av Ground floor adu per government code section 66323. Filed | ADU | Filed | — | |
| Oct 21, 2026 | 1044 Guerrero St Add 2 new bathroom per unit. remodel (e) bedrooms, kitchen, & family room in each unit. replace 45 windows like for like on side & rear wall. upgrade (e) electrical panels. Issued | Home remodel | Issued | Within 1 month | |
| Sep 9, 2026 | 38 Portola Dr Remodel: window replacement in-kind for entire house. relocate interior staircase. remodel (e) bedroom, powder room, kitchen at 2/f and (e) bedroom & baths on 3/f. reconfig 2 (e) bedrooms into 1 new master suite at 3/f. add (n) deck and new roof deck with spiral staircase. Filed | Home remodel | Filed | — | |
| Aug 27, 2026 | 1874 18th Av Lightwell in-fill. propose new bedroom, new primary bedroom, new bathroom & new family room on g/f. rebuild interior staircase w/ code compliance. reconfigure bedrooms, bath, & kichen remodel. Issued | Home remodel | Issued | 2 months | |
| Aug 25, 2026 | 237 Sanchez St Erect a four story, 5 units apartment building,one basement type 5 building. Filed | New building | Filed | — | |
| Jul 27, 2026 | 742 Cabrillo St Rev 202204051558: change interior starcase directions on 2/f to lower lvl. add new elec panelboard. relocate laundry. plumbing fixtures reconfig at 3/f master bedroom. Complete | Home remodel | Complete | Within 1 month | |
| Jun 30, 2026 | 86 Stratford Dr Remodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdws Issued | Home remodel | Issued | 3 months | |
| Jun 30, 2026 | 1951 35th Av Remodel: partially infill lightwell at 1/f & 2/f. remodel (e) kitchen, dining and living room for open concept on 2/f. enlarge (e) closet & (e) master bath on 2/f. convert (e) bed into masterbedroom on 2/f. add new powder room on 2/f.rear platfor deck & roof covered to be removed. Issued | Home remodel | Issued | 2 months | |
| Jun 30, 2026 | 899 40th Av Remodel: infill lightwell @1/f & 2/f: add (n) utility room at 1/f to relocate laundry w/ (n) wh & furnace.remodel (e) kitchen & family room on 1/f unit #1.remove(e) powder rm & storage at 2/f to relocate staircase b/t 1/f & 2/f. convert (e) bed into master at 2/f unit 2. relocate kitchen w/ open 2/f Issued | Home remodel | Issued | 3 months | |
| Jun 30, 2026 | 43 Rockwood Ct Remodel: add new entertainment room, bathroom at lower level. relcoate laundry to lower level, reconfigure interior staircase, remodel kitchen & main level, remodel all (e) bathroom. Issued | Home remodel | Issued | Within 1 month | |
| Jun 30, 2026 | 129 Yale St Infill rear 1/f, propose new family room w/ wet bar, bedroom, bathroom, mubdroom and rear platform deck. 2/f: kitchen, bedroom & bathroom remodel. propose new deck on 2/f. Issued | Addition | Issued | Within 1 month | |
| Jun 30, 2026 | 64 Vienna St Remodel: relocate living room, kitchen & dining to 1/f per lan. add new powder room on 1/f. light well infill and reconfigure the bedrooms and bathrooms on 2/f. Filed | Home remodel | Filed | — | |
| Jun 30, 2026 | 2339 30th Av 1/f:reconfig layout with 2 new bedrs,1 full bath,(n) family room w/ wetbar.2/f:infill courtyard,lightwell,convert (e) 2 bed into 2 primary suite,int'r staircase to code compliant,kitchen,dining remodel w/ new powder room, new skylight.windows replacement throughout. rear deck access to yrd. Issued | Home remodel | Issued | 3 months | |
| Jun 22, 2026 | 302 Bay Shore Bl Commerical t.i. g/f: new ada compliant bathroom. replace main water line. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 17, 2026 | 1372 Underwood Av Comply w/ nov# 202538481 & 202538816: legalize as-built rear deck on 2/f. ground floor legalization per ord.43-14. Filed | Legalize or fix a violation | Filed | — | |
| Jun 10, 2026 | 1831 Hayes St Rear cantilver deck repair like to like on all levels less than 50% due to dry-rot. add posts to deck for safety urposes. not proposing new property line firewalls Filed | Deck, stairs or patio cover | Filed | — | |
| Jun 8, 2026 | 88 Merlin St Rev 202604300396: replace both (e) damaged wooden truss. Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Jun 2, 2026 | 1758 27th Av Infill north lightwell on both levels and relcoate intr staircase. reconfig interior to englarge (e) family rm &y bedrm, add n wic & bathrm on 1/f. relocate plumbing fixtures, add (n) pantry & 2 skylights at (e) kitchen on 2/f. infill south litewll on 2/f, relocate laundry/sink on garage. Issued | Home remodel | Issued | Within 1 month | |
| Jun 1, 2026 | 2985 Lake St Rev 202507080360. minor layout changes for work under pa 201404012150: convert storage room into new powder room and recon fig (e) bath on g/f. reconfig powder,closet, and pantry into new bathroom on main floor. reconfig 2 baths & closets and add new wet bar & laundry on 2/f. Complete | Revision or supplement | Complete | 1 month | |
| May 21, 2026 | 3151 Franklin St #0 Comply nov 202652320: legalizie the as-built rooftop deck. for service maintanence purposes only. Filed | Legalize or fix a violation | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Raymond Situ? Request a correction.