Robert Mark Baum
Architect · Gould Evans Baum Thornley · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-12094First issued May 28, 1981, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 35 permits since 2004, 35 in the last 5 years. Latest filed Jun 9, 2022.
- What kind of projects?
- Commercial or tenant improvement 13 · New building 6 · Deck, stairs or patio cover 5
- How long do their permits take?
- Deck, stairs or patio cover: 9 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966.
Where
- South of Market4
- Chinatown3
- Pacific Heights2
- Lone Mountain/USF1
Most recent
- 2335 Golden Gate AvImprovement of (e) gym seating area that adds ada seating, food warming area, beverage counter and one all gender restroom.**maher n/a**May 19, 2020Complete
- 2135 Sutter StBasement renovation of (e) space. constrction to include non bearing partitions, finishes & equipment. fire/life safety to remain intact and operation during course of construction change of use from assessory storage to exercise room. non-sprinkleredJun 4, 2018Complete
- 168 Welsh StFor change of use from printing/business sevice to lab use only. establish lab use for 4000 gsf of tenant space on 2nd flr. no construction under this permit. all construction will be under a seperate ti permit. no cfc issued until t/i finaled.school fee if applicable paid under ti. ** maher: n/a **Oct 2, 2017Complete
- 52 Otis StNon-structural remodel of (e) ground floor space including new floor framing, non-load bearing partitions and store front replacement, mechanical, electrical & plumbing work under separate permit.Aug 10, 2016Complete
- 2222 BroadwayTi - classroom: replace carpet, lighting, ceiling - furred out walls. paint space. electrical work throughout.Jul 21, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 9, 2022 | 1475 Folsom St New roof deck to replace existing. Complete | Deck, stairs or patio cover | Complete | 3 months | |
| Mar 28, 2022 | 2615 Larkin St Revision to pa# 201910013153. remove & replace non-code compliant (e) stair between l2 & l3 with a new code compliant stair. pull level 3 floor beam north and re-hang joist. Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 20, 2021 | 395 03rd St To erect a 35-story, type i, mixed-use building with 524 residential units, retail spaces and 4 level of basement.**cpmply to maher ord# 155-13, routed to dph** Filed | New building | Filed | — | |
| Dec 13, 2021 | 659 Union St Construct a type i + v, 4-story, 2 basements, 22 dwelling units, mixed-used residential building. Filed | New building | Filed | — | |
| Dec 13, 2021 | 659 Union St Facade retention on columbus st, union st, & powell st, and for removal of any remaining building debris. new construction under separate permit which will incorporate (e) facade retained under this permit. emergency shoring to reinforce fire-damaged bldg issued under pa# 201804126159. Filed | OtherType unconfirmed | Filed | — | |
| Feb 4, 2021 | 30 Otis St The proposed project is an alteration of the lobby bar previously approved under pa# 2016-11-28-3577 s3 (arch / mep). Issued | Revision or supplement | Issued | 8 months | |
| Oct 30, 2020 | 2615 Larkin St New deck at rear of level 1. replace existing windows Issued | Deck, stairs or patio cover | Issued | 9 months | |
| Oct 30, 2020 | 2615 Larkin St Rev to pa 2019013016664. deck layout & details modified, added kitchen on roof Issued | Revision or supplement | Issued | 9 months | |
| Oct 30, 2020 | 2615 Larkin St Rev to pa201910013153. revised l3 plan reconfigured study now bedroom, sprial removed (n) deck under sep permit. revised l1 plan. added radiant heat throughout. Issued | Revision or supplement | Issued | 10 months | |
| May 19, 2020 | 2335 Golden Gate Av Improvement of (e) gym seating area that adds ada seating, food warming area, beverage counter and one all gender restroom.**maher n/a** Complete | Commercial or tenant improvement | Complete | 9 months | |
| Dec 23, 2019 | 98 12th St Interior t.i. for theater & ballet including installation of finishes, furnishing, equiptment & lighting. the project includes mep branching installation tying into the permitted under shell systems & main distribution under pa# 2016-1128-3577. Issued | Revision or supplementType unconfirmed | Issued | 15 months | |
| Oct 7, 2019 | 43 07th Av Erect a 4 stories, 1 dwelling, no basement, type 5, bldg. Issued | New building | Issued | 27 months | |
| Oct 3, 2019 | 37 07th Av To erect 1 story, no basement, type v-b, detached garage. Issued | New building | Issued | 25 months | |
| Jan 30, 2019 | 2615 Larkin St Demo (e) roof materials. installation of roof deck and minor alteration of (e) rooftop stair penthouse. (n) guard rails Issued | Other | Issued | 4 months | |
| Jun 4, 2018 | 2135 Sutter St Basement renovation of (e) space. constrction to include non bearing partitions, finishes & equipment. fire/life safety to remain intact and operation during course of construction change of use from assessory storage to exercise room. non-sprinklered Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Nov 7, 2017 | 168 Welsh St Rear building portion: tenant improvement of (e) office/lab space. ref change of use pa#201710020124. maher n/a. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 2, 2017 | 168 Welsh St For change of use from printing/business sevice to lab use only. establish lab use for 4000 gsf of tenant space on 2nd flr. no construction under this permit. all construction will be under a seperate ti permit. no cfc issued until t/i finaled.school fee if applicable paid under ti. ** maher: n/a ** Complete | Commercial or tenant improvement | Complete | 1 month | |
| Sep 26, 2017 | 906 Vallejo St Roof penthouse over stairs. replace the existing stairs in-kind. provide enclosure at existing stairs Complete | Deck, stairs or patio coverType unconfirmed | Complete | 94 months | |
| Dec 28, 2016 | 2918 Mission St To erect 8 stories, no basement, type iii-a (5 story) / i-a, 75 (3 story) residential units with retail mixed use building. (r-2,m) building on block 6529, lot 002, 002a & 003. ** maher: exempt - approval letter from dph attached ** Issued | New building | Issued | 23 months | |
| Nov 28, 2016 | 30 Otis St To erect 27 stories, 2 basement, type i-a, 404 residnetial units, retail, ballet school & commercial. (r-2,m,b,a-1,a-3,s-2). Reinstated | New building | Reinstated | 26 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Robert Mark Baum? Request a correction.