Richard Parker Hans Vaterlaus
Architect · Acmr Architectural · Alameda
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23212First issued Mar 23, 1992, expires Jul 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 18 permits since 2005, 18 in the last 5 years. Latest filed Mar 19, 2026.
- What kind of projects?
- Commercial or tenant improvement 11 · Home remodel 2 · Other 2
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 11 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 9,405 permits.
Where
- Mission Bay5
- South of Market3
- North Beach1
- Golden Gate Park1
Most recent
- 135 Rhode Island StInstall wheelchair platform lift per cbc 11b206.7 to access existing 2nd fl tenant spaces currently only accessible by stairDec 17, 2024Complete
- 111 Rhode Island StSuite 6 interior tenant improvement for kichen cabinet showroom. includes construction of new load bearring partitions. new owner provided millwork display with new lighting. elec and sprinkler to be design build under sep permit. no plumbing or mech workDec 27, 2023Complete
- 1351 Harrison StAbe #202001150935 comply w/ sf accessiblity entry program 51-16. req for slope landing at entry door exceeding 2% with power door operator. adjust door opening force to 5lbs or less. exterior work onlyAug 30, 2023Filed
- 478 Union StAbe 202001150948. building entry accessibility compliance per city of sf abe program. technical infeasibility request for existing step at entry and sloped sidewalk. replace (e) non compliant door threshold. install battery operated intercom. curbside service.Aug 9, 2023Complete
- 111 Rhode Island StSuite a: t.i. for furniture showroom including construction of non-load bearing walls. new owner provided fixture display and second floor office. mech & eletrical & sprinkler to be design build under separate permitJun 22, 2021Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 19, 2026 | 1350 Pine St New adu in basement level of existing 4 story apartment building - includes new living room / kitchen, 1 bedroom, office , and 2 bathrooms Issued | ADU | Issued | 4 months | |
| Jan 2, 2026 | 138 28th Av Revision to pa#202304145783: change bedroom at first floor to office, change toilet and shower location at primary bedroom on 3rd floor. Complete | Revision or supplement | Complete | Within 1 month | |
| May 9, 2025 | 1350 Pine St Revision permit#: 201608256054 r1. for addition of new unit on basement floor per ordinance 30-15. new unit# 29. reduction in floor area from 1333 sqft to 1079 sqft. one living room, kitchen, 1 bedroom, office and 2 bathrooms. Cancelled | Revision or supplement | Cancelled | 3 months | |
| Dec 17, 2024 | 135 Rhode Island St Install wheelchair platform lift per cbc 11b206.7 to access existing 2nd fl tenant spaces currently only accessible by stair Complete | Commercial or tenant improvementType unconfirmed | Complete | 2 months | |
| Dec 27, 2023 | 111 Rhode Island St Suite 6 interior tenant improvement for kichen cabinet showroom. includes construction of new load bearring partitions. new owner provided millwork display with new lighting. elec and sprinkler to be design build under sep permit. no plumbing or mech work Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 30, 2023 | 1351 Harrison St Abe #202001150935 comply w/ sf accessiblity entry program 51-16. req for slope landing at entry door exceeding 2% with power door operator. adjust door opening force to 5lbs or less. exterior work only Filed | Commercial or tenant improvement | Filed | — | |
| Aug 9, 2023 | 478 Union St Abe 202001150948. building entry accessibility compliance per city of sf abe program. technical infeasibility request for existing step at entry and sloped sidewalk. replace (e) non compliant door threshold. install battery operated intercom. curbside service. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 14, 2023 | 138 28th Av Residential remodel of sfd including: infill existing lightwell and area below 2nd fl. add 2nd fl deck, convert 3rd fl roof to usable deck. full interior remodel including kitchen and add 1 new bathroom. Complete | AdditionType unconfirmed | Complete | 5 months | |
| Jul 27, 2022 | 2644 Larkin St Expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd fl Issued | Home remodelType unconfirmed | Issued | 7 months | |
| Oct 18, 2021 | 111 Rhode Island St Suite a: revision to pa# 202106222957. scope of this permit is only for replacement of existing store front at rhode island st . no structral or mep work under this permit. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 22, 2021 | 111 Rhode Island St Suite a: t.i. for furniture showroom including construction of non-load bearing walls. new owner provided fixture display and second floor office. mech & eletrical & sprinkler to be design build under separate permit Issued | Commercial or tenant improvement | Issued | 2 months | |
| Oct 4, 2019 | 545 Francisco St Exterior remodel. ada upgrade of (e) entry. remove (e) canvas awning & replace (e) windows on francisco street & install new windows on water street. interior t.i. under seperate permit. ** maher: n/a ** Complete | Other | Complete | 19 months | |
| Jan 15, 2014 | 101 Henry Adams St #272- commercial tenant improvement at 2/f suite of existing showroom bldg., construct new display partitions, break area and new storefront window, all work within suite. compliance with ordinance no. 155-13 not required. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 15, 2014 | 101 Henry Adams St #101- commercial tenant improvement at 1/f suite of existing showroom bldg., construct new display partitions, office and storage room within existing showroom suite, compliance with ordinance no. 155-13 not required. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 11, 2013 | 22 04th St Construct 3 new non rated partitions to subdivide (e) office and 6 (n) offices, add 2 clerestory windows within (e) partition on the 6th fl. mechanical, sprinklers, elctrical and fire alrm separte permits. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Sep 29, 2010 | 989 Market St To comply w/n.o.v. #201063148 dated 08/16/10. reference to pa #201004069721 installation of new shelves, display cases & counters. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Apr 6, 2010 | 989 Market St Ground floor retail tenant improvement. install (n) freight elevator and stairs to basement. install (n) accessible wheelchair lift to (e) mezzanine. hvac & lighting under separate permit. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 5, 2007 | 1112 Ashbury St Interior remodel of 2nd & 3rd floor flats including (n) electrical. add (2) new skylights. reconfigure kitchen and relocate kitchen window. Complete | Home remodel | Complete | Within 1 month | |
| Oct 29, 2007 | 300 Bowling Green Dr California academy of sicences b-1 exhibits - non-structural partitions, mechanical & electrical for distribution only Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 15, 2007 | 151 Vermont St Revision to appl. #200709213373 to expand into adjacent space (unit 10). add (2) new openings at adjoining spaces & new hardware/threshold @ (2) front doors. Complete | Revision or supplement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Richard Parker Hans Vaterlaus? Request a correction.