Jordan Elling Hague
Engineer · Dci Engineers · Oakland
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-6509First issued Jun 13, 2017, expires Mar 31, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 8 permits since 2016, 8 in the last 5 years. Latest filed May 4, 2026.
- What kind of projects?
- Commercial or tenant improvement 4 · New building 3 · Addition 1
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 4 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 9,282 permits.
Where
- Financial District/South Beach4
Most recent
- 88 Spear St1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qworkMay 4, 2026Issued
- 201 Spear StGround fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work.Feb 20, 2026Complete
- 201 Spear St18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits.Aug 28, 2025Complete
- 88 Spear StRetail and office renovation to (e) bldg. levels b, 1, 2 core, shell and interior amenities renovation. separation of north and south side of lvl 1 w/1-hr rated construction. construction of inter story feature stairs in basement to lvl 1, and lvl 1 to lvl 2. demo (e) restrooms and construct (n)....Sep 4, 2024Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 21, 2026 | 2918 Mission St Temporary tower crane for new construction reference to issued pa#2016-12-28-5987 s Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| May 4, 2026 | 88 Spear St 1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qwork Issued | Commercial or tenant improvement | Issued | 3 months | |
| Feb 20, 2026 | 201 Spear St Ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Aug 28, 2025 | 201 Spear St 18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Mar 25, 2025 | 88 Spear St Deferred submittal for tower crane erection. ref pa#202501148243 for micro-pile foundation for tower crane foundation. ref pa# 202409040025 for foundation and anchor steel for crane; ref pa# 202409040014 for l11 tie-in steel, crane installation and rental. Issued | Revision or supplement | Issued | 4 months | |
| Oct 15, 2024 | 850 Turk St 100% affordable housing altered site permit for adminstrative construction type change form 1a to 1b. no change in building design as approved under site permit. reference pa# 202212087884. Issued | Revision or supplement | Issued | Within 1 month | |
| Oct 1, 2024 | 88 Spear St Construction of a 7,481 sf restaurant addition on the existing penthouse roof of the building, including the extension and upgrade of (2) existing elevators to new fsae elevators and elevator lobbies. Issued | AdditionType unconfirmed | Issued | 7 months | |
| Sep 4, 2024 | 88 Spear St Retail and office renovation to (e) bldg. levels b, 1, 2 core, shell and interior amenities renovation. separation of north and south side of lvl 1 w/1-hr rated construction. construction of inter story feature stairs in basement to lvl 1, and lvl 1 to lvl 2. demo (e) restrooms and construct (n).... Issued | Commercial or tenant improvement | Issued | 10 months | |
| May 10, 2024 | 1044 Howard St Review of proposed field changes to cmu wall under previously approved pa # 202305047097. review of proposed product change to underslab on grade waterproofing/vapor mitigation system under previously approved pa #202305047079. Complete | Revision or supplement | Complete | 3 months | |
| Dec 8, 2022 | 850 Turk St Priority processing - 100% affordable housing. to erect a 8-story, 92-dwelling units, type 1a mixed-used building. Issued | New building | Issued | 12 months | |
| Sep 28, 2022 | 639 Bryant St Priority processing, 100% affordable housing - construct 9-story, 85 dwelling units, type 1-b building. Issued | New building | Issued | 19 months | |
| Dec 28, 2016 | 2918 Mission St To erect 8 stories, no basement, type iii-a (5 story) / i-a, 75 (3 story) residential units with retail mixed use building. (r-2,m) building on block 6529, lot 002, 002a & 003. ** maher: exempt - approval letter from dph attached ** Issued | New building | Issued | 23 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jordan Elling Hague? Request a correction.