Adam Frederick Klein
Engineer · Bkg Structural Engineers · San Carlos
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5941First issued Jun 17, 2013, expires Jun 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 24 permits since 2016, 24 in the last 5 years. Latest filed Jun 8, 2026.
- What kind of projects?
- Home remodel 13 · Addition 4 · Deck, stairs or patio cover 2
- How long do their permits take?
- Home remodel: 3 months. City typical for the same review: 4 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 6,181 permits.
Where
- Presidio Heights1
- Seacliff1
- Inner Sunset1
- Glen Park1
Most recent
- 3330 Jackson StMajor renovation of interior spaces; replacement of existing staircase; expansion of the kitchen on the rear(north facade) to incorporate expansive glass door; all (e) windows, interior and exterior finishes to be replaced.Jun 8, 2026Issued
- 710 El Camino Del Mar #0Renovation of interior spaces; replacement of the (e) stairs, reconfiguration of some windows on the east facade, and a comprehensive transformation of the rear (north) facade to incorporate new windows, new finishes, and fixtures throughout.Nov 19, 2024Issued
- 1234 Stanyan StInterior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration.Jul 8, 2022Complete
- 8 Miguel StInterior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building.Jul 28, 2021Complete
- 60 Hazelwood AvPartially excavate (e) lower level to create new bedroom, bathroom and sitting room. renovate ktichen at upper level. replce interior stairs.Jan 29, 2021Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 28, 2026 | 3330 Jackson St Revision to permit 202605181476. plan updates to third and fourth floor. addition of (rear) landscape scope. strucutral changes. Filed | Revision or supplement | Filed | — | |
| Jun 8, 2026 | 3330 Jackson St Major renovation of interior spaces; replacement of existing staircase; expansion of the kitchen on the rear(north facade) to incorporate expansive glass door; all (e) windows, interior and exterior finishes to be replaced. Issued | Home remodelType unconfirmed | Issued | 3 months | |
| May 13, 2026 | 2636 Green St Revision to pa# 202603187814, remove roof deck scope @ 4/f, replace fire escape inkind, replace all mechanical equipment. bathroom scope changes @ 3/f: remodel (e) primary bath, remodel (e) bath between bedrooms, remove (e) bath @ top of stairs. new bath @ library, remodel half-bath @ 4/f inkind. Approved | Revision or supplement | Approved | — | |
| Aug 26, 2025 | 710 El Camino Del Mar #0 Structural work for interior stairs of residence. architectural information was already permitted in pa #202410243675 Issued | Revision or supplementType unconfirmed | Issued | 3 months | |
| Nov 19, 2024 | 710 El Camino Del Mar #0 Renovation of interior spaces; replacement of the (e) stairs, reconfiguration of some windows on the east facade, and a comprehensive transformation of the rear (north) facade to incorporate new windows, new finishes, and fixtures throughout. Issued | Home remodel | Issued | 3 months | |
| Sep 10, 2024 | 2610 Pacific Av Foundation replacement & seismic upgrade; full interior remodel; exterior window replacement; horizontal extension of rear deck Withdrawn | Seismic retrofit or foundationType unconfirmed | Withdrawn | — | |
| Aug 19, 2024 | 2076 14th Av To excavate 3' from backyard doing a osha. cut for shoring Withdrawn | Retaining wall or site work | Withdrawn | — | |
| Apr 29, 2024 | 2899 Vallejo St Revision to 201711274839 s1 & s2 to document as- built conditions including external openings, alteration of internal spiral to square. addition of external spiral stair. proposed trim at facade. no change to special inpsections - see pa 201711274839-s1 Complete | Revision or supplement | Complete | 7 months | |
| Mar 21, 2024 | 2640 Jackson St #0 Replace and expand 2nd floor deck. replace 3rd floor deck. infill at 3rd floor rear facade and expand 4/f balcony. ref# 202304065224 Expired | Deck, stairs or patio cover | Expired | 2 months | |
| Mar 18, 2024 | 2636 Green St Structural revision to pa# 202312192746: roof pop-up strengthening due to wood rot and unsafe current conditions viewed during field investigation. Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 2, 2023 | 1234 Stanyan St Revision to bpa#202207088027, adjust position of proposed skylights, provide note to fire rate window, and reframing (e) damaged & substandard framing. allwork previously approved.enlarge footing at grid line 2, replace (e) 2x10 joist at first level in area indicated in plan, replace in-kind framing Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 18, 2022 | 671 04th Av Structural revision to pa 2021-0208-4212 updates to sheets s2.0, s2.1 and s3.0. no other changes Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 8, 2022 | 1234 Stanyan St Interior remodel and renovation of kitchen, bathrooms, and laundry. replacement of one window and patio door within existing openings. new skylights. no building envelope expansion. rear stair configuration. Complete | Home remodel | Complete | 3 months | |
| Apr 20, 2022 | 2112 18th St Re-build existing rear main level deck. add a roof deck with spiral staircases in the rear yard. Complete | Deck, stairs or patio cover | Complete | 21 months | |
| Apr 12, 2022 | 100 Palo Alto Av Revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. revise exterior finish at siding. revise interior doors. stair reconfiguration. window heights revised at 3 locations. tesla solar roof on deferred permit submittal. Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 7, 2022 | 1558 Grove St Ground floor expansion at rear and dormer at stair. Complete | Addition | Complete | 13 months | |
| Jan 14, 2022 | 9 Rio Ct Replace (e) window @ rear with a sliding door. Issued | Other | Issued | 1 month | |
| Dec 7, 2021 | 100 Palo Alto Av Structural revisions and deferred mep for 2021-0804-5817 includes flooring reinforcement. addition of steal channels at the stair opening (n) psl headers, updated deck floor framing details, updated interior railing detail Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 4, 2021 | 100 Palo Alto Av Revision to pa# 201604296200, 201709137870, 201711214543, 202003025924, 202010307876. work includes changes to interior layout, new stairs, new trash enclosure. reconfigure exterior window openings. new skylights. new roofing finishes. Complete | Revision or supplement | Complete | 1 month | |
| Jul 28, 2021 | 8 Miguel St Interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Adam Frederick Klein? Request a correction.