David Scott Locicero
Architect · David Locicero · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-19452First issued Aug 31, 1988, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 42 permits since 2004, 42 in the last 5 years. Latest filed Aug 12, 2026.
- What kind of projects?
- Legalize or fix a violation 21 · Home remodel 10 · ADU 5
- How long do their permits take?
- Legalize or fix a violation: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Legalize or fix a violation: 21 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 14,919 permits.
Where
- Mission6
- Bernal Heights5
- Sunset/Parkside4
- Oceanview/Merced/Ingleside2
Most recent
- 1263 33rd AvBring udu into compliance nov202545325: build rated wall between garage and hall from front door to udu; building btw hall and furnace and water heater; verify (e) insulation; upgrade floor/ceiling assembly to 1hr fire rating. upgrade back walll seismically to account for new sliding glass door.Aug 12, 2026Filed
- 2398 30th AvRespond to 2021-010578enf,nov #202297875, & 202299369: 1/f legalize udu by density program. 2/f to allow required access to the roof. 2/f taraval bld to legalize udu under local program, merge 2 udu 1 udu is too small. taraval commerical bldg built 1980s w/ permits, convert to residential.Feb 9, 2026Filed
- 2722 Folsom StUnder ord 291-24,the admin permit documents ss3.f.3(d) of settlement agreement in case 21-cv-07724: the city issues a cua pursuant to the sf planning code ss 303 & 317 for the rmeoval of the alleged unauthorized unit on the g/f o the main structure through a merget of wth the other unit on the g/fJan 6, 2025Cancelled
- 1350 41st AvTo abate nov 202418138 to legalize construction w/out permit by previous owner. ref permits 201703201821 and 201801047814Jun 18, 2024Complete
- 326 Alemany BlTo legalize 3 dwelling units built without a permit. to comply with nov 2022-98778. ref pa200210280031.Jun 23, 2023Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 12, 2026 | 1263 33rd Av Bring udu into compliance nov202545325: build rated wall between garage and hall from front door to udu; building btw hall and furnace and water heater; verify (e) insulation; upgrade floor/ceiling assembly to 1hr fire rating. upgrade back walll seismically to account for new sliding glass door. Filed | Legalize or fix a violation | Filed | — | |
| Jul 16, 2026 | 3042 Pierce St #0 Front building:build new residential unit 3048 (not adu) in existing ground level storage room in the front building of 3042-3046 pierce street.work is within the buildings existing footprint.work will include new walls,new windows, new doors to build a new two unit one bathroom unit. Filed | AdditionType unconfirmed | Filed | — | |
| Feb 24, 2026 | 2722 Folsom St #0 Removal of alleged unauthorized unit on ground flr of main structure through merger. see art 2.16 agreement under ord 291-24; under planning code secs 303 & 317 only. state adu pc207.2 not in scope and will be seprated permit applied for after udu removal permit is issued. admin permit only for docu Triage | Commercial or tenant improvementType unconfirmed | Triage | — | |
| Feb 9, 2026 | 2398 30th Av Respond to 2021-010578enf,nov #202297875, & 202299369: 1/f legalize udu by density program. 2/f to allow required access to the roof. 2/f taraval bld to legalize udu under local program, merge 2 udu 1 udu is too small. taraval commerical bldg built 1980s w/ permits, convert to residential. Filed | Legalize or fix a violation | Filed | — | |
| Jan 6, 2025 | 2722 Folsom St Per ord #291-24:admin pa to doc ss4.4 of settlement in case 21-cv-07724:w/in 15 days of the effective date,owners will revise bpa201807063908 to include update plans that accurately document the work that has occured in the area subjet to bpa 201807063908 to date and proposed work,including Cancelled | Revision or supplement | Cancelled | — | |
| Jan 6, 2025 | 2722 Folsom St Under ord 291-24,the admin permit documents ss3.f.3(d) of settlement agreement in case 21-cv-07724: the city issues a cua pursuant to the sf planning code ss 303 & 317 for the rmeoval of the alleged unauthorized unit on the g/f o the main structure through a merget of wth the other unit on the g/f Cancelled | Legalize or fix a violationType unconfirmed | Cancelled | — | |
| Aug 1, 2024 | 242 Broad St Lower front: to abate 2019-006608- g/f unit, relocate 1-hr rated wall between units, relocate bathroom and kitchen, enlarge windows, replace garage door with windows and an entry door. all associated plumbing and electrical. replace hvac and water heater with new Filed | ADU | Filed | — | |
| Jun 18, 2024 | 1350 41st Av To abate nov 202418138 to legalize construction w/out permit by previous owner. ref permits 201703201821 and 201801047814 Complete | Legalize or fix a violation | Complete | 1 month | |
| Jun 10, 2024 | 242 A Broad St Cottage: to abate 2019-006608- remodel existing non-conforming legal single family cotttage to update the plan and services. gut the unit, relocate bathroom and kitchen, replace windows, relocate entry door. add laudry hookups. new hvac and water heater. all associated plumbing and electrical...... Filed | Home remodelType unconfirmed | Filed | — | |
| Jun 10, 2024 | 242 Broad St Lower back: to abate 2019-006608- gut (e)g/f unit, relocate 1-hr rated wall between units, relocate bathroom and kitchen, enlarge windows and replace entry door. all associated plumbing and electrical. rebuild rear deck.replace hvac & water heater w/ new. add fire sprinklers to unit. unit to get new Filed | ADU | Filed | — | |
| Jun 23, 2023 | 326 Alemany Bl To legalize 3 dwelling units built without a permit. to comply with nov 2022-98778. ref pa200210280031. Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Jun 23, 2023 | 316 Alemany Bl To comply with nov 2022-98778. ref pa200210280031. to legalize 6 dwelling units built without a permit. remove 1 dwelling which does not meet minimum dwelling size requirement. remove & replace sheetrock in 6 dwellings. add r-15 insulation. verify elec & plum per code. new roof deck w/ guardrails. Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Jun 23, 2023 | 320 Alemany Bl To legalize 4 dwelling units built without a permit. to comply with nov 2022-98778. ref pa200210280031. Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Apr 11, 2023 | 151 Bartlett St Legalize development of rooms on the g/f as part of the top floor unit (151 bartlett). work has done in 2021 without permit. Complete | Legalize or fix a violation | Complete | 2 months | |
| Sep 23, 2022 | 1090 Randolph St Obtain a cua (# 2022-009810) to merge (2) "in-law" units into one two-bedroom/one bath dwelling unit, and add religious use per cua. includes alterations & mep work. remove (e) bridge linking 1060 randolph to this property w/ all bridge supports removed. replace all windows in first floor unit. Issued | ADU | Issued | 34 months | |
| Feb 22, 2022 | 322 Alemany Bl In response to nov# 2008-81994 & 2009-88923, retroactively permitting a udu as an adu, with a variance for exposeure requirement. no construction is required for this permit.(unit legalization per 43-14) Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Feb 22, 2022 | 322 Alemany Bl In response to nov# 2008-81994 & 2009-88923, to remove 3 unpermitted dwellings, by merging them back into the original permitted 3 unit configuration. this will require a conditional use authorization. Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Feb 14, 2022 | 2324 North Point St To legalize unpermitted shower nov 202285933 Complete | Legalize or fix a violation | Complete | 8 months | |
| Jun 11, 2021 | 120 Downey St Replace rear yard wood egress stairway in-kind, cue to excessive dry-rot and decompose wood framing members. Cancelled | Deck, stairs or patio cover | Cancelled | — | |
| Jun 8, 2021 | 242 Broad St Junior adu program reference government code section 65852.22. adu on lower back of building (basement). related to complaint 2019-006608enf. Withdrawn | ADU | Withdrawn | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you David Scott Locicero? Request a correction.