CheckMyDesigner

Kelly Eleanor Manning

Architect · Kelly Manning · Berkeley

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-34603First issued Jan 13, 2014, expires Feb 28, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
14 permits since 2015, 14 in the last 5 years. Latest filed Jun 30, 2023.
What kind of projects?
Home remodel 9 · Addition 2 · Commercial or tenant improvement 1
How long do their permits take?
Home remodel: within 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
16 permits that name Kelly Eleanor Manning, newest first, including 2 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
May 3, 20241358 15th Av

Revision to pa 202302172212 new wood framed stair from approved 2nd fl deck to approved 1st floor deck

Complete
Jun 30, 20233511 23rd St

Kitchen & bath remodel, turn 3-bedroom, 2.5-bath to a 3-bedroom, 2-bath, new laundry room, update all power/lighting per plan. no exterior work.

Complete
Jun 27, 20231358 15th Av

Within the extg envelope, 1/f- new office, family room, bath, laundry and insulate the garage space; 2/f- kitchen and bath remodel, new windows and doors on the rear of property, remove exterior stair to grade, new interior stair to 1st story, no work on 3/f. new rear deck on grade less than 30".

Complete
Feb 17, 20231358 15th Av

First floor: rear yard deck addition second floor: add deck and stair. in-fill existing door. third floor: convert porch on third floor to enclosed conditioned space. roof: extend roof above new enclosed conditioned space below.

Complete
Feb 7, 2023438 Vicksburg St

New deck at 3rd fl (horizontal addition). new door and clerestory window at bedroom 3.

Expired
Jan 24, 2023438 Vicksburg St

Revision to 202209273212 add roof deck to roof over kitchen. new door from bedroom 2 to proposed roof deck. new storage room on 1st fl to replace homework station.

Expired
Sep 27, 2022438 Vicksburg St

Replace structural foundation on 1/f. convert portion of (e) garage to conditioned space. replace rear yard stairs to 2/f with 2/f deck within rear yard setback. bath and kitchen interior remodel. add interior stairs from 1/f to 2/f. no addition.

Expired
Apr 28, 2022837 Dolores St #0

Unit #837: remodel (e) kitchen & bathroom. add half bathroom. add laundry at pantry.

Complete
Jan 27, 2022944 Vallejo St #0

Front building: add wet bar. remodel bathroom in-kind. 944f sleeping room in front building under 2 units.

Complete
Oct 4, 2021946 Vallejo St

Convert existing closet to a new half bath. remodel exising bathroom under permit 202109148419. not moving any walls. lighting to comply with cec 150.0(k). replace countertop and backsplash in the existing kitchen. all non-structural.

Complete
Aug 3, 202198 Estero Av

Kitchen remodel: replace plumbing fixtures and appliances in (e) locations and move range to north wall. new cabinets counters, tile, flooring. replace 3 windows in-kind (glazing). replacement windows to match in-kind material operation.

Complete
Feb 22, 2017195 26th Av #0

Unit #5: renovating kitchen, laundry and bath, addition of 1 full bathroom anbd conversion of kitchen to office/den. no work at exterior walls, all (e) windows to remain except one which is a reducation of glazing, window opening will not change.

Complete
Dec 1, 2016195 26th Av #0

Apt 4: renovate kitchen, laundry and bath. addition of 1 full bathroom and conversion of dining room to bedroom.

Complete
Jul 26, 20161856 Green St #0

Unit 5 on 1st floor - kitchen and bathroom remodel, remove back fireplace, add concrete footing, add header.

Complete
May 27, 2016944 Vallejo St #0

Cut concrete to allow for 3 new 1 hr rated windows. provide pressure treated joists & wood finish on the floor. provide new outlets and lights, with a sub panel in the renovated shared laundry space. new windo and door at the entry to replace (e). new hvac system to provide better ventelation

Complete
Jan 7, 2015944 Vallejo St #0

(rear bldg) pull up existing trex decking replace all waterproofing on concrete storage (deck 1 & 2).

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Kelly Eleanor Manning? Request a correction.