Jorge R Carbonell
Architect · Jorge Carbonell Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-30680First issued Jun 21, 2006, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 220 permits since 2006, 220 in the last 5 years. Latest filed Nov 2, 2026.
- What kind of projects?
- Home remodel 87 · Addition 29 · Commercial or tenant improvement 22
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 87 permits in San Francisco
Time to get a permit
Median from filing to permit, from 77 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 25,225 permits.
Where
- Marina10
- Presidio Heights8
- Noe Valley7
- West of Twin Peaks7
Most recent
- 411 Francisco St #105Unit f105: at first floor, remove wall between kitchen and hallway and replace countertop only. no work to existing cabinetry, fixtures, or appliances.Nov 2, 2026Filed
- 4150 Cesar Chavez StAt unit #6 on the 4th floor: 1)enlarge opening at kitchen; 2) new washer and dryer in kitchen; 3)new hvac heat pump for unit #6Aug 27, 2026Issued
- 77 Ventura Av2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room.Jul 13, 2026Issued
- 2215 California St3/fl- create (n) opening between (e) primary bedroom and (e) officeJul 6, 2026Issued
- 1819 08th Av2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm..Jul 6, 2026Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 2, 2026 | 411 Francisco St #105 Unit f105: at first floor, remove wall between kitchen and hallway and replace countertop only. no work to existing cabinetry, fixtures, or appliances. Filed | Home remodel | Filed | — | |
| Oct 30, 2026 | 451 Lombard St 1)legalize non-conforming addition at the rear of the top floor 418 sqft. 2) legalize underpermitted work at 2nd fl. interior walls removed and bath removed. all work at upper unit 451 lombard st. Filed | Legalize or fix a violation | Filed | — | |
| Sep 20, 2026 | 4150 Cesar Chavez St Correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26 Filed | Legalize or fix a violation | Filed | — | |
| Aug 27, 2026 | 4150 Cesar Chavez St At unit #6 on the 4th floor: 1)enlarge opening at kitchen; 2) new washer and dryer in kitchen; 3)new hvac heat pump for unit #6 Issued | Home remodel | Issued | Within 1 month | |
| Jul 13, 2026 | 77 Ventura Av 2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room. Issued | Home remodel | Issued | Within 1 month | |
| Jul 6, 2026 | 2215 California St 3/fl- create (n) opening between (e) primary bedroom and (e) office Issued | Home remodel | Issued | Within 1 month | |
| Jul 6, 2026 | 1819 08th Av 2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm.. Issued | Home remodel | Issued | Within 1 month | |
| May 27, 2026 | 399 10th Av At commercial buidling w/ 2 (e) commercial spaces. (1) remove (e) mezzanine. (2) new demising wall / division of 2 commercial spaces. (3) space "a", new entry door, new storefront, t.i to (e) bakery/store. (4) space "b", new entry door, new bathroom. space "b" to remain vacant. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| May 7, 2026 | 426 Valley St Convert part of garage & storage into conditioned space w/ new bedroom/bath/laundry & media rm; horizontal addition @ rear yard & side setback; new interior stairs; excavate grade;new heat pump & water heater;new rear deck;kitchen remodel;replace stairs @front setback;new half-bath;vertical addition Issued | Addition | Issued | 5 months | |
| May 4, 2026 | 880 Pacheco St Revision to pa# 202410032261 and 202505297482 and 202509225809 at rear yard along north property line, modify retaining wall to inlcude a planter. Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 26, 2026 | 201 Onondaga Av Mandatory seismic retrofit per ab-107: application of engineering criteria in sfbc chapter 4:d. Filed | Seismic retrofit or foundation | Filed | — | |
| Feb 26, 2026 | 201 Onondaga Av Per ca govt code 66323: turn part of (e) garage into 1 new accessory dwelling unit. Filed | ADU | Filed | — | |
| Feb 19, 2026 | 354 Arlington St Work only at front bldg. no work on cottage (rear bldg). 2/f: horizontal additions at sideyards to enlarge dining room. add new laundry. 2 new windows at rear bldg wall. 3/f: horizontal additions at sideyard to enlarge bedroom and add new closet. 4 new windows. at roof: 5 new skylights. Issued | Addition | Issued | 5 months | |
| Dec 13, 2025 | 249 Peru Av Remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors. Approved | Addition | Approved | — | |
| Nov 14, 2025 | 1570 Sanchez St Revision to 202508042195. replacement of ext stair at front to be in kind replacement< non conforming riser ht to remain at rear yard, modify new fence framing in lieu of guardrail Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 14, 2025 | 727 Rockdale Dr Revision to pa# 202212289235: at 1/f- expand proposed bath, convert proposed half bath to full bath, (n) exterior stairs in side yard, modify proposed interior stairs, relocate exterior door at side yard. at 2/f: new doors from living room to bedroom, replace (e) fireplace and chimney with (n)... Issued | Revision or supplement | Issued | 4 months | |
| Sep 22, 2025 | 880 Pacheco St Revision to 202410032261 and 202505297482. at rear yard - (e) rear fence to remain, new fence to be built in-board from (e) fence. foundation to be replaced in a sequence of sections. add floor drains to new patio concrete slab. new drainage detail for landscape retaining walls. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 5, 2025 | 750 Presidio Av #0 Per california government code 65852.2, turn part of garage and storage area into 3 new adus, new laundry room, reduced storage area w/ new toilet room. Issued | ADU | Issued | 6 months | |
| Aug 11, 2025 | 457 Duncan St 1st flr-horizontal addition @ rear yard w/ bedrm,bathrm,office & storage;convert (e)garage area into (conditioned space w/ laundry rm & mudrm;(n) interior stairs conneting 1st & 2nd flr;4)excavate grade @ rear yard. 2nd flr-demolish rear portion of bldg, deck & exterior stairs; horizontal 2025072512 Issued | Addition | Issued | 7 months | |
| Aug 4, 2025 | 1401 Waller St #0 Apartment #5, 3rd floor - relocate kitchen to living room; previous kitchen to become a bedroom Complete | Home remodel | Complete | 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jorge R Carbonell? Request a correction.