Judith Ann Mattingly
Architect · Mattingly Thaler Archit. · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-23854First issued Jan 6, 1993, expires Jan 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 14 permits since 2014, 14 in the last 5 years. Latest filed Feb 6, 2026.
- What kind of projects?
- Addition 6 · Home remodel 5 · Other 2
- How long do their permits take?
- Addition: 7 months. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 1,691 permits.
Where
- Inner Richmond1
- Outer Richmond1
- Sunset/Parkside1
- West of Twin Peaks1
Most recent
- 3342 Fulton StAdditions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets.Feb 6, 2026Issued
- 858 25th AvExtend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side.Mar 30, 2023Complete
- 1919 47th Av2-story rear addition with primary bedroom suite, guest bedroom and family room. relocate & remodel 1st fl bath & laundry. remodel (e) 2nd fl bathroom. relocate 2nd fl kitchen. enlarge entry stairs. widen & recess garage door. widen entry gate. add deck & stair at rear of house.Jul 28, 2022Complete
- 2542 15th AvAddition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stairNov 18, 2020Issued
- 11 17th AvEnclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallwayJan 11, 2019Expired
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Feb 6, 2026 | 3342 Fulton St Additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets. Issued | Addition | Issued | 5 months | |
| Aug 25, 2025 | 3625 19th St #0 Remodel kitchen and bathroom, replace bath, kitchen and hallway windows. move bedroom wall, add closet. Complete | Home remodel | Complete | 2 months | |
| Sep 12, 2024 | 101 Lombard St #11 Rev to pa# 2024-0523-2874: to remove the interior (e) straight and install a spiral stair fill in stair opening and decrease opening at spiral stair relapce (e) 8' door with glass panel and replace (e) glass panel with 8' door. unit# 11e Complete | Revision or supplement | Complete | 2 months | |
| Sep 11, 2024 | 858 25th Av Rev 202303304778: foundation revision to remove and replace (e) substandard foundation. Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Jun 28, 2023 | 4659 18th St #0 Remodel kitchen with new applilances and cabinets; relocate sink, install electric washer and dryer; convert a swinging door to a pocket door between office and kitchen. Complete | Home remodel | Complete | Within 1 month | |
| Mar 30, 2023 | 858 25th Av Extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side. Complete | Addition | Complete | 12 months | |
| Feb 3, 2023 | 455 Connecticut St Revision to 202103317570. expand existing roof deck to front of second floor wall, and to side of second floor wall. move railing to edge of existing roof. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 28, 2022 | 1919 47th Av 2-story rear addition with primary bedroom suite, guest bedroom and family room. relocate & remodel 1st fl bath & laundry. remodel (e) 2nd fl bathroom. relocate 2nd fl kitchen. enlarge entry stairs. widen & recess garage door. widen entry gate. add deck & stair at rear of house. Complete | Addition | Complete | 14 months | |
| May 17, 2022 | 2542 15th Av Replace rear exterior stair with new wood stair. repair deteriorated front stucco, repair front stairs for dryrot (no structural work front stairs) Issued | Deck, stairs or patio cover | Issued | 1 month | |
| Aug 31, 2021 | 3249 Pacific Av Remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting. Complete | Home remodel | Complete | Within 1 month | |
| Nov 18, 2020 | 2542 15th Av Addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stair Issued | Addition | Issued | 5 months | |
| Feb 7, 2020 | 890 El Camino Del Mar Rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door. Withdrawn | Revision or supplement | Withdrawn | — | |
| Dec 31, 2019 | 4252 21st St Relocate kitchen, remodel (e) bath, add bath in (e) laundry area, add 2 skylights. convert (e) to new master bedroom. Complete | Home remodel | Complete | Within 1 month | |
| Jun 17, 2019 | 11 17th Av Replace sloped tile roof with taller flat roof. replace windows with painted wood casement windows. add wood trim at windows and brackets at roofing. only the front 4' of the building is affected. Expired | Other | Expired | 4 months | |
| Jun 6, 2019 | 11 17th Av Revision to 201901110116 voluntary stregthening of the front portion of the house foundation on addition to the original proposed scope Cancelled | Revision or supplement | Cancelled | — | |
| Apr 24, 2019 | 890 El Camino Del Mar Construct an elevator enclosure along the east side of the house, connecting (4) levels of the house. Complete | OtherType unconfirmed | Complete | 4 months | |
| Jan 11, 2019 | 11 17th Av Enclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallway Expired | AdditionType unconfirmed | Expired | 4 months | |
| Jul 17, 2015 | 11 17th Av Bath remodel with new fixtures & finishes, add lights @ bedroom, new cabinet in study. remove extg window and add 2 windows. not visible from street at rear wall. Complete | Home remodel | Complete | Within 1 month | |
| Jul 21, 2014 | 232 Guerrero St Addition to rear of bldg on 3rd floor including 1 bath, 1 bedroom, 1 personal office and exercise room Complete | Addition | Complete | 8 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Judith Ann Mattingly? Request a correction.