Leo Panian
Engineer · Tipping Structural Engineers · Albany
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-4526First issued Feb 8, 2001, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2012, 12 in the last 5 years. Latest filed Jul 22, 2026.
- What kind of projects?
- Commercial or tenant improvement 5 · Seismic retrofit or foundation 2 · Other 2
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: 2 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 5 permits in San Francisco
Time to get a permit
Median from filing to permit, from 5 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 10,769 permits.
Where
- Financial District/South Beach4
- Tenderloin1
Most recent
- 4 Embarcadero Center39th & 40th flrs: tenant improvement including: * selective demolition of offices and pantry * new non-load bearing partitions, ceiling, light fixtures & finishes * new operable partitionsJul 22, 2026Issued
- 221 Main StPriority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures.Apr 15, 2025Complete
- 680 Folsom St15th floor. renovation of existing roof deck, including new convenience restroom and new elevator lobby finishes, select demo and new partitions, ceilings, doors, finishes. installation of new shade structure and planting beds. mep deferredMar 5, 2025Complete
- 1 Sansome St36/f: addition of (2) new phone booths in (e) office spaceJun 30, 2023Complete
- 445 Geary St #0Lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a.Jun 6, 2019Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 22, 2026 | 4 Embarcadero Center 39th & 40th flrs: tenant improvement including: * selective demolition of offices and pantry * new non-load bearing partitions, ceiling, light fixtures & finishes * new operable partitions Issued | Commercial or tenant improvement | Issued | 3 months | |
| Apr 1, 2026 | 766 San Francisco Golf Club Rd Construction of a new parking area and uncovered sand storage space. under separate pa# 202509245990, new maintenance building and administrative offices and associated site work. Approved | Retaining wall or site workType unconfirmed | Approved | — | |
| Nov 25, 2025 | 754 San Francisco Golf Club Rd Construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work. Issued | New building | Issued | 4 months | |
| Apr 23, 2025 | 554 Commercial St #0 No exterior work planning approval under record # 2024001942 pta. full seismic retrofit, interior work includes ground floor bookstore, office, restrooms, new elevator, stairs at rear of interior. Issued | Seismic retrofit or foundationType unconfirmed | Issued | 5 months | |
| Apr 15, 2025 | 221 Main St Priority processing per ab-004.t.i of suites 104 & 250 on 1st fl & 2nd fl to create space for non-profit,private school for for grade 6-12,interior demolition of interior,including portion of 2nd fl structural slab for(n) stair opening,construction of(n)paritions doors,ceilings,finishes,fixtures. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Mar 5, 2025 | 680 Folsom St 15th floor. renovation of existing roof deck, including new convenience restroom and new elevator lobby finishes, select demo and new partitions, ceilings, doors, finishes. installation of new shade structure and planting beds. mep deferred Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 14, 2024 | 333 Dolores St Revision to addendum #2 (foundation and structure) of pa# 202209071941: to remove (2) windows from east elevation in accordance with changes made during plan check revisions of addendum #3 (amep). Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 30, 2023 | 1 Sansome St 36/f: addition of (2) new phone booths in (e) office space Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jun 7, 2022 | 143 Beaumont Av Voluntary partial seismic strengthening at ground floor. supplementing current installation of hold downs & shear plywood. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Dec 6, 2019 | 1455 03rd St Installation of art on (e) privately owned, publicly accessed open space, lot 34. Complete | Other | Complete | 2 months | |
| Dec 6, 2019 | 1515 03rd St #0 Installation of art on (e) privately owned, publicly accessed pierpoint lane. Complete | OtherType unconfirmed | Complete | 2 months | |
| Jun 6, 2019 | 445 Geary St #0 Lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Feb 29, 2012 | 1275 Market St #0 Voluntary upgrade to the extg building egress. exterior to 2 extg egress stairs between floor 1-2 and 3-8. Issued | Deck, stairs or patio cover | Issued | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Leo Panian? Request a correction.