CheckMyDesigner

Man Yip Li

Architect · Schaub Li Architects

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeArchitect C-39027First issued Feb 22, 2021, expires May 31, 2027.

Source: DCA License Search, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
21 permits since 2019, 21 in the last 5 years. Latest filed Sep 14, 2026.
What kind of projects?
Addition 5 · Commercial or tenant improvement 5 · Legalize or fix a violation 5
How long do their permits take?
Addition: 6 months. City typical for the same review: 3 months.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
24 permits that name Man Yip Li, newest first, including 3 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Sep 14, 2026679 Mcallister St

Interior remodel & alteration. remodel (e) restroom 5'x10' at 1st fl. add new stairs to mezzanine. add storage room at mezzanine.

Filed
Sep 11, 20261241 Powell St

Interior remodel and alteration to (e) ground floor commerical space. (e) hair salon and proposed (n) dental office to the public per sf planning sec 812. install (n) partitions to create dental office, remodel bathrooms, and replace fixtures and finishes. no change to occupancy.

Filed
Sep 9, 2026791 21st Av

Unit 791: remodel (e) kitchen - 7'x10.75'. remodel (e) bath 8x5. add new bath 7x5. new subpanel with 120/240 volts/ 50a feeder. rewire receptacles, switches, lights in bedrooms, living room, bathroom & hallway.

Issued
Aug 26, 2026626 08th Av

Interior remodel & alteration, horizontal addition.

Issued
Aug 23, 202683 Harrington St

Raise existing single family dwelling +-24". expand 3rd floor with gable roof, remodel interior with new stairs. subject to ab-112, all electric ordinance.

Filed
Aug 19, 20262758 38th Av

To comply w/nov#: 202659648 and 202659341. remodel 2nd flr bathroom. add partition at (e) living room to create (n) media room. replace plumbing, replace shower pan, replace tile around shower pan

Issued
Jul 29, 20261801 Alemany Bl

Barrier removal, add one van accessible parking

Issued
Jun 25, 202677 Bruton St

G/f- tenant improvement in existing vacant space. change of use to cafe. proposed new cafe: aracely cafe. add new entrace door facing bruton st.

Issued
Jun 1, 202639 Gladeview Wy

(n) rear yard patio and deck max. 6 feet above (e) grade

Issued
Apr 28, 20262700 Mission St

Correct nov 202173787: complies w/ mandatory soft-story retrofit ordinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades.

Filed
Mar 6, 2026225 Cotter St

To comply with nov 202548687. 1/f: legalize wetbar, partition wall for storage space, bathroom, front window and 1-hr rated wall at garage. 2/f: legalize 2 sliding doors, bathroom, half bath, kitchen remodel. legalize and verify electrical and plumbing work done without permit.

Filed
Feb 19, 20262700 Mission St

Correct nov 202173787: complies w/ mandatory soft-story retrofit oridinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades.

Filed
Dec 18, 2025984 Moscow St

Correct building code violation, complaint his# 202423508, his# 202423643 & his# 202423644. 1st floor unit legalization per ordinance# 43-14. no change to front facade or structure.

Cancelled
Jan 27, 20251410 Post St

Revision to pa # 2024-0227-6620 relocate bathroom & alter hold down & shear wall location

Issued
Jan 27, 20251616 Taylor St

Revision to permits 201803133492 and 202412136811. revise unit a and unit b layout. interior layout only. 11 (e) + (n) 3 adu's

Complete
Dec 13, 20241616 Taylor St

Revision to approved bpa#201803133492 revise interior layouts.

Complete
Jun 27, 2024326 Santa Ana Av

Remodel existing single family dwelling; 1st flr- add bathroom & replace kitchen fixtures; basement- fill-in below rear overhang & excavate front window well for new bedroom & office.

Issued
Jul 13, 2023678 23rd Av

Interior remodel of e single family dwelling, 2-story horizontal addition at rear of building. infill lightwell not visible from any site land. relocate rear exterior stairs, no change to front facade. no change to building height

Complete
Apr 7, 2023246 Girard St

1st flr add 2-bedrm, 1-bath, 1-living rm, 2nd flr add 1-bath, infill below e 2nd flr at rear, infill lightwell not visible from any off site land, no change to bldg height or depth, lower e 1st flr by +/- 18", remove front & rear ext stairs, relocate front entry to 1st flr.

Complete
Nov 23, 20221251 Gilman Av

Correct planning code and building code violation 2022-010222enf & complaint #202295933. first floor unit legalization per ordinance #43-14. separte sprnkler permit

Issued

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Man Yip Li? Request a correction.