Emily R Huang
Architect · Huang Iboshi Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-26901First issued Apr 28, 1997, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 37 permits since 2001, 37 in the last 5 years. Latest filed May 12, 2026.
- What kind of projects?
- Home remodel 16 · Addition 15 · Commercial or tenant improvement 2
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 16 permits in San Francisco
Time to get a permit
Median from filing to permit, from 15 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Nob Hill4
- West of Twin Peaks2
- Castro/Upper Market2
- Pacific Heights2
Most recent
- 764 Faxon AvRenovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs.Mar 15, 2022Complete
- 3146 Lyon StNew habitable area at 1st floor with new home office and bath.Mar 10, 2021Complete
- 125 Alpine TrRenovation of extg master bathroom. no addition to extg house.Apr 30, 2018Complete
- 2224 Jackson StDemo & renovation of (e) int.walls of garage, 1st & 2nd fl. excavation of (e) garage fl to allow new mud rm & new int. stairs from garage to 1st fl. unit# 1 renovation include new family rm, dining rm, kitchen, etc. with access to rear yard. 2nd fl renovation @ unit# 2 & 3 include new living rm,Aug 1, 2017Withdrawn
- 176 Nevada StInt. renovation of (e) kitchen. replacement of (e) skylight and windows in kitchen.Jul 12, 2017Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 12, 2026 | 21 05th Av Horizontal addition and renovation of (e) residence. excavate 1/f and replace foundations as required. Issued | Addition | Issued | 4 months | |
| Aug 13, 2025 | 1516 Shrader St Renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom. Issued | Addition | Issued | 9 months | |
| Jun 4, 2025 | 576 Sanchez St #0 Remove and replace second story redwood deck, approx 8'x20'. replace in kind. existing guardrail to remain. deck appears to be constructed per pa# 200012128569 Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Mar 13, 2023 | 2034 22nd Av Revision to pa #201909272918-s1. reduce scope of work. all work to be done on upper floor, bath remodel, (6) windows, (1) skylight, electrical upgrade in (2) bedrooms, (6) doors (3 pockets/3 regular) Complete | Revision or supplement | Complete | Within 1 month | |
| Mar 15, 2022 | 764 Faxon Av Renovation of 2 story house to include: kitchen, aster bath, master baedroom, library, bath #1, (n) powder room and replace (e) windows. reconstruct interior and exterior stairs. Complete | Home remodel | Complete | Within 1 month | |
| Mar 10, 2021 | 3146 Lyon St New habitable area at 1st floor with new home office and bath. Complete | Home remodelType unconfirmed | Complete | 4 months | |
| Jul 11, 2018 | 2900 Baker St Revision to 201706139212 structural updates Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 30, 2018 | 125 Alpine Tr Renovation of extg master bathroom. no addition to extg house. Complete | Home remodel | Complete | 2 months | |
| Dec 21, 2017 | 125 Alpine Tr Vertical addition of new meditation room south of (e) house above the (e) garage structure. Complete | Addition | Complete | 18 months | |
| Aug 1, 2017 | 2224 Jackson St Demo & renovation of (e) int.walls of garage, 1st & 2nd fl. excavation of (e) garage fl to allow new mud rm & new int. stairs from garage to 1st fl. unit# 1 renovation include new family rm, dining rm, kitchen, etc. with access to rear yard. 2nd fl renovation @ unit# 2 & 3 include new living rm, Withdrawn | Home remodelType unconfirmed | Withdrawn | — | |
| Jul 12, 2017 | 176 Nevada St Int. renovation of (e) kitchen. replacement of (e) skylight and windows in kitchen. Complete | Home remodel | Complete | 3 months | |
| Jun 13, 2017 | 2900 Baker St Horizontal addition and interior renovation. 1st flr: infill 103 sf for office & guest rm. new deck. renovation of kitchen, relocate interior stairs. 2nd flr: remodel (e) bedrms & baths. 3rd flr: rebuild the (e) roof deck Complete | Addition | Complete | 8 months | |
| Apr 14, 2017 | 176 Nevada St Addition of (n) accessory room w/new bath within bldg enverlop at ground floor. interior renovation of existing kitchen & stairway from garage to kitchen. replacement of existing skylight & windows in kithcen. Withdrawn | Addition | Withdrawn | — | |
| May 17, 2016 | 576 Sanchez St #0 Remodel to (e) library media room. (e) sauna converted into new homework area. Complete | Home remodel | Complete | 1 month | |
| Jan 28, 2016 | 1330 11th Av Rear yard add to (e)2 unit res. addition & renovation to add 1 bedroom and half bath on ground level, addition of (1)bedrm & (1)bath to each (e) d.u. seismic upgrade & (n)interior renovation @ all levels as req'd. outdoor decks/stairs add to rear of bldg. result:2 units over a garage Complete | AdditionType unconfirmed | Complete | 17 months | |
| Oct 22, 2015 | 1750 Taylor St #802 8th floor, unit #802 limited renovation: demo (e) interior east wall and rebuild for the unit Complete | Home remodel | Complete | Within 1 month | |
| Sep 29, 2015 | 3020 Clay St Horizontal addition. renovation addtion master bedroom, interior deck & master bath to become part of master bedrm. part of master bedrm into closets. 3rd fl to horizontal addition is covered w/ deck and rebuilt to code compliant stair & spiral stair is rebuilt to replace external stair case. Complete | Addition | Complete | 12 months | |
| Jun 23, 2015 | 1750 Taylor St #804 Unit merger only. combine unit 804 and 805. drm# 2015-007396. remove (e) door & wall dividing units interior renovation for new hall, entry foyer, butler pantry, closets match (e) finishes. Complete | Commercial or tenant improvement | Complete | 13 months | |
| May 27, 2015 | 3020 Clay St Interior renovation and remodel existing 3 story house. project includess conversion of existing bedroom into bathroom, interior renovation of bedroom 3 and activity room on 3rd fl, remodel bath 2 on 2nd fl. addition of 2 new dormer window&1new skylight in existing roof. renovated house 3 stories w/ Complete | Home remodel | Complete | Within 1 month | |
| Mar 18, 2015 | 1570 24th Av Excavate (e) 1/f to obtain 8' ceiling ht. @ 1/f. legalize & interior renovation of guest bedroom, closet, guest bath & family room. new stair from 1/f to 2/f. new patio doors to family room @ 1/f. new windows @ 1/f. renovate (e) patio, new opening @ kitchen. Complete | Legalize or fix a violation | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Emily R Huang? Request a correction.