Zack Kardon
Engineer · Murphy Burr Curry Inc. · Moraga
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-69106First issued Jan 20, 2006, expires Jun 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 48 permits since 2016, 48 in the last 5 years. Latest filed Oct 23, 2026.
- What kind of projects?
- Commercial or tenant improvement 19 · Deck, stairs or patio cover 11 · Other 8
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 19 permits in San Francisco
Time to get a permit
Median from filing to permit, from 15 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 16,451 permits.
Where
- Financial District/South Beach5
- Chinatown3
- Mission3
- Pacific Heights2
Most recent
- 1 Market St1 market plaza aka 55 spear st 6/f: full floor office t.i. on the 6th floor. including construction of open offices, meeting rooms and break rooms. structural includes anchoring of phone booths and partial height walls.Oct 23, 2026Filed
- 130 Sutter St3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately.Jun 30, 2026Filed
- 300 Howard St2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms.Dec 4, 2025Withdrawn
- 295 Bay StInterior only work. new communicating stair, new millwork, slab infill at l1 & l2.Oct 27, 2025Complete
- 633 Battery StNew interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861Dec 16, 2024Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 23, 2026 | 1 Market St 1 market plaza aka 55 spear st 6/f: full floor office t.i. on the 6th floor. including construction of open offices, meeting rooms and break rooms. structural includes anchoring of phone booths and partial height walls. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 11, 2026 | 315 Montgomery St 9th and 10th floor:submittal of differed mechanical, electrical and structural drawings related to building pa #202607295731 (anchrage of phone booth Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 4, 2026 | 2 Henry Adams St Ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered) Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Jul 1, 2026 | 555 California St Revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 30, 2026 | 130 Sutter St 3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately. Filed | Commercial or tenant improvement | Filed | — | |
| May 15, 2026 | 85 02nd St 2nd and 3rd floor: - revision to bpa: 202604219805. adding structural for the phone booths. Filed | Revision or supplement | Filed | — | |
| Apr 13, 2026 | 555 California St #0 30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 16, 2025 | 600 Townsend St 2/f: revision to permits 202507221305 and 202510298361 to add (11) phone rooms. structural details included. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 4, 2025 | 300 Howard St 2/f: new fitness area, golf simulator, restrooms, locker rooms, assembly spaces, pantry, and conference rooms. Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Oct 27, 2025 | 295 Bay St Interior only work. new communicating stair, new millwork, slab infill at l1 & l2. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 19, 2025 | 3565 California St Exterior building shell renovation of north and south facades. scope includes new exterior walls, storefronts, and trash enclosure and new interior structural columns, beams, and foundations. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Aug 5, 2025 | 1825 Post St Replace: 6 rooftop air handling units, 6 condensing units, 1 boiler and 4 exhaust fans. Complete | Other | Complete | 1 month | |
| Jan 21, 2025 | 1060 Key Av Voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building. Issued | Seismic retrofit or foundation | Issued | 5 months | |
| Dec 16, 2024 | 633 Battery St New interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain. share plans with 202412166861 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 16, 2024 | 615 Battery St New interior communicatiing opening between 6th fl of 615 battery st and 633 battery st. work includewsw demo of portion of perimeter wallk, construction of new concrete lintel, and new roll down fire doors on both sides of the opening, new drinking fountain Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| May 23, 2024 | 275 South Van Ness Av Revision to pa # 2022-1222-9044 & 2022-1222-9047 structural revisions. ref permits 202305198219, 202305238412, 202304145800, 202304145798 Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 23, 2024 | 1940 Broadway Installation of new steel fall protection guardrails at the (e) parapet locations w/height of less than 42" above walking surface of roof (90 lineal feet guardrail. not visible street Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Apr 4, 2024 | 1000 Van Ness Av Pinning terra cotta on exterior of bldg as identified location by civil engineer. all three sides of bldg. Issued | OtherType unconfirmed | Issued | Within 1 month | |
| Feb 9, 2024 | 1940 Broadway At front south elevation, remove and replace (e) water table/cornice at 4th floor, to match (e) at north and east and west rear elevation repair concrete parapet wall. Complete | Other | Complete | Within 1 month | |
| Feb 7, 2024 | 548 Delta St To accommodate a "0-5yr" childcare center. will serve approximately 60 children in 4 classrooms: 1 infant, 1 toddler, & 2 pre-k. will contain a family resource center & teacher/staff lounge. interior demolition as req. non-bearing partitions, mep, replace (e) windows & doors. (n) lula elevator, Complete | Commercial or tenant improvement | Complete | 6 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Zack Kardon? Request a correction.