Beverly Ann Choe
Architect · Bach Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-29098First issued Sep 18, 2002, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 35 permits since 2004, 35 in the last 5 years. Latest filed Oct 7, 2026.
- What kind of projects?
- Addition 11 · Commercial or tenant improvement 7 · Home remodel 5
- How long do their permits take?
- ADU: 20 months. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 11 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966; 1 still in review.
Where
- Noe Valley6
- Mission1
- Potrero Hill1
- Glen Park1
Most recent
- 3786 20th StAddition of conditioned home office within unconditioned storage space at first floor, including new bathroom + modification to windows + doors. new steps to exit onto existing slab.Oct 7, 2026Filed
- 475 28th StBasement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft.Jul 15, 2021Expired
- 424 Texas StAddition of basement, 2nd, & 3rd levels with roof deck. addition includes garage, 4 bedrooms, kitchen, 3.5 baths, living/dining office, laundry room, & sun room. full seismic upgrade.Apr 16, 2021Withdrawn
- 50 Whitney StBasement & 1st floor addition. seismic upgrade @ garage level. add new exterior stair from basemnet to rear yard. kitchen remodel new windows. deck. closets @ 2nd floor. add power room.Sep 25, 2020Withdrawn
- 3524 Fulton StSeismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint.Oct 25, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 7, 2026 | 3786 20th St Addition of conditioned home office within unconditioned storage space at first floor, including new bathroom + modification to windows + doors. new steps to exit onto existing slab. Filed | Addition | Filed | — | |
| Oct 7, 2026 | 333 Baker St Ground floor: renovation of lobby & 3 offices and add 1 storage room, work to occur within existing footprint. all work on ground floor. Triage | Commercial or tenant improvementType unconfirmed | Triage | — | |
| Feb 28, 2023 | 424 A Texas St 1 new adu per ordinance #95-17 associated with new construction of single family home filed under bpa#202205134264 Issued | ADU | Issued | 20 months | |
| Oct 27, 2022 | 3784 20th St Add window @ rear, replace other windows in-kind, remove wall at living room, repair fire damage. replace (e) fireplace. to comply w/bid nov#20229203 dated 6/15/2022 Complete | Legalize or fix a violationType unconfirmed | Complete | Within 1 month | |
| May 13, 2022 | 424 Texas St Erect a 4-story with zero basement, type vb, single family home. Issued | New building | Issued | 26 months | |
| May 13, 2022 | 424 Texas St Demolition of existing 2-story, type vb, single family building. travels with 202205134265. Issued | Other | Issued | 26 months | |
| Jan 3, 2022 | 424 Texas StWithdrawn | ADU | Withdrawn | — | |
| Jul 15, 2021 | 475 28th St Basement addition, addition at kitchen/deck, add bay at rear facade at 2nd level, add 2 powder rooms, remodel 2 bathrooms and kitchen. new ground floor area is 1,198 sq. ft. Expired | Addition | Expired | 17 months | |
| Jun 14, 2021 | 50 Whitney St Add 1/2 bathroom and closet at 2nd fl. excavation of appromixatel 21 cu yds. voluntary foundation upgrade at rear crawl space. Complete | Home remodel | Complete | 5 months | |
| Apr 16, 2021 | 424 Texas St Addition of basement, 2nd, & 3rd levels with roof deck. addition includes garage, 4 bedrooms, kitchen, 3.5 baths, living/dining office, laundry room, & sun room. full seismic upgrade. Withdrawn | Addition | Withdrawn | — | |
| Nov 9, 2020 | 1315 Polk St 1/f: tenant improvement: relocate 2 offices to rear of building, upgrade lounge with new reception desk and ceiling. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Sep 25, 2020 | 50 Whitney St Basement & 1st floor addition. seismic upgrade @ garage level. add new exterior stair from basemnet to rear yard. kitchen remodel new windows. deck. closets @ 2nd floor. add power room. Withdrawn | Addition | Withdrawn | — | |
| Dec 19, 2019 | 147 04th Av (n) deck to replace (e) (but smaller footprint). (n) fire wall Withdrawn | Deck, stairs or patio cover | Withdrawn | — | |
| Oct 25, 2019 | 3524 Fulton St Seismic upgrade @ basement. basement addition to extent deck, includes bed, multipurpose and new bath. add new internal stair to basement. kitchen remodel & new windows. deck & exterior stairs within existing footprint. Complete | AdditionType unconfirmed | Complete | 13 months | |
| Apr 29, 2019 | 4228 Geary Bl Install new fire sprinkler system in e building no e sprinklers present Complete | Other | Complete | Within 1 month | |
| Apr 3, 2019 | 40 Pond St Replace (e) roof shingles. replace all windows at front facade with double hung + 1 window @ rear,replace 1 window with 3 panel accordian door at kitchne add rear landing steps, repalce (e) guard rail & fence at front Issued | Other | Issued | Within 1 month | |
| Jan 23, 2019 | 4228 Geary Bl Change of use of extg retail space into preschool facility with 6 classrooms, reception, warming kitchen, 2 toilet rooms, office and storage. seismic upgrade under seperate permit #201901099918. fire alarm & sprinkler under seperate permit. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Dec 14, 2018 | 4228 Geary Bl Demo of interior walls, suspended ceiling, flooring light fixtures, plumb fixtures, strip inside of exterior walls to base framing Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 24, 2018 | 111 Holly Park Cr Legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair. Complete | Legalize or fix a violation | Complete | 9 months | |
| Jun 9, 2017 | 487 29th St Excavate and replace basement & foundation to add recreation, storage space, kitchenette and internal stair; renovate kitchen, add 2 bathrooms, 1 powder room, and 2 skylights. enlarge/replace windows at rear facade. replace built up roofing, sprinkler basement and 1st floors per pre app meeting note Complete | AdditionType unconfirmed | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Beverly Ann Choe? Request a correction.