Carl Milsum

Engineer · Airolite · Oakland

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-6190First issued Dec 17, 2014, expires Sep 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
34 permits since 2005, 34 in the last 5 years. Latest filed Jun 29, 2026.
What kind of projects?
Other 13 · New building 4 · Retaining wall or site work 4
How long do their permits take?
New building: 4 months. City typical for the same review: 12 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
55 permits that name Carl Milsum, newest first, including 21 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 26, 2026840 Battery St

Deferred submittal of mech roof access catwalk shop drawings. (ref bpa: 202607144985)

Filed
Jun 29, 2026750 Phelps St

Proj-26-0640. sep 940. renovation of (e) office space in two-story public works maintenance bldg. modify & relocate (e) sprinklers for new walls & ceiling layout for 4,367sf office space on lvl 1 & 5,585sf office space on lvl 2. remove sprinklers at top & bottom of (e) freight elevator installation.

Filed
Jun 24, 20263200 California St

Replace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads.

Issued
Oct 7, 202515 Dakota St

Relocation of existing garden gazebo from 32 watchman wy to 15 dakota st. construct four new foundation footing to support existing gazebo.

Complete
Jul 1, 2025101 02nd St

Replace (e) trane 10-ton cooling only package unit with new trane 10-tom. package unit and reconnect to existing ductwork and electrical. no work in the interior of the building

Complete
Mar 5, 20252230 Jerrold Av

Construction of an emergency generator to support the meals on wheels, sf production and support center. site work includes structural slab, electrical conduits to and from the building and an emergency generator. the emergency generator will be enclosed by a pre-fabricated enclosure.

Complete
Apr 18, 2024560 Mission St

16th floor: structural detail for installation of operable partition at welcome zone/flex zone. ref pa#202309186839

Issued
Apr 1, 20241212 Maryland St

Priority per ab-004. tower crane erection for contruction of project,tower crane dismantle

Complete
Jan 18, 2024651 Brannan St

Electrical work, replacement of roof-mounted generator, replacement of ats and addition of mts in 3/f electrical room, and addtiion of portable genrator connection cabinet in basement.

Issued
Oct 25, 2023420 Montgomery St

Stair replacement @ 2nd fl roof and machine room roof

Complete
Oct 24, 20231501 Tennessee St

Deferred shop drawings for ada lift platform framing, handrails & guardrails for bpa# 2022-1116-6660.

Complete
Oct 6, 2023360 03rd St

Replace (2) 80 ton air-cooled chillers on roof along with three chillers water pumps. no work in the interior of the building.

Complete
Aug 21, 2023375 Laguna Honda Bl

Install temporary shoring system in order to saw cut (e) slabs for structural retrofit per note n.4 on s0.3.. ref pa# 202109228981.

Complete
Jun 15, 2023900 Innes Av

Priority process-shoring sytem to construction foundations to the maintenane bldg at the park project. new construction bpa#202103247214

Complete
Jun 13, 2023101 California St

Replacement of (e) stair with new stair @ level ll1 to level 1 . deferred submittal for bpa 2020-0619-8935

Cancelled
Jun 13, 2023101 California St

Cold formed framing submittal package 2 deferred submittal for pa 2020-0619-8935

Cancelled
May 3, 2023580 Ortega St

Revision to permit 201412304701. concrete compression calculation to 2500psi. no moment frame in construction. revised special inspection and structural observation document.

Complete
Dec 7, 20229 Bernice St

Relocation of existing rooftop ac unit to proper & safe location.

Complete
Nov 1, 2022433 Natoma St

Project consists of adding a voluntary partial seismic upgrade of existing unreinforced masonry wall

Complete
Nov 1, 2022101 California St

Metal stairs deferred submittal for 202106283370

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Carl Milsum? Request a correction.