Bruce Christian Prescott
Architect · Santos Prescott & Assoc. · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23687First issued Sep 17, 1992, expires May 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 31 permits since 2005, 31 in the last 5 years. Latest filed Nov 26, 2025.
- What kind of projects?
- Other 8 · Home remodel 6 · New building 5
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Other: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966; 1 still in review.
Where
- Financial District/South Beach4
- South of Market3
- Sunset/Parkside1
Most recent
- 600 07th StChange locksets on horizontal exit doors level 2-7 to be electronically locked and release in the event of power outage or on command from the fire alarm control center.Nov 26, 2025Approved
- 600 07th StAdd fire damper to duct ag gr fl. change door to 90 min rated and wall to 2 hour at roof levelJan 12, 2024Complete
- 600 07th StElevator smoke detector access panel, ref bpa#20210196871-s8Nov 10, 2023Complete
- 1558 23rd AvAdd entryway to basement. widen door at street facade to access entryway.Jan 16, 2020Complete
- 255 Fremont StInstall 1 non-electric "natalie gubb commons" signSep 5, 2018Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 26, 2025 | 600 07th St Change locksets on horizontal exit doors level 2-7 to be electronically locked and release in the event of power outage or on command from the fire alarm control center. Approved | Other | Approved | — | |
| Jul 14, 2025 | 150 04th Ti St Priority 100% affortable project - erect a 5-story, no basement, type ii-a, 100 units of affordable senior housing with associated community and management spaces. (r-2,s-2,b) Issued | New building | Issued | 6 months | |
| Jun 9, 2025 | 5116 03rd St Documentation to abate nov 201994041 - by legalizing the renoation of rear yard cottage using (e) foundation to add home office as part of front residential unit. (reconstruct unpermitted demolition of (e) rear cottage) Issued | Legalize or fix a violation | Issued | 11 months | |
| Nov 6, 2024 | 3262 25th St Upgrade foundations. selective demo of rear rear additions and interior partitions. partition a portion of garage to create vestibule and add new stair to upper level. new rear windows at rear elevations. fill in existing property line windows wih rated construction. reframe rear area of house. Issued | AdditionType unconfirmed | Issued | 6 months | |
| Oct 29, 2024 | 240 Van Ness Av Rev 202101042034- revise 1st floor cmu wall and add 3 hr concrete ceiling. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 6, 2024 | 240 Van Ness Av Adding drinking fountain in courtyard Complete | Retaining wall or site workType unconfirmed | Complete | 1 month | |
| Feb 8, 2024 | 580 Banks St Ref pa 202212279156 application for shoring permit for south wall for replacement of south foundation and retaining wall. Expired | Seismic retrofit or foundationType unconfirmed | Expired | Within 1 month | |
| Jan 12, 2024 | 600 07th St Add fire damper to duct ag gr fl. change door to 90 min rated and wall to 2 hour at roof level Complete | Other | Complete | 7 months | |
| Nov 10, 2023 | 600 07th St Elevator smoke detector access panel, ref bpa#20210196871-s8 Complete | Other | Complete | Within 1 month | |
| Aug 10, 2023 | 3801 Balboa St 2/f-3/f: remodel restrooms Issued | Commercial or tenant improvement | Issued | 2 months | |
| Dec 27, 2022 | 580 Banks St Demo & relocate interior partitions.replace all siding & wdws.raised partial area of roof to add clerestory.add powder rm, relocate (e) bathrms & replace all fixtures.replace kitchen fixtures,int stair & floor finish,ext backyard stair & fence, add on grade wood deck.replace a portion of retaining Complete | AdditionType unconfirmed | Complete | 13 months | |
| Oct 27, 2022 | 1051 South Van Ness Av #0 Replace existing kitchen and laundry room fixtures and finishes. remove walls to enlarge space new beam to carry load of (e) bearing wall. add new partition to define closet. replace four windows with new clad wood frame windows. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Oct 24, 2022 | 75 Laguna St 1/f & 2/f: subdivide 1 large office into 3 offices, replace lighting in meeting room, add automatic door opener to (4) restroom doors. fire alarm/sprinklers under sep permits. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 21, 2022 | 954 Florida St Remove existing brick chimneys. kitchen remodel; replace window and door, divide existing bathroom into two and move bedroom closet. Issued | Home remodel | Issued | Within 1 month | |
| Oct 25, 2021 | 1053 South Van Ness Av #0 Replace entry door, change one door to window add two windows and a skylight remove non -structural wall and frame new ceiling construct new bathroom wall relocate bathroom fixtures, new shower new mini-split hvac; new tankless hot water heater Complete | Home remodel | Complete | Within 1 month | |
| Apr 6, 2021 | 164 Hartford St Kitchen renovation. remove non structural wall. replace fixtures and finishes. Complete | Home remodel | Complete | 2 months | |
| Jan 4, 2021 | 240 Van Ness Av To erect a type 1-b, 8-story, 112 units, mixed-use building with ground flr office/commercial space and no basement level. 100% affordable housing. Complete | New building | Complete | 13 months | |
| Oct 19, 2020 | 600 07th St To erect a 8-story, type 1b, mixed use bldg with 221 residential unit, no basement. **comply to maher, route to dph** Complete | New building | Complete | 13 months | |
| Jan 16, 2020 | 1558 23rd Av Add entryway to basement. widen door at street facade to access entryway. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Nov 22, 2019 | 75 Laguna St Change of occupancy load calculation only. reference permit application #201908148714. **maher n/a** Approved | Revision or supplement | Approved | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Bruce Christian Prescott? Request a correction.