Christian J Dauer
Architect · Chr Dauer Architect · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-28302First issued Sep 7, 2000, expires Feb 28, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 69 permits since 2005, 69 in the last 5 years. Latest filed Jul 15, 2026.
- What kind of projects?
- Home remodel 36 · Addition 9 · Commercial or tenant improvement 6
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 36 permits in San Francisco
Time to get a permit
Median from filing to permit, from 35 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 23,779 permits.
Where
- Castro/Upper Market5
- West of Twin Peaks4
- Bernal Heights4
- Glen Park4
Most recent
- 3632 18th StInterior remodel at 1st floor storage. new install of bathroom fixtures and finishes. new install of 2nd kitchen fixtures and appliances 2 burner cooktop, no oven). and cabinetry.May 12, 2026Issued
- 145 Ulloa StInterior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath,Jan 9, 2026Issued
- 514 Vallejo St2/f: interior remodel of (e) kitchen, dining room, and bath. add w.c. total of new plumbing fixtures - 2 (wc sink, kitchen dishwasher)May 20, 2025Complete
- 205 Ellsworth StInterior remodel of e bathroom. replace tub w shower and new finish bath floor, new bath fan, replacement of e alum slider front bath window with new fiberglass awningFeb 3, 2025Cancelled
- 68 Whitney StInterior remodel: new 1st floor family room and laundry, new window and door leaf at 1st floor front elevation. 2 new windows at lightwells not visble from the public way.Feb 3, 2025Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 15, 2026 | 535 Florida St Ti improvement of (e) food service facility. new partitions, new millwork, new equipment, new bar. no change of use. no structural work. Issued | Commercial or tenant improvement | Issued | 2 months | |
| May 12, 2026 | 3632 18th St Interior remodel at 1st floor storage. new install of bathroom fixtures and finishes. new install of 2nd kitchen fixtures and appliances 2 burner cooktop, no oven). and cabinetry. Issued | Home remodel | Issued | 2 months | |
| Apr 20, 2026 | 136 Evelyn Wy Exterior remodel: remove/replace stucco siding @ w+s facades. remove select windows & doors from e,w,+s facades. replace w/ new fiber glass clad wood windows + doors. new rear patio + steps. no work @ n (front) facade. interior remodel: 1st floor: remodel/excavate for new 8'-0" ceiling height/replac Issued | OtherType unconfirmed | Issued | Within 1 month | |
| Jan 9, 2026 | 145 Ulloa St Interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath, Issued | Home remodel | Issued | Within 1 month | |
| May 21, 2025 | 55 Ulloa St New wood fence at rear yard and partial side yard (80 lineal feet) not visible from public right of way Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| May 20, 2025 | 514 Vallejo St 2/f: interior remodel of (e) kitchen, dining room, and bath. add w.c. total of new plumbing fixtures - 2 (wc sink, kitchen dishwasher) Complete | Home remodel | Complete | Within 1 month | |
| Feb 3, 2025 | 205 Ellsworth St Interior remodel of e bathroom. replace tub w shower and new finish bath floor, new bath fan, replacement of e alum slider front bath window with new fiberglass awning Cancelled | Home remodel | Cancelled | Within 1 month | |
| Feb 3, 2025 | 68 Whitney St Interior remodel: new 1st floor family room and laundry, new window and door leaf at 1st floor front elevation. 2 new windows at lightwells not visble from the public way. Complete | Home remodel | Complete | Within 1 month | |
| Jan 28, 2025 | 310 Sanchez St Interior remodel of primary bathroom, conversion of bath tub to shower. replacement of (2) exterior rear doors, repair of dryrot at rear siding and entry stair landing (within property line) Complete | Home remodel | Complete | Within 1 month | |
| Nov 19, 2024 | 618 12th Av 1st fl: (n) concrete grade beams shear walls, partitions & selective structural hardware at unconditioned garage & storage. (n) garage door & rear man doors/landings. 2nd fl: remodel of (e) kitchen, dining, family & wc (n) rear doors & windows. 3rd fl: remodel (e) 2 bathrooms, bedrooms & closet. Complete | Home remodel | Complete | 2 months | |
| Nov 18, 2024 | 1555 Yosemite Av #4 Unit #4: new office and open office partitions and work surfaces. selected bathroom new floor and wall finishes, 2 new doors. upgrade of primary entrance door hardware and interior landing/threshold. replace (e) plumbing fixtures to meet curret code. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Aug 9, 2024 | 55 Ulloa St Interior remodel: 1st flr remove existing concrete slab & interior walls. new concrete slab, remodel existing bathrooms, 2 bdrms,family room, hall. replace interior stair, new side + rear window/door (not visible from puplic way) 2nd fl: remodel kitchen, reframe openings to living & dining rooms, Complete | Home remodel | Complete | 2 months | |
| Jul 23, 2024 | 25 Whitney St Structural revision to pa# 202312293293. revision include: additional excavation at rear portion of existing structural adjacent to addition. replacement of existing east and eastern portion of south brick foundations. new and revised strutural fopunation layout at rear portion of existing structure Complete | Revision or supplement | Complete | 1 month | |
| Mar 27, 2024 | 272 Anderson St Basement concrete slab removed and excavation at n conditioned spaces & e crawl, struc framing and foundation improvements,n laundry/bath, hall, family rm, stair to 1st fl 1 hr fire sep btwn garage/hab spaces.1st fl replace 1 dbl hung front sash, replace 3 rear windows at vedroom/bath. mep new gas Complete | Home remodelType unconfirmed | Complete | 3 months | |
| Dec 29, 2023 | 25 Whitney St New 1-story rear yard addition w/ roof deck and exterior stair, replace existing interior communication stair between 1st and 2nd floors, new full bathroom @ 1st floor, relocation of laundry @ 1st floor, new fire separation between garage & 1st and 2nd floor living spaces, new roof top pv solar Complete | Addition | Complete | 6 months | |
| Nov 3, 2023 | 549 19th Av Interior kitchen remodel: new fixtures and finishes, interior bathroom remodel new fixtures and finishes, interior hall bath remodel, expansion, new fixtures and finishes, removal of entry foyer coat closet, in-kind replacement ligtwell window Complete | Home remodel | Complete | Within 1 month | |
| Apr 27, 2023 | 3202 Folsom St To comply w/abe program per ord 51-16. abe#202001150941. remove (e) threshold & replace w/(n) threshold @ existing entry door;install 10" smooth surface kickplate @ push-side of(e) entry door; document work related to unreasonable hardship & technical infeasibililty.install push button actuator Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 27, 2022 | 1518 07th Av Horizontal rear addition on 2/f & 3/f. new windows and doors at addition. new half-bath/laundy and kitchen expansion on 2/f. new primarty suite at 3/f with new skylight at (e) roof. add new adu on 1st floor. Issued | ADU | Issued | 30 months | |
| Dec 5, 2022 | 527 Euclid Av 1st flr- interior remodel of (e) living rm,fireplace w/ (n) gas inset installation. (n) windows @ east living rm wall.repair (e) front windows. no change to size. 2nd flr-interior remodel of bathrm & bedrm w/ (n) fixture & finishes, 2 new replacement windows at west & south walls. Complete | Home remodel | Complete | 21 months | |
| Jun 17, 2022 | 77 Norwich St Lot subdivision: application in association with sfdpw pid 10794 & sf planning dept variance referral approved dated 1/22/21 and sfdbi referral conditional approved dated 1/30/21. installation of 1-hr fire rated assemblies at 77 norwich st rear wall per sfdbi conditional approval. Complete | Revision or supplementType unconfirmed | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Christian J Dauer? Request a correction.