Juan Bautista Aleman Hernandez
Engineer · Tangobuilder · Dublin
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-86746First issued Dec 15, 2016, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 11 permits since 2021, 11 in the last 5 years. Latest filed Dec 8, 2023.
- What kind of projects?
- Home remodel 7 · Deck, stairs or patio cover 3 · ADU 1
- How long do their permits take?
- Home remodel: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,792 permits.
Where
- West of Twin Peaks2
- Nob Hill1
- Oceanview/Merced/Ingleside1
- Castro/Upper Market1
Most recent
- 712 Foerster StRemodel e kitchen. remodel existing bath. provide new skylightNov 22, 2023Complete
- 583 Mangels Av1/f: remove (e)garage & bathrm, create new garage, laundry rm, vestibule, bedrm, bathrm, walk-in closet, new utility area; remove (e)stairs, install new prefab spiral stairs; 2/f: remove (e)kitchen/dining room, closet, create new kitchen & closet for (e) bedroom. remodel (e) bathroom. new skylight.Nov 22, 2023Complete
- 1033 Green StBasement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear sidingSep 11, 2023Issued
- 290 Monticello StRelocate (e)washer/dryer, water heater and furnance to (e) garage. create new master bedroom and bathroom. hallway and under stairs storage in the rear (e)garage. remodel existing bathroom, remodel (e) kitchen, remove and replace (e) stairs to lower floor with new guardrail/handrail. replace (e)woodMay 31, 2023Complete
- 4333 19th StGuest bathroom addition - main bathroom remodel. wall framing in closet main bathroom. partial kitchen remodel & laundryFeb 24, 2023Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jan 14, 2025 | 583 Mangels Av Revision remove existing concrete area and rear stairs and provide new stairs and concrete slab revision to 2023-1122-1308 Expired | Revision or supplement | Expired | Within 1 month | |
| Aug 9, 2024 | 583 Mangels Av Revision to pa #202311221308 rretrofiting existing foundation wall with a sister new retaining wall. Filed | Revision or supplement | Filed | — | |
| Jan 29, 2024 | 712 Foerster St Revision to 202311221343. floor joist h oles for toilet pipe Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 8, 2023 | 65 Joost Av No work to existing bldg. add/construct 2 level deck for multi-residential home.add 2 entry doors,centered on interior hallway,add exterior wall sconce lighting,wiring and switches. Expired | Deck, stairs or patio cover | Expired | 10 months | |
| Nov 22, 2023 | 712 Foerster St Remodel e kitchen. remodel existing bath. provide new skylight Complete | Home remodel | Complete | Within 1 month | |
| Nov 22, 2023 | 583 Mangels Av 1/f: remove (e)garage & bathrm, create new garage, laundry rm, vestibule, bedrm, bathrm, walk-in closet, new utility area; remove (e)stairs, install new prefab spiral stairs; 2/f: remove (e)kitchen/dining room, closet, create new kitchen & closet for (e) bedroom. remodel (e) bathroom. new skylight. Complete | Home remodel | Complete | 5 months | |
| Sep 11, 2023 | 1033 Green St Basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear siding Issued | Home remodel | Issued | 2 months | |
| Aug 4, 2023 | 290 Monticello St Revision to bpa#202305318919, underpinningn for strip footing, 1/f framing as shown on original plan. Complete | Revision or supplement | Complete | Within 1 month | |
| May 31, 2023 | 290 Monticello St Relocate (e)washer/dryer, water heater and furnance to (e) garage. create new master bedroom and bathroom. hallway and under stairs storage in the rear (e)garage. remodel existing bathroom, remodel (e) kitchen, remove and replace (e) stairs to lower floor with new guardrail/handrail. replace (e)wood Complete | Home remodel | Complete | Within 1 month | |
| Apr 18, 2023 | 417 27th St Revision to pa# 202112305232, new foundation details per field conditions. Cancelled | Revision or supplement | Cancelled | — | |
| Mar 21, 2023 | 417 27th St Structural revision to permit 202112305232. new foundation detail per field conditions; add detail 3/s403 to not undermine (e) structure's foundation Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 24, 2023 | 4333 19th St Guest bathroom addition - main bathroom remodel. wall framing in closet main bathroom. partial kitchen remodel & laundry Complete | Home remodel | Complete | 1 month | |
| Oct 31, 2022 | 606 Mississippi St 1/f: convert part of (e) garage & utility room to new kitchen, living & powder rooms, new staircsae to 2/f; 2/f: (e) staircase to 3/f to be removed/relocated, new primary bedroom, primary bathroom, new full bathroom @ hallway; 3/f: install (2) new dormers, new full bathroom Withdrawn | Home remodel | Withdrawn | — | |
| Aug 17, 2022 | 2015 Sacramento St Unit 104: remodel of (e) ground floor unit 104. excavate 7in at g/f unit. Complete | Home remodel | Complete | 11 months | |
| Jul 11, 2022 | 1 Twin Peaks Bl Interior stairs and work by plans. new roof deck. skylights, replace garage door within (e) opening. Complete | Deck, stairs or patio coverType unconfirmed | Complete | 5 months | |
| May 27, 2022 | 66 Gladstone Dr (n) 1 bedrm, 1 bath adu at lower level. main home remodel & addition. upper level work includes (n) bathroom, office/bedroom, & stairs. lower level work includes (n) laundry area. front yard work, (n) patio & entryway for adu, replace (e) driveway w/ permeable paving. Issued | ADU | Issued | 16 months | |
| Dec 30, 2021 | 417 27th St Demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl. Complete | Deck, stairs or patio cover | Complete | 7 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Juan Bautista Aleman Hernandez? Request a correction.