Anne Marie Cervantes
Architect · Cervantes Design Assoc. · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-18037First issued Apr 1, 1987, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 21 permits since 2004, 21 in the last 5 years. Latest filed Sep 29, 2026.
- What kind of projects?
- Commercial or tenant improvement 12 · Other 5 · Home remodel 1
- How long do their permits take?
- Commercial or tenant improvement: 6 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 12 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 20,678 permits.
Where
- Mission7
- South of Market2
- Financial District/South Beach1
- Bernal Heights1
Most recent
- 1117 Market StExisting door door#104: reverse swinging. add 180 reverse hings with exit device and magnetic hold opens to be intergrated with bldg fire alarm system. no demo or changes to adjacent walls in fire rating, type or location.Aug 13, 2026Filed
- 2929 19th StBarrier removal -modernize existing elevator upgrade accessible signage, replace finishes, flooring, paint, paint adjacent lobby.Sep 3, 2025Filed
- 1240 Valencia StRoofing: (n) silicon coating and metal flashing on (e) concrete roof. no hot works.Sep 4, 2024Complete
- 4 Embarcadero CenterSuite 101: demolition of (e) casework and booths, new bar casework, new partition walls, new all infill, new butler door, new light fixtures and new bar and handwash sinks. patch and repair of (e) floor tiles, new paint finishAug 30, 2023Issued
- 1117 Market StG/f & 2/f: new office partitions, ceiling, lighting, power/data, casework, signage, toilet accessories, interior stair, interior windowsAug 3, 2023Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 29, 2026 | 2929 19th St Legalize existing kitchen. no new construction Filed | Legalize or fix a violation | Filed | — | |
| Aug 13, 2026 | 1117 Market St Existing door door#104: reverse swinging. add 180 reverse hings with exit device and magnetic hold opens to be intergrated with bldg fire alarm system. no demo or changes to adjacent walls in fire rating, type or location. Filed | Commercial or tenant improvementType unconfirmed | Filed | — | |
| May 20, 2026 | 1117 Market St G/f and 2/f: revision to permit 202308033645. change to floor plan layout. no change to plumbing fixtures. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 3, 2025 | 2929 19th St Barrier removal -modernize existing elevator upgrade accessible signage, replace finishes, flooring, paint, paint adjacent lobby. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 10, 2024 | 1240 Valencia St Rev 201912139558- to renovate (e) site ada ramp and bike racks facing front of building. scope includes (n) 3 ft play area fence located at front Complete | Revision or supplement | Complete | 3 months | |
| Sep 10, 2024 | 1240 Valencia St Revision to pa # 2019-1230-0998 non structural ti to create 1 infant, 1 preschool & 2 toddler classroom with 4 bathrooms & 2 offices. (e) sklights to be covered with new lights. revise change of use from e to i-4. Complete | Revision or supplement | Complete | 2 months | |
| Sep 4, 2024 | 1240 Valencia St Roofing: (n) silicon coating and metal flashing on (e) concrete roof. no hot works. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 9, 2024 | 1240 Valencia St Non-struc revisions to pa 201912189882. change use and occup to e daycare. rev to incl: create 1 pre-school and 1 toddler classroom, restroom layout modifications, add 2 child restrooms, removal of (e) skylights, create electrical room and add additional lighting. these plans supersede 202010086195 Complete | Revision or supplement | Complete | 3 months | |
| Aug 30, 2023 | 4 Embarcadero Center Suite 101: demolition of (e) casework and booths, new bar casework, new partition walls, new all infill, new butler door, new light fixtures and new bar and handwash sinks. patch and repair of (e) floor tiles, new paint finish Issued | Commercial or tenant improvement | Issued | 4 months | |
| Aug 3, 2023 | 1117 Market St G/f & 2/f: new office partitions, ceiling, lighting, power/data, casework, signage, toilet accessories, interior stair, interior windows Complete | Commercial or tenant improvement | Complete | 23 months | |
| May 18, 2023 | 1117 Market St Structural work only: re-supporting the rear 2nd floor, other works are under separate permit: accessibility upgrade, t.i., new stair from ground floor to 2/f floor, accessible upgrades- toilet rooms (under sep permits) Complete | Home remodel | Complete | 26 months | |
| Dec 13, 2022 | 2081 Mission St Ada toilet, entrance upgrades & tenant improvements. converting (e) non ada toilet to (n) ada toilet rm, (n) janitor's closet, (n) storefront system, (n) rear exit door, (n) ada stall parking, (n) flooring and paint, additional (n) lighting design build: mep and signage. Issued | Commercial or tenant improvement | Issued | 4 months | |
| Dec 12, 2022 | 3355 Mission St #0 Ada toilet and entrance upgrades &minor structural upgrade. converting (2) non ada toilet into (1) ada toilet & non-ada toilet. minor structural upgrade at (e) kitchen area.add handrails @ (e) 3 step up from (e) bar to (e) restaurant. (n) door replacement at mission st (e) entry to comply with abe. Complete | Commercial or tenant improvement | Complete | 12 months | |
| Mar 10, 2022 | 42 De Montfort Av Emergency evacuation signs "fire permit only" Filed | Other | Filed | — | |
| Mar 10, 2022 | 420 Eddy St Emergency evacuation signs "fire permit only" Filed | OtherType unconfirmed | Filed | — | |
| Mar 10, 2022 | 250 Kearny St Emergency evacuation maps/signs (29) for fire only permit. Issued | OtherType unconfirmed | Issued | 8 months | |
| Mar 10, 2022 | 27 De Montfort Av Emergency evacuation signs. fire only permit Filed | OtherType unconfirmed | Filed | — | |
| Mar 10, 2022 | 1060 Howard St Emergency evac signs fire only permit Filed | OtherType unconfirmed | Filed | — | |
| Oct 8, 2020 | 1240 Valencia St Minor non-structural revisions to approved pa 201912189882. revision includes restroom layout modifications to create 2 child restrooms. Complete | Revision or supplement | Complete | 11 months | |
| Dec 31, 2019 | 1950 Mission St Tenant interior improvements. early care and education center/child care center. Complete | Commercial or tenant improvement | Complete | 9 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Anne Marie Cervantes? Request a correction.