Russell E Sherman
Architect · Wrns Studio · Belmont
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License delinquentArchitect C-26698First issued Dec 30, 1996, expires Aug 31, 2025.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 7 permits since 2005, 7 in the last 5 years. Latest filed Jul 5, 2023.
- What kind of projects?
- Commercial or tenant improvement 4 · New building 1 · Deck, stairs or patio cover 1
- How long do their permits take?
- Commercial or tenant improvement: 4 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 6,088 permits.
Where
- Mission Bay4
Most recent
- 550 Terry A Francois BlThe south portion of prj is core-shell,"warm shell only" renovation & being submitted for permit as a b-group occupancy. (e) building, both north & south portions, are b-group. (e) service elevator, elevator 5,will be upgraded to serve as a hazardous materials lift. life safety under separate permiFeb 17, 2023Complete
- 550 Terry A Francois BlCut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo.Oct 26, 2022Complete
- 550 Terry A Francois BlFloors 2 throughh 6: interior non-structural demo. all spaces being demolised will remain vacant per ab-017Aug 23, 2022Complete
- 450 South St #0Re-striping e garage to meet 2016 ada parking requirementSep 1, 2017Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 10, 2024 | 550 Terry A Francois Bl Revision to pa#: 202307051465. change fuel line routing, move control panel, add manifold sump. Complete | Revision or supplement | Complete | 1 month | |
| Jul 5, 2023 | 550 Terry A Francois Bl Scope of emergency generator permit is limited to only the emergency generators on the roof, & the associated supporting infrustructure for operation of these generators. this includes installing (x5) diesel generators on the roof, equipment anchorage, and fuel oil supply lines within a new shaft. Complete | Other | Complete | 7 months | |
| Feb 17, 2023 | 550 Terry A Francois Bl The south portion of prj is core-shell,"warm shell only" renovation & being submitted for permit as a b-group occupancy. (e) building, both north & south portions, are b-group. (e) service elevator, elevator 5,will be upgraded to serve as a hazardous materials lift. life safety under separate permi Complete | Commercial or tenant improvement | Complete | 6 months | |
| Jan 30, 2023 | 550 Terry A Francois Bl Revision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule. Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 26, 2022 | 550 Terry A Francois Bl Cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Aug 23, 2022 | 550 Terry A Francois Bl Floors 2 throughh 6: interior non-structural demo. all spaces being demolised will remain vacant per ab-017 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 17, 2021 | 150 Warriors Wy Security upgrades for an (e) parking structure. work included installation of (n) permeter fencing , installation of overhead coiling door at vehicular entries. add (n) card readers. electrical on seperate permit. Complete | Deck, stairs or patio coverType unconfirmed | Complete | Within 1 month | |
| Sep 17, 2019 | 150 Warriors Wy Revision to pa# 2017-0901-6771. restriping of parking structure, owner wishes to make change to stripping plans. no change to charging station or location. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 1, 2017 | 450 South St #0 Re-striping e garage to meet 2016 ada parking requirement Issued | Commercial or tenant improvementType unconfirmed | Issued | 13 months | |
| Jun 21, 2005 | 149 Fell St To erect 5 stories, 2 dwelling mixed used type 1 building. Filed | New building | Filed | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Russell E Sherman? Request a correction.