Vahid Sattary
Engineer · Sattart Structural Engineer · Kensington
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-3973First issued Feb 10, 1995, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 36 permits since 2005, 36 in the last 5 years. Latest filed Jul 20, 2026.
- What kind of projects?
- Home remodel 9 · Deck, stairs or patio cover 7 · Commercial or tenant improvement 6
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 13,900 permits.
Where
- Financial District/South Beach2
- Nob Hill1
- Marina1
- Outer Richmond1
Most recent
- 1158 Sutter StRepair of existing concrete cracks on garage ceiling beams, wall surface and stairway column. structural stengtheningJul 20, 2026Issued
- 1940 Vallejo St #9Unit 9: interior remodel, no new structural load bearing walls, update kitchen, bathrooms & other w/new electrical/light fixtures, plumbing & mechanical, new fixtures & cabinetsSep 13, 2023Complete
- 5000 Fulton StRepair damage to small area of southeast corner wall caused by a car crash: repair framework; replace garage door frame/casings; replace garage door. to comply w/202291197.Sep 1, 2022Complete
- 5 Burnett Ave North Av #2Repair a cracked 4x12 wood beam in an (e) four-story multifamily residential condo.Jan 31, 2022Complete
- 685 Market StGround floor - core & shell strengthen 3 floor beams fill in slab at existing doorJan 28, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 20, 2026 | 1158 Sutter St Repair of existing concrete cracks on garage ceiling beams, wall surface and stairway column. structural stengthening Issued | Home remodel | Issued | Within 1 month | |
| Jun 24, 2026 | 555 Mission St #0 21st fl - interior ti to demo and construction new non-structural partitions, ceilings, finishes and associated mep Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 13, 2026 | 1365 Scott St #6 Unit #6: balcony repair inkind, blacony size 10x5.3. new 4x12 pressure treated, new 2x8 pressure treated, new 2x6 redwood decking. metal hangers. will keep existing metal handrail Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Apr 13, 2026 | 1357 Scott St Balcony repair inkind - balcony size 10x5.3" new 4x12 pressure treated, new 2x8, new 2x6 redwood decking, metal hangers will keep existing metal handrail Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Nov 24, 2025 | 299 West Portal Av Change of use tenant improvement & minor expansion (nw eleveation). (n) retail health services ophthalmology clinic & relocated retail & personal services. (n) office based surgical spaces shall operate under license of dr's & is not subject to review by hchi (oshpd) nor as an asc. Issued | Commercial or tenant improvement | Issued | 9 months | |
| Dec 6, 2024 | 143 Laidley St Replace glass guardrail in (e) balcony & repair or replace waterproofing impacted by guardrail work Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Oct 15, 2024 | 1000 Lombard St Revision to 202407126367: e windows on the kitchen of proposed 3rd fl plan sheet a2.3 to be replaced with wood frame alum clad exterior, color tbd by owner. to clarify alum clad windows. Issued | Revision or supplement | Issued | Within 1 month | |
| Jul 3, 2024 | 149 Cole St Replace backyard concrete slab to resolve nov# 202305245. Issued | Legalize or fix a violation | Issued | 2 months | |
| Sep 13, 2023 | 1940 Vallejo St #9 Unit 9: interior remodel, no new structural load bearing walls, update kitchen, bathrooms & other w/new electrical/light fixtures, plumbing & mechanical, new fixtures & cabinets Complete | Home remodel | Complete | Within 1 month | |
| May 10, 2023 | 3 Burnett Ave North Av #3 Unit 3: repair e deck walking surface only, like for like and correct waterproofing damage. no change made to structural system. orig plan 7912459. repairs do not alter orig building or seismic force resisting system or improse any additional weight. Complete | Deck, stairs or patio cover | Complete | 1 month | |
| Nov 30, 2022 | 555 Post St Priority process - exterior repairs/deferred maintenance in compliance w/facade/inspection ord. remove brick to determine condition of embedded steel. repair/waterproofing of (e) embedded steel elements. replace corroded steel w/in wall. r/r brick as needed. repointing of brick mortar joints. Issued | Other | Issued | 46 months | |
| Sep 1, 2022 | 5000 Fulton St Repair damage to small area of southeast corner wall caused by a car crash: repair framework; replace garage door frame/casings; replace garage door. to comply w/202291197. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| May 23, 2022 | 1919 Quesada Av Build new 452 sf deck/stairs and new railing at the back of the property, 5lf from p|l. Complete | Deck, stairs or patio cover | Complete | 23 months | |
| Apr 12, 2022 | 555 Mission St #0 16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception, bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17th Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 31, 2022 | 5 Burnett Ave North Av #2 Repair a cracked 4x12 wood beam in an (e) four-story multifamily residential condo. Complete | Home remodel | Complete | Within 1 month | |
| Jan 28, 2022 | 351 California St #0 New storefront system and entry door at 2nd bay from east side of building. new exterior steps at entrance. new accessible entry at east wall of exterior vestibule. Issued | OtherType unconfirmed | Issued | 4 months | |
| Oct 3, 2020 | 550 California St #0 Rooftop: furnish & install stell catwalk on top of (e) steel structure on the roof. Complete | Deck, stairs or patio cover | Complete | 1 month | |
| Jul 23, 2020 | 650 24th Av Remodel and add 1 story to existing 2 story single family dwelling. Complete | Addition | Complete | 12 months | |
| Mar 2, 2020 | 75 Hawthorne St Revise (e) 7th fl roof tie back to conform with cal osha. Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Jan 28, 2020 | 685 Market St Ground floor - core & shell strengthen 3 floor beams fill in slab at existing door Complete | Home remodel | Complete | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Vahid Sattary? Request a correction.