Blake Dilsworth
Engineer · Kpff Consulting Engineers · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-3929First issued Feb 10, 1995, expires Jun 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 19 permits since 2005, 19 in the last 5 years. Latest filed Sep 20, 2024.
- What kind of projects?
- Commercial or tenant improvement 11 · Other 4 · Home remodel 3
- How long do their permits take?
- Commercial or tenant improvement: 3 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 11 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Financial District/South Beach10
- Tenderloin1
Most recent
- 48 Stockton St4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittalsNov 4, 2022Complete
- 360 Spear St3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales.Jan 24, 2022Complete
- 33 New Montgomery StReplacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinanceOct 30, 2017Complete
- 345 Spear St5th flr: partial floor t.i. including minor demolition,new partitions,finishes & associated mep, fire ls under separate permit; maher n/aDec 28, 2015Complete
- 4 Embarcadero CenterRenovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13Oct 7, 2015Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 20, 2024 | 580 Beach St Building 1 and 2 (west) building. selective store front replacment , art displays, lighting, cosmetic repairs, railing repairs and upgrade. sharing plans with 500 beach st Complete | Other | Complete | 3 months | |
| Sep 20, 2024 | 500 Beach St Garage (east) building. selective store front replacment , art displays, lighting, cosmetic repairs. sharing plans with 580 beach st Complete | OtherType unconfirmed | Complete | 3 months | |
| Nov 7, 2022 | 2270 Mckinnon Av To erect a 5-story, type iiib & ia building. occupancy class b, s-1, f-1, s-2. Issued | New building | Issued | 22 months | |
| Nov 4, 2022 | 48 Stockton St 4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittals Complete | Commercial or tenant improvement | Complete | 1 month | |
| Aug 17, 2022 | 1012 Scott St (n) bathroom @ l1, (e) remodel of bedroom and l1 and (n) partial stair extention interior. Complete | Home remodel | Complete | 5 months | |
| Jan 24, 2022 | 360 Spear St 3rd fl: single floor tenant improvement. existing structure, egress staor enclosures to remain. non structural partitions, ceiling, wall and floor finishes only. related mechanical, electrical, plumbing workm change of use from office/internet service exchange to office /laboratory/wholesale sales. Complete | Commercial or tenant improvement | Complete | 4 months | |
| Apr 8, 2021 | 120 Stockton St Addition of a scissor lift in the loading dock and (2) hour rated glazing on the north facade, level 6 & 7. revision to pa#201805048215 & #202008101490(arch) / #202008131716(str). Issued | Revision or supplement | Issued | 9 months | |
| Aug 13, 2020 | 120 Stockton St Revisions to bpa# 201805048215 addenda 2 structural - superstructure include the following: 1) new passenger elevator servicing levels 1-5. 2) mep shaft updates at the northwest mechanical room. 3) revised dead and live loading at levels 2-5. Issued | Revision or supplement | Issued | 6 months | |
| Oct 30, 2017 | 33 New Montgomery St Replacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinance Complete | Commercial or tenant improvement | Complete | 51 months | |
| Aug 12, 2016 | 2578 Mission St To comply with nov 201625012. revision to app#201607142408 Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 28, 2015 | 345 Spear St 5th flr: partial floor t.i. including minor demolition,new partitions,finishes & associated mep, fire ls under separate permit; maher n/a Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 21, 2015 | 1 Market St 7th floor: structural work associated with arch permit #201511031519. work includes nelson stud welding. also new floating slab for acoustic purpose only (not structural). n/a for maher. Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Oct 7, 2015 | 4 Embarcadero Center Renovate and extend existing egress access stair between the 17/f & 18/f down to 16/f, removal of two (2) existing egress access stairs, all of which are not part of the required egress system. n/a ordinance #155-13 Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 24, 2015 | 33 New Montgomery St Remodel of extg bank space including new private offices, new accessible toilet room, walls, lighting millwork finishes and furniture. no change to use or occupancy. work to include mechanical, electrical, and plumbing. fire sprinkler and alarm work to be under separate permit. n/a for maher. Issued | Commercial or tenant improvement | Issued | 5 months | |
| Jun 24, 2015 | 625 Market St Remodel of (e) bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate- Issued | Commercial or tenant improvement | Issued | 5 months | |
| Jun 1, 2015 | 760 Market St Structural underground steel beams to support fuel tank. bldg permit # 201412123630. minor sidewalk encroachment permit 15mse-0068. n/a for the maher. Expired | Home remodel | Expired | Within 1 month | |
| Apr 23, 2015 | 945 Market St Revision to pa#201011084497 s2 to modify super structure design due to infield conditions. design evalution changes include modification to brace line, slabs for fuel tanks and mechanical equipment, elevator & escalator openings. n/a ordinance #155-13 Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 17, 2014 | 222 Mason St Level b1, b2 & b3- install (3) 5o-hp steam boilers to replace district steam source on level b2 within the existing valet parking garage and provide (4) parking lifts near new boiler enclosure. fire alarm, fire sprinkler, flue vent detail will be deferred submittal. Cancelled | Other | Cancelled | Within 1 month | |
| Feb 12, 2014 | 50 03rd St Convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 13, 2012 | 33 Powell St Scope of work includes non-bearing interior partition walls, (n) floor finishes, (n) paint, (n) casework & furniture, electrical work, mechanical work & plumbing work.sprinkler and fire alarm permit on seperate permits. n/a ordinance #155-13 Complete | Commercial or tenant improvement | Complete | 26 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.