Kelly Eleanor Manning
Architect · Kelly Manning · Berkeley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34603First issued Jan 13, 2014, expires Feb 28, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 14 permits since 2015, 14 in the last 5 years. Latest filed Jun 30, 2023.
- What kind of projects?
- Home remodel 9 · Addition 2 · Commercial or tenant improvement 1
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,218 permits.
Where
- Mission2
- Nob Hill2
- Seacliff2
- Inner Sunset1
Most recent
- 3511 23rd StKitchen & bath remodel, turn 3-bedroom, 2.5-bath to a 3-bedroom, 2-bath, new laundry room, update all power/lighting per plan. no exterior work.Jun 30, 2023Complete
- 1358 15th AvWithin the extg envelope, 1/f- new office, family room, bath, laundry and insulate the garage space; 2/f- kitchen and bath remodel, new windows and doors on the rear of property, remove exterior stair to grade, new interior stair to 1st story, no work on 3/f. new rear deck on grade less than 30".Jun 27, 2023Complete
- 837 Dolores St #0Unit #837: remodel (e) kitchen & bathroom. add half bathroom. add laundry at pantry.Apr 28, 2022Complete
- 944 Vallejo St #0Front building: add wet bar. remodel bathroom in-kind. 944f sleeping room in front building under 2 units.Jan 27, 2022Complete
- 946 Vallejo StConvert existing closet to a new half bath. remodel exising bathroom under permit 202109148419. not moving any walls. lighting to comply with cec 150.0(k). replace countertop and backsplash in the existing kitchen. all non-structural.Oct 4, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 3, 2024 | 1358 15th Av Revision to pa 202302172212 new wood framed stair from approved 2nd fl deck to approved 1st floor deck Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 30, 2023 | 3511 23rd St Kitchen & bath remodel, turn 3-bedroom, 2.5-bath to a 3-bedroom, 2-bath, new laundry room, update all power/lighting per plan. no exterior work. Complete | Home remodel | Complete | Within 1 month | |
| Jun 27, 2023 | 1358 15th Av Within the extg envelope, 1/f- new office, family room, bath, laundry and insulate the garage space; 2/f- kitchen and bath remodel, new windows and doors on the rear of property, remove exterior stair to grade, new interior stair to 1st story, no work on 3/f. new rear deck on grade less than 30". Complete | Home remodel | Complete | Within 1 month | |
| Feb 17, 2023 | 1358 15th Av First floor: rear yard deck addition second floor: add deck and stair. in-fill existing door. third floor: convert porch on third floor to enclosed conditioned space. roof: extend roof above new enclosed conditioned space below. Complete | Addition | Complete | 9 months | |
| Feb 7, 2023 | 438 Vicksburg St New deck at 3rd fl (horizontal addition). new door and clerestory window at bedroom 3. Expired | Addition | Expired | 11 months | |
| Jan 24, 2023 | 438 Vicksburg St Revision to 202209273212 add roof deck to roof over kitchen. new door from bedroom 2 to proposed roof deck. new storage room on 1st fl to replace homework station. Expired | Revision or supplement | Expired | Within 1 month | |
| Sep 27, 2022 | 438 Vicksburg St Replace structural foundation on 1/f. convert portion of (e) garage to conditioned space. replace rear yard stairs to 2/f with 2/f deck within rear yard setback. bath and kitchen interior remodel. add interior stairs from 1/f to 2/f. no addition. Expired | Seismic retrofit or foundation | Expired | Within 1 month | |
| Apr 28, 2022 | 837 Dolores St #0 Unit #837: remodel (e) kitchen & bathroom. add half bathroom. add laundry at pantry. Complete | Home remodel | Complete | Within 1 month | |
| Jan 27, 2022 | 944 Vallejo St #0 Front building: add wet bar. remodel bathroom in-kind. 944f sleeping room in front building under 2 units. Complete | Home remodel | Complete | Within 1 month | |
| Oct 4, 2021 | 946 Vallejo St Convert existing closet to a new half bath. remodel exising bathroom under permit 202109148419. not moving any walls. lighting to comply with cec 150.0(k). replace countertop and backsplash in the existing kitchen. all non-structural. Complete | Home remodel | Complete | Within 1 month | |
| Aug 3, 2021 | 98 Estero Av Kitchen remodel: replace plumbing fixtures and appliances in (e) locations and move range to north wall. new cabinets counters, tile, flooring. replace 3 windows in-kind (glazing). replacement windows to match in-kind material operation. Complete | Home remodel | Complete | Within 1 month | |
| Feb 22, 2017 | 195 26th Av #0 Unit #5: renovating kitchen, laundry and bath, addition of 1 full bathroom anbd conversion of kitchen to office/den. no work at exterior walls, all (e) windows to remain except one which is a reducation of glazing, window opening will not change. Complete | Home remodel | Complete | Within 1 month | |
| Dec 1, 2016 | 195 26th Av #0 Apt 4: renovate kitchen, laundry and bath. addition of 1 full bathroom and conversion of dining room to bedroom. Complete | Home remodel | Complete | Within 1 month | |
| Jul 26, 2016 | 1856 Green St #0 Unit 5 on 1st floor - kitchen and bathroom remodel, remove back fireplace, add concrete footing, add header. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| May 27, 2016 | 944 Vallejo St #0 Cut concrete to allow for 3 new 1 hr rated windows. provide pressure treated joists & wood finish on the floor. provide new outlets and lights, with a sub panel in the renovated shared laundry space. new windo and door at the entry to replace (e). new hvac system to provide better ventelation Complete | Commercial or tenant improvementType unconfirmed | Complete | 3 months | |
| Jan 7, 2015 | 944 Vallejo St #0 (rear bldg) pull up existing trex decking replace all waterproofing on concrete storage (deck 1 & 2). Complete | Deck, stairs or patio cover | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Kelly Eleanor Manning? Request a correction.