Luis Antonio Robles
Architect · Robles & Assocciates
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License status: RevokedArchitect C-21700First issued Jul 18, 1990, expires Dec 31, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 154 permits since 2002, 154 in the last 5 years. Latest filed Oct 16, 2026.
- What kind of projects?
- Commercial or tenant improvement 37 · Home remodel 35 · Legalize or fix a violation 23
- How long do their permits take?
- Commercial or tenant improvement: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 37 permits in San Francisco
Time to get a permit
Median from filing to permit, from 32 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 13,900 permits.
Where
- Sunset/Parkside5
- Bayview Hunters Point4
- Lone Mountain/USF3
- Mission3
Most recent
- 3421 Geary Bl #0Tenant improvement, propose to add massage services to the (e) beauty facility. minor interior work. re-skin (e) awning sign only. building permit for change of the awning cover.Oct 16, 2026Issued
- 680 Valencia StProposing a new food prep area, to serve pastries, coffee & ice cream. adding hand sink & liquid disposal sink. no alteration to (e) exits.Jul 5, 2023Complete
- 4465 Mission StTenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867).Apr 14, 2023Complete
- 1444 BroadwayConverting unit#3 at 1444 broadway av. becoming unit#3 & unit #4 1444 broadwayJan 20, 2023Complete
- 2323 Noriega St #203Relocate (e) health service/accupuncture from 2000 noriega street to 2323 noriega street, suite 203. (e) facility has ada common area that complies, v.i.f. existing hvac system remain. no massage.Sep 28, 2022Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 16, 2026 | 3421 Geary Bl #0 Tenant improvement, propose to add massage services to the (e) beauty facility. minor interior work. re-skin (e) awning sign only. building permit for change of the awning cover. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Jun 4, 2026 | 38 B Chenery St Revision to pa# 202101192880, to use state adu program instead of local program, to remove the fire sprinklers as no longer required under adu r3, keep 2ft existing nonconforming rear structure, remove side door into exterior hallway. no change to building envelope. Filed | Revision or supplement | Filed | — | |
| Feb 13, 2026 | 1926 Jefferson St Revision to permit pa #202506068160. to new deck and new 1 hour wall at existing stairs. Filed | Revision or supplement | Filed | — | |
| Dec 4, 2025 | 1670 Page St Revision to 202203311315: change dining area to bedroom #2 Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 8, 2025 | 3516 Sacramento St Revision to pa# 202108025569: replace ladder with a drop ladder from 2nd fl to ground fl Filed | Revision or supplement | Filed | — | |
| Jul 31, 2025 | 158 Detroit St Basement: convert existing bedroom #4 into 2 new bathrooms and exercise room. Complete | Home remodel | Complete | Within 1 month | |
| Jun 20, 2025 | 1926 Jefferson St Privacy walls. Filed | Home remodel | Filed | — | |
| Jun 6, 2025 | 1926 Jefferson St (n) deck and (n) 1 hr wall at (e) stairs Reinstated | Deck, stairs or patio cover | Reinstated | Within 1 month | |
| Mar 21, 2025 | 378 Vernon St Voluntary seismic strengthening to lower level; remodel family room, add new bathroom at 1st floor, remodel kitchen at 2nd floor. Complete | Seismic retrofit or foundation | Complete | Within 1 month | |
| Mar 20, 2025 | 5041 Geary Bl Propose to stranghten the existing front entrance corner entrance door approved under pa 202312223018 Complete | Revision or supplement | Complete | 4 months | |
| Feb 21, 2025 | 3516 Sacramento St This permit is for m.e.p. under pa# 2021-0802-5569 Issued | Revision or supplement | Issued | 1 month | |
| Jan 14, 2025 | 1926 Jefferson St Roof deck over 4th floor Cancelled | Deck, stairs or patio cover | Cancelled | — | |
| Nov 21, 2024 | 137 Chilton Av Demo delapitated unpermitted in-law on the ground floor and rebuild a new adu unit to included 1-bedroom, kitchen, bathroom, dining/living space. remodel existing kitchen and bathroom on the main house. remove existing deck on the 2nd flr and rebuild a sunroom. Cancelled | ADU | Cancelled | — | |
| Jan 25, 2024 | 1670 Page St Clarified attic as storage only - work under this permit to install 1-hr door at second level at bottom of stairs from attic level. reference permits# 202107013553 and 202102164709. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 20, 2023 | 38 Chenery St Legalize interior stair (interior front part of building) to connect 1st fl to 2nd fl per nov# 202309946. all other work at 1st fl is under adu pa# 202101192880 (rear of building). no change of (e) building envelope. Filed | Legalize or fix a violation | Filed | — | |
| Jul 28, 2023 | 1134 Geneva Av Add 1 studio adu on (e) 1/f with 1 full bathroom & 1 kitchen. see related pa 202107295371. Withdrawn | ADU | Withdrawn | — | |
| Jul 5, 2023 | 680 Valencia St Proposing a new food prep area, to serve pastries, coffee & ice cream. adding hand sink & liquid disposal sink. no alteration to (e) exits. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 14, 2023 | 4465 Mission St Tenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867). Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 5, 2023 | 222 Webster St Legalize an existing unwarranted gr floor unit ( soft story already completed and finaled) Complete | Legalize or fix a violation | Complete | 19 months | |
| Mar 1, 2023 | 9 Mayfair Dr Interior remodel on 2nd and 3rd floor. remodel extg 2 kitchens and extg 2 bathrooms. adding 2 new bathrooms. no work on 1st floor. no change of front and bldg envelope. remove 2nd fl fireplace Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Luis Antonio Robles? Request a correction.