Vanessa Liu
Architect · Enspace Co. · Drexel Hill
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-37015First issued Apr 17, 2018, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 11 permits since 2018, 11 in the last 5 years. Latest filed Feb 17, 2022.
- What kind of projects?
- Commercial or tenant improvement 4 · Home remodel 2 · Legalize or fix a violation 2
- How long do their permits take?
- Commercial or tenant improvement: 8 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Lone Mountain/USF1
- Mission1
- Financial District/South Beach1
- South of Market1
Most recent
- 1751 Fulton StConvert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope.Feb 17, 2022Complete
- 846 Capp St #0Convert basement for (2) (n) residential units. interior non-structural wall demolition & re-layout. (n) partitions, add bathrooms, paint, lower (e) floor & (n) floor finish. nfpa 13 sprinkler system in basement level.Mar 16, 2021Issued
- 12 Tillman PlT.i.: non-structural wall demo, new interior wals, new ada bathroom. no exterior work.Oct 29, 2020Complete
- 565 Natoma StScope of work includes basement renovation, one new unit (565b natoma: with 2 bedrooms and 2 bathrooms), utility relocation, laundry relocation, and water heater replacement (to be design-build by contractor).Sep 23, 2020Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Apr 19, 2023 | 2108 Hayes St Unit 5: revision to bpa#202302282735, add another bathroom and vonert living room to bedroom. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 17, 2022 | 1751 Fulton St Convert an (e) vacant commercial bldg to a gymnasium. the scope of work includes facade renovation, new interior partitions, new flooring, new bathrooms, and new skylights. there is no expansion in bldg envelope. Complete | Commercial or tenant improvement | Complete | 10 months | |
| Jan 10, 2022 | 115 B Prospect Av #0 Interior renovations only. non-structural wall changes, kitchen renovation, and new paint. Issued | Home remodel | Issued | Within 1 month | |
| Nov 5, 2021 | 115 B Prospect Av #0 Interior renovations only, non-strutural wall changes, bathroom 1st fl. renovation,new flooring & new paint. 1st & 2nd fl. Issued | Home remodel | Issued | Within 1 month | |
| May 10, 2021 | 1663 Mcallister St #0 The project proposes adding a new detached accessory dwelling unit to an existing two-story over basement multi-family building in an rm-1 residential mixed, low density zoning district. Filed | New building | Filed | — | |
| Mar 17, 2021 | 1375 24th Av Revision to pa#201811307126. alter site. the new includes interior renovations and horizontal expansion into the rear yard in the existing ground floor. Complete | Revision or supplement | Complete | 8 months | |
| Mar 16, 2021 | 846 Capp St #0 Convert basement for (2) (n) residential units. interior non-structural wall demolition & re-layout. (n) partitions, add bathrooms, paint, lower (e) floor & (n) floor finish. nfpa 13 sprinkler system in basement level. Issued | Commercial or tenant improvementType unconfirmed | Issued | 7 months | |
| Oct 29, 2020 | 12 Tillman Pl T.i.: non-structural wall demo, new interior wals, new ada bathroom. no exterior work. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Sep 23, 2020 | 565 Natoma St Scope of work includes basement renovation, one new unit (565b natoma: with 2 bedrooms and 2 bathrooms), utility relocation, laundry relocation, and water heater replacement (to be design-build by contractor). Issued | Commercial or tenant improvementType unconfirmed | Issued | 18 months | |
| Dec 27, 2019 | 355 Oak Park Dr Residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroom Complete | Legalize or fix a violation | Complete | 6 months | |
| Nov 18, 2019 | 524 A 34th Av Legalization of unpermitted unit per ordiance 43-14 on first floor. Complete | ADU | Complete | 28 months | |
| Oct 11, 2019 | 4801 Geary Bl #1010 Rev to pa201902253739 on post caps. (post anchors). structural calcs for punching bag supports. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 25, 2019 | 4801 Geary Bl #1010 To comply with nov #201921306. the projet proposes conversion of a mattress firm retail to a fitness gym on the ground floor retail spaces of an extg 4 story mixed use bldg in an nc-3 district. the work includes installation of fitness equipment and construction of a post to beam structure to Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Nov 30, 2018 | 1375 24th Av Vertical additions & alterations to (e) 2-story residential bldg in rh-2 zone. work includes interior renovations, a 3rd flr addition, renovation of facade & full seismic retrofit. there is no horizontal expansion in (e) ground flr & 2nd flr. Complete | Addition | Complete | 12 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Vanessa Liu? Request a correction.