Man Yip Li
Architect · Schaub Li Architects
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-39027First issued Feb 22, 2021, expires May 31, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 21 permits since 2019, 21 in the last 5 years. Latest filed Sep 14, 2026.
- What kind of projects?
- Addition 5 · Commercial or tenant improvement 5 · Legalize or fix a violation 5
- How long do their permits take?
- Addition: 6 months. City typical for the same review: 3 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 5 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 9,382 permits.
Where
- Inner Richmond1
- Outer Mission1
- West of Twin Peaks1
- Outer Richmond1
Most recent
- 626 08th AvInterior remodel & alteration, horizontal addition.Aug 26, 2026Issued
- 83 Harrington StRaise existing single family dwelling +-24". expand 3rd floor with gable roof, remodel interior with new stairs. subject to ab-112, all electric ordinance.Aug 23, 2026Filed
- 326 Santa Ana AvRemodel existing single family dwelling; 1st flr- add bathroom & replace kitchen fixtures; basement- fill-in below rear overhang & excavate front window well for new bedroom & office.Jun 27, 2024Issued
- 678 23rd AvInterior remodel of e single family dwelling, 2-story horizontal addition at rear of building. infill lightwell not visible from any site land. relocate rear exterior stairs, no change to front facade. no change to building heightJul 13, 2023Complete
- 246 Girard St1st flr add 2-bedrm, 1-bath, 1-living rm, 2nd flr add 1-bath, infill below e 2nd flr at rear, infill lightwell not visible from any off site land, no change to bldg height or depth, lower e 1st flr by +/- 18", remove front & rear ext stairs, relocate front entry to 1st flr.Apr 7, 2023Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 14, 2026 | 679 Mcallister St Interior remodel & alteration. remodel (e) restroom 5'x10' at 1st fl. add new stairs to mezzanine. add storage room at mezzanine. Filed | Commercial or tenant improvement | Filed | — | |
| Sep 11, 2026 | 1241 Powell St Interior remodel and alteration to (e) ground floor commerical space. (e) hair salon and proposed (n) dental office to the public per sf planning sec 812. install (n) partitions to create dental office, remodel bathrooms, and replace fixtures and finishes. no change to occupancy. Filed | Commercial or tenant improvement | Filed | Within 1 month | |
| Sep 9, 2026 | 791 21st Av Unit 791: remodel (e) kitchen - 7'x10.75'. remodel (e) bath 8x5. add new bath 7x5. new subpanel with 120/240 volts/ 50a feeder. rewire receptacles, switches, lights in bedrooms, living room, bathroom & hallway. Issued | Home remodel | Issued | Within 1 month | |
| Aug 26, 2026 | 626 08th Av Interior remodel & alteration, horizontal addition. Issued | Addition | Issued | 1 month | |
| Aug 23, 2026 | 83 Harrington St Raise existing single family dwelling +-24". expand 3rd floor with gable roof, remodel interior with new stairs. subject to ab-112, all electric ordinance. Filed | Addition | Filed | — | |
| Aug 19, 2026 | 2758 38th Av To comply w/nov#: 202659648 and 202659341. remodel 2nd flr bathroom. add partition at (e) living room to create (n) media room. replace plumbing, replace shower pan, replace tile around shower pan Issued | Legalize or fix a violation | Issued | Within 1 month | |
| Jul 29, 2026 | 1801 Alemany Bl Barrier removal, add one van accessible parking Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Jun 25, 2026 | 77 Bruton St G/f- tenant improvement in existing vacant space. change of use to cafe. proposed new cafe: aracely cafe. add new entrace door facing bruton st. Issued | Commercial or tenant improvementType unconfirmed | Issued | 2 months | |
| Jun 1, 2026 | 39 Gladeview Wy (n) rear yard patio and deck max. 6 feet above (e) grade Issued | Deck, stairs or patio cover | Issued | 3 months | |
| Apr 28, 2026 | 2700 Mission St Correct nov 202173787: complies w/ mandatory soft-story retrofit ordinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades. Filed | Seismic retrofit or foundationType unconfirmed | Filed | — | |
| Mar 6, 2026 | 225 Cotter St To comply with nov 202548687. 1/f: legalize wetbar, partition wall for storage space, bathroom, front window and 1-hr rated wall at garage. 2/f: legalize 2 sliding doors, bathroom, half bath, kitchen remodel. legalize and verify electrical and plumbing work done without permit. Filed | Legalize or fix a violation | Filed | — | |
| Feb 19, 2026 | 2700 Mission St Correct nov 202173787: complies w/ mandatory soft-story retrofit oridinance. seismic upgrade to basement and g/f. interior alterations per structural upgrades. Filed | Seismic retrofit or foundationType unconfirmed | Filed | — | |
| Dec 18, 2025 | 984 Moscow St Correct building code violation, complaint his# 202423508, his# 202423643 & his# 202423644. 1st floor unit legalization per ordinance# 43-14. no change to front facade or structure. Cancelled | Legalize or fix a violation | Cancelled | — | |
| Jan 27, 2025 | 1410 Post St Revision to pa # 2024-0227-6620 relocate bathroom & alter hold down & shear wall location Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 27, 2025 | 1616 Taylor St Revision to permits 201803133492 and 202412136811. revise unit a and unit b layout. interior layout only. 11 (e) + (n) 3 adu's Complete | Revision or supplement | Complete | 1 month | |
| Dec 13, 2024 | 1616 Taylor St Revision to approved bpa#201803133492 revise interior layouts. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 27, 2024 | 326 Santa Ana Av Remodel existing single family dwelling; 1st flr- add bathroom & replace kitchen fixtures; basement- fill-in below rear overhang & excavate front window well for new bedroom & office. Issued | Addition | Issued | 7 months | |
| Jul 13, 2023 | 678 23rd Av Interior remodel of e single family dwelling, 2-story horizontal addition at rear of building. infill lightwell not visible from any site land. relocate rear exterior stairs, no change to front facade. no change to building height Complete | Addition | Complete | 14 months | |
| Apr 7, 2023 | 246 Girard St 1st flr add 2-bedrm, 1-bath, 1-living rm, 2nd flr add 1-bath, infill below e 2nd flr at rear, infill lightwell not visible from any off site land, no change to bldg height or depth, lower e 1st flr by +/- 18", remove front & rear ext stairs, relocate front entry to 1st flr. Complete | Addition | Complete | 5 months | |
| Nov 23, 2022 | 1251 Gilman Av Correct planning code and building code violation 2022-010222enf & complaint #202295933. first floor unit legalization per ordinance #43-14. separte sprnkler permit Issued | Legalize or fix a violation | Issued | 40 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Man Yip Li? Request a correction.