CheckMyDesigner

Audrey A Bauer

Architect · Studio Maven · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-36620First issued Aug 21, 2017, expires Apr 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
19 permits since 2010, 19 in the last 5 years. Latest filed Apr 21, 2026.
What kind of projects?
Home remodel 13 · ADU 2 · Other 2
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Home remodel: 13 permits in San Francisco

From 2010 to 2026, latest filed Jan 27, 2026.

Time to get a permit

Theirs
Within 1 month
City
Within 1 month

Median from filing to permit, from 10 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 15,455 permits.

Where

  • Castro/Upper Market3
  • Western Addition1
  • Haight Ashbury1
  • Outer Richmond1
Permits
22 permits that name Audrey A Bauer, newest first, including 3 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Apr 21, 2026827 Scott St #0

Remove (e) exterior door for (e) lower level storage space at rear facade and install (n) windoow winth the (e)opening. infill wall below to match (e) siding. (n) exterior inswing door within driveway along side facade. (n) closet within (e) lower storage space - no sqft change.

Complete
Jan 27, 2026827 Scott St #0

Kitchen and bathroom remodel in kind, no change to sq.ft. refinishing of (e) ground level storage area - new interior materials and new interior walls, new window within (e) opening of swing door, new in-swing door within draveway. no new sq.ft.

Withdrawn
Sep 17, 20251082 Ashbury St

Reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls.

Complete
Aug 26, 20252454 22nd Av

Interior remodel of existing kitchen & laundry room in place. conversion of powder room into full bathroom via the addition of 32 sq ft of interior inhabitable space within existing building envelope.nw deck & deck exterior stairs within rear yard set back. 369 sq ft total within rear yard setback

Complete
Aug 12, 2025726 33rd Av

Revision to pa # 2025-0613-8674. new sink and toilet in different location in new bathroom

Issued
Jul 1, 2025364 Moscow St

Rebuild exterior entry stairs to bring into compliance. new front facade windows, withing (e) window openings. new exterior swing door for garage level. no change to (e) garage door or (e) entry door. replace with (e) opening single winodw on south side facade.

Complete
Jun 13, 2025726 33rd Av

Remodel of existing full bath, conversion of powder room to full bath via absorbing e hall closet, addition of new hall closet within entry area. replacement of 1 window in kind,non street facing. electrical subpanel breaker rearranged to new interior wall. total 134 sq

Complete
May 8, 202420 Eagle St

Interior remodel of extg single family home with attached garage at 20 eagle street. no change to extg height. no square footage added, no change to extg curb cut. reconfiguration of interior stair & lvl 2 bedroom, nw powder rm on lvl1. nw inset entry door. nw electric garage door,

Complete
Aug 1, 2023706 10th Av

Replace i-kind 3 windows on front facade and (e) central atrium not included in pa 202207077943. aluminum-clad wood (n) windows, no change in size. max u-factor 0.30.

Complete
Mar 2, 20233660 22nd St

2nd flr bathroom remodel: alteration to one structural shearwall; 3rd flr bathroom remodel: in master bath and 2nd bath, remove one non-structural wall

Complete
Oct 26, 2022364 Moscow St

Recommencement and completion of work approved under pa# 201109074019. 50% of work remaining. new exterior deck with firewall on south edge. new raised floor at garage level. remove 2 non-compliant rear yard sheds. interior kitchen remodel, bath relocation, & wall reconfiguration at 2nd fl.

Complete
Oct 18, 202217 Chula Ln

Detached garage: convert to adu. 1 story vertical addition with one bedroom and bathroom.

Withdrawn
Oct 18, 202217 Chula Ln

Main house: renovation of (e) home with no change to (e) footprint or height.

Withdrawn
Jul 7, 2022706 10th Av

Interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope.

Complete
Oct 29, 2020127 Gambier St

Interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged.

Complete
Oct 29, 2020270 Hearst Av

Repair front steps, inkind. add bathroom in (e) closet. renovate (e) bathroom & kithcen in-kind. replace 5 rear windows, in-kind.repace (e) front double hung window in-kind. replace (e) front sliding window with new fixed windows flanked with double hung windows.

Filed
Sep 19, 2020728 Lyon St

3rd floor: enlarge doorway betweeen room & hallway, add opening between dining & living room. reconfigure three bathrooms. basement: add 3 doorways & partition walls.

Complete
Jul 23, 2019191 Sussex St

1 adu per ord. #95-17. new adu created @ new lower level.add kitchen,guest room,bathroom&bedroom@new level. add porch in rear@new lower level.interior renovation. garage gets smaller. no excavation. new permeable driveway per pc sec. 132.

Complete
Aug 21, 2018101 States St #5

Replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bath

Complete
Apr 9, 20182415 Mission St

Revision to app#201801299759 to include the partial t.i. at 2415 mission. scope includes removal & addition of non-load bearing partitions & finishes. no ext. work. exterior work under separate permit. no change to egress, occ, or common areas. all work within b. occ. no work in common areas.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Audrey A Bauer? Request a correction.