Val Larry Dizitser
Engineer · Western Design · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-55483First issued Jul 26, 1996, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 33 permits since 2004, 33 in the last 5 years. Latest filed Feb 25, 2026.
- What kind of projects?
- Addition 14 · Home remodel 9 · Commercial or tenant improvement 3
- How long do their permits take?
- Addition: 16 months. City typical for the same review: 4 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 14 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 245 permits.
Where
- Sunset/Parkside4
- Excelsior2
- Pacific Heights1
- Inner Sunset1
Most recent
- 2262 Pine StAddition and interior alts: 2-story rear yard addition. remodel to (e) kitchens and bathrooms. new bathrom on 1/f & 2/f. structural changes to basement only.Feb 25, 2026Issued
- 228 Prague StTwo stories deck addition at the rear of the bldg. bathroom addition at 1st flr. replacement of the window at the kitchen with a glass sliding door. the existing storage/garden tool shet to be removed (4/11/2022)Mar 30, 2021Issued
- 3055 22nd AvNew second fl addition. extend bedroom on second floor over (e) first floor.Sep 16, 2020Issued
- 2435 21st AvExpansion of the (e) sfd by adding habitable space & roof deck @ the 3rd floor level @ the rear of the building.Oct 8, 2019Issued
- 1937 17th AvHorizontal extension @ the rear of the building & vertical 3rd story addition. remodeling of (e) single family residence. addition of accessory dwelling unit @ the 1st floor.Aug 6, 2019Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Feb 25, 2026 | 2262 Pine St Addition and interior alts: 2-story rear yard addition. remodel to (e) kitchens and bathrooms. new bathrom on 1/f & 2/f. structural changes to basement only. Issued | Addition | Issued | 6 months | |
| Dec 27, 2023 | 1923 32nd Av Dry rot repair at garage of existing house, structural repair and replacement in-kind of dry rot column and beam at garage, repair of stucco at the area of work. Complete | Home remodel | Complete | Within 1 month | |
| May 4, 2023 | 2435 21st Av Revision to pa# 201910083802. reduce the adu addition @ rear of the building from 2 stories to a single story. 2 bedrooms, living room, kitchen & 1 bathroom. Issued | Revision or supplement | Issued | 7 months | |
| May 4, 2023 | 2435 21st Av Revision to pa# 201910083800. reduce the addition to (e) single family dwelling by adding habitable space & roof deck @ 2nd floor level & reduce the addition to balcony @ 3rd floor level @ rear of the building. Issued | Revision or supplement | Issued | 7 months | |
| Nov 16, 2021 | 75 Wood St To comly with planning enforcment case no. 2019-007115enf. legalize fill-in (under 10 ft) storage room at ground floor. under cantilever at rear. Complete | Legalize or fix a violation | Complete | 2 months | |
| Mar 30, 2021 | 228 Prague St Two stories deck addition at the rear of the bldg. bathroom addition at 1st flr. replacement of the window at the kitchen with a glass sliding door. the existing storage/garden tool shet to be removed (4/11/2022) Issued | Addition | Issued | 17 months | |
| Jan 15, 2021 | 2354 15th St Rev to delta 4 to pa201112301484: rebuilt dry rotted fireplace flue chase; structural framing mods; rebuilt dryrot ext wall and foundation on w/s; replace leaking windows inkind, relace dryrotted frame; replace water heater; reconfig interior stairs. Withdrawn | Revision or supplement | Withdrawn | — | |
| Sep 16, 2020 | 3055 22nd Av New second fl addition. extend bedroom on second floor over (e) first floor. Issued | Addition | Issued | 34 months | |
| Oct 8, 2019 | 2435 21st Av Per adu ordinance# 95-17, add adu @ the rear of the building. 2 bedroom & 3 bathrooms. Issued | ADU | Issued | 29 months | |
| Oct 8, 2019 | 2435 21st Av Expansion of the (e) sfd by adding habitable space & roof deck @ the 3rd floor level @ the rear of the building. Issued | Addition | Issued | 29 months | |
| Sep 11, 2019 | 1806 28th Av Remove existing window at storage room. infill with 1 hr fire resistive wall. not visible from street Issued | OtherType unconfirmed | Issued | Within 1 month | |
| Aug 6, 2019 | 1937 17th Av Horizontal extension @ the rear of the building & vertical 3rd story addition. remodeling of (e) single family residence. addition of accessory dwelling unit @ the 1st floor. Issued | Addition | Issued | 57 months | |
| Dec 26, 2018 | 1487 43rd Av Revision to 201610311465: to abate dbi violation 201814281 and case no. 2019-005440enf with demolition calculations per section 317 and facade work per dbi correction notice and 2019-005440enf. provide clarification for the as build condition. Complete | Revision or supplement | Complete | 7 months | |
| Oct 14, 2016 | 1688 Page St 1st flr: horizontal extension & addition at the back of the bldg. expansion of dwelling unit#1 by converting of the portion of the garage to a hibitable space new plumbing, electrical & new heating. 2nd flr horizontal extension & addition at the back of the building comple interior remodeling of Filed | Addition | Filed | — | |
| May 11, 2016 | 2445 Rivera St Reduction and renovation of bathroom #1, conversion of closet space to bathroom #2. Complete | Home remodel | Complete | Within 1 month | |
| Dec 11, 2015 | 230 Avila St Revision to pa 2012-0601-1662 - realignment of light court at the right side of the bldg; removal of skylight at the 3rd floor roof deck; reconfiguring roof drainage. (maher n/a) Expired | Revision or supplement | Expired | 4 months | |
| Dec 5, 2014 | 1370 Sloat Bl Remove existing window at the family room and install exterior door at the same location, build concrete landing adjacent to the new door. Complete | Other | Complete | Within 1 month | |
| Sep 9, 2014 | 827 34th Av 1st floor: convert portion of the 1st floor to a dwelling unit# 1 including horizontal addition @ the back of the building. 2nd floor: interior alteration & remodel include horizontal additoin @ the rear of dwelling unit# 2. Issued | Commercial or tenant improvement | Issued | 18 months | |
| Mar 25, 2013 | 1221 Plymouth Av 1st floor:interior alteration and remodeling consisting on the following, bldg a family room, bedroom #3, bathroom #2, hallway with spiral stairway, new plmg heating and electrical. 2nd floor:new opening for the spiral stairway to the 1st floor. Complete | Home remodel | Complete | Within 1 month | |
| Nov 28, 2012 | 695 Los Palmos Dr Revision to pa# 201207094295. remove deck addtion at the rear yard. relocate gas meter, exterior door and stairway at the basement floor. relocate bathroom #2, #3 and laundry at the 1st floor. new workshop/storage & exercise room. add window at kitchen & bathroom #1. minor modificaiton at 1st fl. Issued | Revision or supplement | Issued | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Val Larry Dizitser? Request a correction.