CheckMyDesigner

Christopher James Wood

Engineer · Luke And Associated · Hercules

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-72184First issued Jan 25, 2008, expires Jun 30, 2028.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
5 permits since 2021, 5 in the last 5 years. Latest filed Apr 9, 2025.
What kind of projects?
Commercial or tenant improvement 2 · Home remodel 1 · Seismic retrofit or foundation 1
How long do their permits take?
Commercial or tenant improvement: 9 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
7 permits that name Christopher James Wood, newest first, including 2 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Apr 9, 20251011 Garfield St

Prop h: project involves a renovation of the children's play area and access/egress to the playground from the exterior sidewalk.this includes the removal of the(e)ramp,including handrails & landings,& a portion of the(e)fence adjacent to the ramp.new accessible walkway from the sidewalk entrance

Complete
Apr 9, 20254080 Mission St

Prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5.

Issued
Jan 21, 20251060 Key Av

Voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building.

Issued
Mar 1, 2023135 Mississippi St #0

Revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lot

Complete
Oct 13, 20214101 Noriega St

Full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordable

Complete
Mar 23, 2021200 Randolph St

Priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping...

Complete
Sep 29, 20172569 Sutter St

Revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/a

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Christopher James Wood? Request a correction.