Thomas Rex Hardy
Architect · Thomas Rex Hardy, Aia · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-12683First issued May 18, 1982, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 16 permits since 2005, 16 in the last 5 years. Latest filed Mar 14, 2025.
- What kind of projects?
- Home remodel 8 · Addition 5 · Other 2
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Castro/Upper Market2
- Noe Valley1
- West of Twin Peaks1
- Oceanview/Merced/Ingleside1
Most recent
- 3835 26th StRemodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings.Jan 3, 2022Complete
- 1083 Portola DrRemodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior doorJul 15, 2021Complete
- 275 Vernon StRebuild central stairs for improved access to all floors, replace 3 rer windows, create 1 (n) bathroom, add radiant floor heat @ lower 2 floors. new floor area. all work done within existing envelope.Jul 15, 2021Complete
- 3872 19th StMinor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroomNov 8, 2019Complete
- 2888 Bush St(n) concrete slab & foundation. finish out lower (garage) level. shift location of (e) garage door & driveway. renovate kitchen & bathrooms. build stair to attic level for future work, phase 2.May 23, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Mar 14, 2025 | 16 West Clay St Minor horizontal addition at 3rd level only. (180 sq ft). at front of home: new closet & exercise space. addition is setback from facade by 5'-3". remove non-historic balaustrades at front, side & rear facades reconstructing closer to original design. reconstruct clay tile rooflets over two front Complete | Addition | Complete | 6 months | |
| Dec 19, 2022 | 3835 26th St Revision to pa# 2022-0103-5270: remove powder room from scope on ground flr. convert powder 102 to closet 102. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 3, 2022 | 3835 26th St Remodel (5) bathrooms, remodel kitchens on 1/f & 2/f, add interior door from garage to house, modify closet & opening @ lower level, remove (2) columns @ lower kitchens, replace (1) ext door w/window, add (1) new door opening replace (4) windows same size (e) openings. Complete | Home remodel | Complete | Within 1 month | |
| Jul 15, 2021 | 1083 Portola Dr Remodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior door Complete | Home remodelType unconfirmed | Complete | 2 months | |
| Jul 15, 2021 | 275 Vernon St Rebuild central stairs for improved access to all floors, replace 3 rer windows, create 1 (n) bathroom, add radiant floor heat @ lower 2 floors. new floor area. all work done within existing envelope. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Jul 9, 2020 | 274 15th Av Replace (e) roof, replace wood stair at rear, replace all windows & add 1 skylight. minor alterations to interior. no expansion of existing bldg envelope or additional floor area. voluntary structural improvements at lower level. Complete | Other | Complete | 2 months | |
| Jan 6, 2020 | 19 Miguel St Revision to pa 2018-0517-9370 - remove 1 bathroom remodel from scope. change solid wall railing for glass railing at stairs (interior) Withdrawn | Revision or supplement | Withdrawn | — | |
| Nov 8, 2019 | 3872 19th St Minor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroom Complete | Home remodel | Complete | 4 months | |
| Sep 6, 2018 | 723 York St Rev to pa# 201708104461; additional detail requested by field inspector: show 1 hr fire rated wall constr. at property line walls Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 20, 2018 | 2888 Bush St Vertical & horizontal addition. re-frame roof to create gable at rear wall. add (2) shed dormers. finish out attic floor level for bedroom, closets & master bath. Complete | Addition | Complete | 8 months | |
| May 23, 2018 | 2888 Bush St (n) concrete slab & foundation. finish out lower (garage) level. shift location of (e) garage door & driveway. renovate kitchen & bathrooms. build stair to attic level for future work, phase 2. Complete | Home remodelType unconfirmed | Complete | 5 months | |
| May 17, 2018 | 19 Miguel St Enclose two existing decks. remodel three bathrooms Complete | Deck, stairs or patio coverType unconfirmed | Complete | 10 months | |
| May 17, 2018 | 80 Sylvan Dr Residential remodel including rear horizontal addition and vertical 3rd fl addition. remodel kitchen and bathrooms. Withdrawn | Addition | Withdrawn | — | |
| Aug 9, 2017 | 3560 Baker St Interior remodel, replace wopod floor in selected area at lower level, alterations to lower level bathroom, open 1 wall between rooms, add beam at ceiling and closet. n/a ordinance #155-13 Complete | Home remodel | Complete | Within 1 month | |
| Sep 29, 2016 | 3872 19th St Alteration to kitchen & bathrooms, no work to exterior. Complete | Home remodel | Complete | 1 month | |
| Jul 8, 2014 | 1001 Chestnut St Two story addition to mudrom/solarium at side of house. reconstruct failed retaining wall alone chestnut st & realigned service stairway. minor revision to rear roof eave of existing house. Issued | Addition | Issued | 8 months | |
| Mar 4, 2011 | 1234 Page St #0 Replace existing non-historic entry door & balustrades at front. restore wood paneling at entry. replace transom. Complete | Other | Complete | Within 1 month | |
| May 13, 2009 | 678 26th Av Horizontal addtion (1 story) at rear at grade level to create bedroom and bathroom suite. Complete | Addition | Complete | 5 months | |
| Apr 22, 2005 | 1234 Page St #0 Bathroom alterations at 2nd floor Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Thomas Rex Hardy? Request a correction.