Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-27080First issued Aug 27, 1997, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 71 permits since 2001, 71 in the last 5 years. Latest filed Feb 10, 2026.
- What kind of projects?
- Commercial or tenant improvement 23 · New building 22 · Other 9
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 23 permits in San Francisco
Time to get a permit
Median from filing to permit, from 22 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 5,514 permits.
Where
- Financial District/South Beach19
- Pacific Heights2
- South of Market1
Most recent
- 301 Mission StOwners lounge: scope of project limited to interior renovation of selected spaces onlevel 2 of e project. ti spaces are l2 bar, pantry, and private dining door refurbishmentSep 28, 2022Issued
- 233 Geary StSite permit: adaptive reuse, mixed-use building, with (3) stories of residential units (21 total units) and (5) stories of offices, (3) stories of retail, and (2) levels of basement with retail and storage utilities.Sep 21, 2021Filed
- 301 Mission StSuite 00132: install temporary interior sound mitigation walls. new temp entry, reroute secondary exit through residential lobby & relocate atm.Mar 16, 2020Complete
- 735 Market St6th fl: partial floor ti. new non-bearing partitions, ceilings, finishes, sprinkler, fire alarm & mep under separate permit.Jan 31, 2019Complete
- 735 Market St5th fl: sale office ti non-bearing partitions. ceiling finishes, sprinkler, fire alarm & mep under separate permit.Jan 31, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Feb 10, 2026 | 360 05th St Erect type 1a over 4a 21-story 272 unit residential/commerical building. Filed | New building | Filed | — | |
| Sep 28, 2022 | 301 Mission St Owners lounge: scope of project limited to interior renovation of selected spaces onlevel 2 of e project. ti spaces are l2 bar, pantry, and private dining door refurbishment Issued | Commercial or tenant improvement | Issued | 4 months | |
| Aug 10, 2022 | 2525 Van Ness Av Rev pa201712277456-s2: level 1 ne retail storefront has been revised to accomodate the revised location of pge transformer vault in s/w.gas meter location and retail storefront entry door were flipped in order to maintain clearance requirements for the revised pg&e vault. relocating storefront Complete | Revision or supplement | Complete | Within 1 month | |
| May 5, 2022 | 919 Illinois St Proj-22-0463. port-priority. revision to pa 201911258098 to document 7 stories over basement per definitions of grade plane and story above grade plane in cbc chapter 2. Approved | Revision or supplement | Approved | — | |
| Mar 10, 2022 | 1320 Washington St Erect a 6 story, 25 dwellings residential with parking. type r-2,s-2,a-3. Filed | New building | Filed | — | |
| Sep 21, 2021 | 233 Geary St Site permit: adaptive reuse, mixed-use building, with (3) stories of residential units (21 total units) and (5) stories of offices, (3) stories of retail, and (2) levels of basement with retail and storage utilities. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 8, 2021 | 1001 Van Ness Av Revision to the issued s2 (arch/mep) ref pa 201607142409. to add clouded noted stating "employee use only bbq kitchen" for outdoors on levels 5, 11 & roof on architectural sheets of residential care facility for elderly. no other work done. bldg occupancy class r2.1 Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 31, 2021 | 950 Market St Exterior building maintenance eq of roof. ref pa# 201602089004 Complete | Revision or supplementType unconfirmed | Complete | 1 month | |
| Jun 9, 2021 | 531 Bryant St Demolition of 2-story commercial building Complete | Other | Complete | 10 months | |
| Oct 28, 2020 | 321 Florida St To erect 9 stories, 1 basement, type i-b, 168 residential units with retail & commercial building. (r-2,m,a-3,s-2) Approved | New building | Approved | — | |
| Aug 28, 2020 | 706 Mission St Install 4 exterior wall brass single faced non-illuminated sign "four seasons private residences 706 mission, san francisco" Issued | Other | Issued | 8 months | |
| Aug 28, 2020 | 706 Mission St Install 1 exterior corner non-illuminated wall marble sign "four seasons private residences 706 mission, san francisco" Issued | Other | Issued | 8 months | |
| Aug 7, 2020 | 1001 Van Ness Av For record purposes only re: approved pa #2016-0714-2409 s: unit count change from 215 to 208. clarifiy building occupancy classification as r-2.1. Complete | Revision or supplement | Complete | 16 months | |
| Jul 17, 2020 | 531 Bryant St To erect 6 stories, no basement, type i-b, mixed use office building. (b,m,a-3,s-2) ** maher: exempted - approval from dph attached ** Issued | New building | Issued | 12 months | |
| Mar 16, 2020 | 301 Mission St Suite 00132: install temporary interior sound mitigation walls. new temp entry, reroute secondary exit through residential lobby & relocate atm. Complete | Commercial or tenant improvement | Complete | 5 months | |
| Mar 6, 2020 | 706 Mission St Revision to pa# 201312204747-s5 (arch & mep). changes include updates to floor plans @ levels b1, 1,3,4,5,7,14,15,39 & 40. rcp, slab plans: elevations have been updated to cordinate to floor plans. mep updated accordingly. ** maher: n/a ** Complete | Revision or supplement | Complete | 12 months | |
| Feb 4, 2020 | 2301 Lombard St Revision to the issued addendum #2 (arch/mep) for pa#2016-12-28-5988; new hoistway smoke detector detail. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 24, 2019 | 706 Mission St Revision to aronson exterior restoration addendum #4. revison includes updates to the storefronts at 3rd st facade, mission st facade and the corner of 3rd & mission streets. porte cohere & 3rd st canopies. reference #201312204747 -s4 Complete | Revision or supplement | Complete | 6 months | |
| Dec 9, 2019 | 288 Pacific Av Install new non primary bike entry/exit exterior door at e exterior wall, 8'8" from e door within exterior alvove. extend e low voltage access control wiring. add exit sign, patch plstr. remove e door and cap prior low voltage access control wiring Cancelled | Other | Cancelled | — | |
| Nov 25, 2019 | 919 Illinois St Mou proj-19-0285 priority processing.to erect a 6-story, type 1b, 1-basement mixed use building w/ 241 residential units, ground level lobby, retail and commercial space. (port site permit b-2019-0321) Approved | New building | Approved | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.