CheckMyDesigner

Francis Malkham

Engineer · Design Everest Consulting · San Jose

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeCivil Engineer C-76860First issued Jul 16, 2010, expires Dec 31, 2026.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
5 permits since 2019, 5 in the last 5 years. Latest filed Jul 25, 2024.
What kind of projects?
Home remodel 2 · Addition 2 · ADU 1
How long do their permits take?
Home remodel: 6 months. City typical for the same review: 5 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
6 permits that name Francis Malkham, newest first, including 1 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Jul 25, 2024722 17th Av

Remodel area on the 1st fl. add 2 bedrooms, 1 family room, redo flooring. change 2nd floor floor plan. upgrade electrical meters fr0m 100 a to 200. redesign the floor plan w/ new roof plan, plumbing, lightings, hvac and water heater.

Complete
Jul 1, 2024815 Joost Av

Revision to pa# 2023-1018-8924 new concrete slab at lower fl. new double walls at the lower fl bedroom. change ceiling height to 8ft at lower floor. keep two existing windows at west wall on 2nd floor plan.

Expired
Oct 18, 2023815 Joost Av

Re-plan layout of 1st & the lower fl. add total of (2) bedrm & (2) baths. add (n) family rm, (n) office lower fl. redesign illegal space lower fl to comply w/ regulations & increase living area. provide elec (n) equip, update elec meter from 100a to 200a. (n) plumb, ligthing, water heater, elec

Complete
Oct 17, 20232380 Franklin St #0

Legalize 2nd unit at ground floor to jadu. add 2nd parking in (e) basement & reinforce foundation. add bedroom to 4th floor. add an elevator,doors & windows in the basement & 1st fl on th west elevation. new color for exterior,provide plu & elec.

Issued
Jun 12, 2023161 Delano Av

Condition basement space, w/a tall ceiling into liveable space2 bedrooms, shearlwall retrofit for basement; relocate laundry, 2 exterior doors, tiny addition for the staircase expansion, ac furnace - new; pg&e panel relocate to the outside flip at the same location

Complete
Mar 12, 20191419 Palou Av

Two 8'x8' dormers on roof per planning code with structural improvements to frame of house.

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Francis Malkham? Request a correction.