Antje Paiz
Architect · Raumfabrik · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-31989First issued Apr 27, 2009, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 46 permits since 2015, 46 in the last 5 years. Latest filed Oct 19, 2026.
- What kind of projects?
- Home remodel 18 · Addition 13 · Other 6
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 18 permits in San Francisco
Time to get a permit
Median from filing to permit, from 18 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 19,950 permits.
Where
- Lone Mountain/USF3
- Castro/Upper Market3
- Inner Sunset2
- Glen Park2
Most recent
- 514 Clipper StInterior remodel of 2nd floor unit including replacing three windows on the east side, adding built ins at living room, modifying (e) skylight, adding new skylight.Sep 30, 2026Issued
- 410 Vienna StInterior remodel of bathroom #1 on 2nd floor, construction of miscellaneous non-bearing walls, installation of new skylight and perform associated ceiling and roof framing.Sep 17, 2026Issued
- 401 Montecito AvConvert 1358 sf at lower floor storage area into living space to include 2 bedrooms, bathroom, living room with 2 burner kitchenette and laundry room with internal connection to upper floor. remodel storage and mech spaceMay 14, 2026Issued
- 503 Hugo St #0G/f -convert (e) closet to half bath, replace 1 rear facing window in e) openingFeb 25, 2026Complete
- 367 16th AvNew 1st floor wine cellar. 2nd floor kitchen remodel. 2nd floor fireplace remodel. no exterior change and no new conditioned space.Jul 8, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 19, 2026 | 940 Bay St Unit #18 code compliance. comply with nov 2025 39221. add new beams, remove non-load bearing wall. Triage | Legalize or fix a violation | Triage | — | |
| Sep 30, 2026 | 514 Clipper St Interior remodel of 2nd floor unit including replacing three windows on the east side, adding built ins at living room, modifying (e) skylight, adding new skylight. Issued | Home remodel | Issued | Within 1 month | |
| Sep 18, 2026 | 145 Jordan Av Full house remodel with rear addition at all levels, adding a total of 465 sf of floor area. no changes to front facade- slight expansion andd deck. ab112 Triage | Addition | Triage | — | |
| Sep 17, 2026 | 410 Vienna St Interior remodel of bathroom #1 on 2nd floor, construction of miscellaneous non-bearing walls, installation of new skylight and perform associated ceiling and roof framing. Issued | Home remodel | Issued | Within 1 month | |
| Sep 16, 2026 | 410 Vienna St Revision to pa#202606102930 & 201802131186 to reflect actual work done in basement(per inspector). room is now called "office"(used as an office) and a door leads directly to garage. Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 6, 2026 | 34 St Marys Av First floor horizozntal addition (increase of 131sq ft of habitable living space). second floor vertical addition (increase of 681 sq ft of habitable living space). rear patio replacement. interior remodel. Filed | Addition | Filed | — | |
| May 14, 2026 | 401 Montecito Av Convert 1358 sf at lower floor storage area into living space to include 2 bedrooms, bathroom, living room with 2 burner kitchenette and laundry room with internal connection to upper floor. remodel storage and mech space Issued | Home remodel | Issued | Within 1 month | |
| Mar 13, 2026 | 1269 05th Av Revision to #202507020073 - window changes + new skylight. addition of shoe cabinet Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 25, 2026 | 503 Hugo St #0 G/f -convert (e) closet to half bath, replace 1 rear facing window in e) opening Complete | Home remodel | Complete | Within 1 month | |
| Dec 23, 2025 | 367 16th Av Revision 202507080325- replace 2 windows in kind at 1st floor garage not facing street. and (n) door, replace landing and planting area and 2 stair steps at rear yard at grade. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 15, 2025 | 1269 05th Av Remodel of 2 unit bldg with 450 squre foot additon at 1st and 2nd floor(unit 1269) and 94 square foot additon at 3rd floor(unit 1271) Issued | Addition | Issued | 4 months | |
| Jul 8, 2025 | 367 16th Av New 1st floor wine cellar. 2nd floor kitchen remodel. 2nd floor fireplace remodel. no exterior change and no new conditioned space. Complete | Home remodel | Complete | 3 months | |
| Jun 24, 2025 | 2762 21st St Remodel of entire house and a 2nd story addition with front and rear roof decks on 2nd level. Issued | Addition | Issued | 8 months | |
| Apr 22, 2025 | 2938 Pierce St Rev 202409160848: changes to layout, deck & basement framing. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Feb 7, 2025 | 1267 28th Av 3-story horizontal addition at rear for new elevator shaft. remodel laundry area Complete | Addition | Complete | Within 1 month | |
| May 16, 2024 | 146 Elsie St Whole house remodel. backyard remodel w/ new deck 30" above grade. modifications to two bay windows exempt from 311 notification per municipal code section 136. addition at 2nd floor/ rear 2nd floor deck Approved | Addition | Approved | — | |
| Feb 9, 2024 | 64 Divisadero St #0 Reconstruction of legal non-conforming deck in disrepair as permitted by planning code sec 181.6.4 sructural alterations required to reinforce the struture to meet the standards for seismic loads and forces of the building code Filed | Deck, stairs or patio cover | Filed | — | |
| Jan 18, 2024 | 40 Loraine Ct One new window on front facade, wood frame window. new man door (fiberglass french door) at side of garage. Complete | Other | Complete | Within 1 month | |
| Dec 19, 2023 | 40 Loraine Ct G/f: convert 404sf of garage into living space to create a new mudroom, a bedroom, a bathroom and a study. 2/f: convert one full bath and one half bath into 2 full bathrooms. Complete | Home remodel | Complete | 1 month | |
| Nov 15, 2023 | 619 Baker St Remodel lower unnit (first flr) with new deck less than 30" above grade. Complete | Home remodelType unconfirmed | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Antje Paiz? Request a correction.