Daniel M Levine
Architect · The John Stewart Company · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-10154First issued Sep 1, 1979, expires Nov 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 32 permits since 2000, 32 in the last 5 years. Latest filed Sep 18, 2026.
- What kind of projects?
- Home remodel 16 · Commercial or tenant improvement 5 · Other 5
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 16 permits in San Francisco
Time to get a permit
Median from filing to permit, from 16 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,178 permits.
Where
- Bayview Hunters Point7
- Bernal Heights2
- South of Market1
- Tenderloin1
Most recent
- 150 09th StExterior siding repairs at washburn street elevation: interior wood framing repairs for existing walls and joists from gound fl. to roof(unit stack x 20, x21, x22) and interior finishes repairs. all other gray out scope of work on plans under seperate approved permit application #202305026865.Jan 24, 2025Issued
- 3101 Mission StSelective replacement of unit interior items per unit interior replacement schedule. various accessibility upgrades at units and site. bldg mechanical system upgrade, paint all previously painted exterior surfaces, remove and replace membrane roofing atSep 10, 2019Complete
- 820 Ofarrell StSelected replacement of unit interior items and finishes per unit interior replacement schedule; paint all previously painted exterior surfaces; new sumppit, reinstall extg sump pump after installation of new sump pit; installation of nw conc. slab at extg community room;Jan 11, 2019Issued
- 1000 Tompkins AvSelected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard;Dec 10, 2018Complete
- 1353 07th Av #0Units 201-210, units 303-301. units 402-410: replace, in kind-kitchen cabinets, fixtures, finishes of 30 units and common areas. additional work includes replacement of (e) roof, shingle siding @ rear of bldg & penthouse, garage door and motor and elastometric surface at deck. n/a for maher.Apr 17, 2015Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 18, 2026 | 1388 Sutter St 11th floor. modify existing open space and create 8 individual office. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 4, 2026 | 151 Joice St Replacement of all windows and sliding glass doors at residential floors 1 through 3. (building d) Filed | Other | Filed | — | |
| Aug 19, 2026 | 945 Sacramento St Replacement of all window and sliding glass doors at residential floors: building t- floors 2 through 12, buildings a & b - floors 1 through 4, building c & d: floors 1 through 3 Filed | Other | Filed | — | |
| May 29, 2026 | 150 09th St Revision to pa #202305026865-s2. revision to miscellaneous in field changed items to previous approved addendum 2 mechanical, electrical and plumbing drawings. Issued | Revision or supplement | Issued | 2 months | |
| Dec 24, 2025 | 150 09th St Revision to pa #202305026865 s2 to address 7/10/2025 correction notice: clarification to 3/25/24 ab-005 as updated 12/22/25 re: ceiling finishes at basement Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 24, 2025 | 150 09th St Exterior siding repairs at washburn street elevation: interior wood framing repairs for existing walls and joists from gound fl. to roof(unit stack x 20, x21, x22) and interior finishes repairs. all other gray out scope of work on plans under seperate approved permit application #202305026865. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| May 2, 2023 | 150 09th St Mayor dir 13-01. 100% affordable housing. comprehensive alterations, upgrades, & repairs to (e) el dorado res. hotel/(e) sro 4-story 57 units to increase to 62 residential public housing sleeping units. Issued | Commercial or tenant improvementType unconfirmed | Issued | 11 months | |
| Sep 16, 2022 | 1240 Fillmore St Revision to original permit #201912270828 approved pm 06/16/2021. new mail and package room w/ new usps mailboxes, new interior storefront system at manager and service offices; add kitchenette at (e) conference rm 2; management office re-organization. Complete | Revision or supplement | Complete | 2 months | |
| Apr 1, 2022 | 1388 Sutter St Renovation at 10th & 11th fl office. (n) demising wall & conference room at 10th fl. design build any elec & mechanical elements for (n) private offices + conf room.(n) waterline at relocated pantry cab. 11th fl: (n) conference room. design build any elec, mech. fire sprinkler work on seperate perm Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Dec 27, 2019 | 1240 Fillmore St Conversion of(8) ada units, selective seismic strengthening, replacement of exterior windows, selected roof replacement,(n)residence activity space @ (e) bldg envelope, finishes upgrade @ lobby, office, common community spaces & restrom upgrades, fire sprinkler upgrade, generator replacement. Complete | Seismic retrofit or foundation | Complete | 18 months | |
| Sep 10, 2019 | 3101 Mission St Selective replacement of unit interior items per unit interior replacement schedule. various accessibility upgrades at units and site. bldg mechanical system upgrade, paint all previously painted exterior surfaces, remove and replace membrane roofing at Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Jun 28, 2019 | 1031 Franklin St No work performed on existing structure. drawings for sffd occupancy load only. Cancelled | Other | Cancelled | — | |
| May 29, 2019 | 1000 Tompkins Av Revision to 2018-1210-7904 (original pa) & 2019-0213-2834 (revision to pa 2018-1210-7904) - structural construction system for the new community room, kitchen and accessible restrooms Complete | Revision or supplement | Complete | 6 months | |
| Jan 11, 2019 | 820 Ofarrell St Selected replacement of unit interior items and finishes per unit interior replacement schedule; paint all previously painted exterior surfaces; new sumppit, reinstall extg sump pump after installation of new sump pit; installation of nw conc. slab at extg community room; Issued | Home remodel | Issued | 11 months | |
| Dec 10, 2018 | 1000 Tompkins Av Selected replacement of unit interior items & finishes per unit interior replacement schedule; paint ext surfaces; replacement of e w/h: see units; renovate of e leasing office & laundry; new community rm, kitchen, & accessible restrms; new landscape & play structure & ground finishes @ e courtyard; Complete | Home remodel | Complete | 1 month | |
| Aug 8, 2018 | 52 Middle Point Rd Install new wire mesh fence with gate. replce (e) double metal door for a 1/2 safe glass and louvers. install a new window 5'0 6'0 alumn not visible from street Complete | Other | Complete | Within 1 month | |
| Aug 8, 2018 | 61 West Point Rd Install new wire mesh fence with gate. replce (e) double metal door for a 1/2 safe glass Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Aug 1, 2018 | 1615 Sutter St Remove extg plumbing fixtures, lighting and other bath accessories. remove portion of wall by bath entrance for larger door opening. new accessible toilet, lav, lighting, accessories, gfci outlet and electrical in both bath. Complete | Commercial or tenant improvement | Complete | 9 months | |
| Apr 17, 2015 | 1353 07th Av #0 Units 201-210, units 303-301. units 402-410: replace, in kind-kitchen cabinets, fixtures, finishes of 30 units and common areas. additional work includes replacement of (e) roof, shingle siding @ rear of bldg & penthouse, garage door and motor and elastometric surface at deck. n/a for maher. Complete | Home remodel | Complete | 2 months | |
| Jan 31, 2008 | 118 Diamond St #0 Misc repairs including minor bathroom remodel, installing pneumatic trash opener at each floor, 1 carbinet and counter top replacement and restriping at garage. waterproofing of 7 decks on the 2nd floor. wood deck repairs. Complete | Deck, stairs or patio cover | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Daniel M Levine? Request a correction.