Mark Reilly
Architect · Mark Reilly Architecture · Grass Valley
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33112First issued Jul 1, 2011, expires Apr 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 20 permits since 2010, 20 in the last 5 years. Latest filed Sep 8, 2023.
- What kind of projects?
- Addition 10 · Home remodel 8 · Commercial or tenant improvement 1
- How long do their permits take?
- Addition: 10 months. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 10 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 872 permits.
Where
- Bernal Heights3
- Castro/Upper Market2
- Noe Valley2
- Outer Richmond1
Most recent
- 121 Hancock St #0Remove section of gabled roof at rear of third floor to create three dormers per 2a3 for upper unit within buildable areaSep 8, 2023Filed
- 25 Bennington StRemove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rearFeb 15, 2022Complete
- 117 Newman StReplace (e) exterior entry stair, driveway & garage door. restore street facade. add (n) 3rd story bedroom, office, bath & stair. add (2) skylightsMay 2, 2019Complete
- 130 Newman StRenovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck.Jul 2, 2018Complete
- 249 17th AvHorizontal addition bldg 1 story addition at rear of (e)structure w/patio on top. add 1st fl guest, bed, bath, study & laundry. enclose (e) 2nd flr rear porch. renovate 2nd flr kitchen. add (n) interior stair from 1st to 2nd flr. replace garage door. remove (e) ext rear stair from 1st to 2nd flJan 14, 2016Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 1, 2024 | 3676 17th St #0 Revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell. Expired | Revision or supplement | Expired | 2 months | |
| Sep 8, 2023 | 121 Hancock St #0 Remove section of gabled roof at rear of third floor to create three dormers per 2a3 for upper unit within buildable area Filed | AdditionType unconfirmed | Filed | — | |
| Dec 6, 2022 | 3676 17th St Partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure. Complete | Home remodelType unconfirmed | Complete | 13 months | |
| Apr 13, 2022 | 105 Fairmount St Unit #105: kitchen remodel of unit 105 in a 2 unit building Complete | Home remodel | Complete | Within 1 month | |
| Feb 15, 2022 | 25 Bennington St Remove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rear Complete | Addition | Complete | 21 months | |
| Oct 15, 2021 | 117 Newman St Revision of addendum to previously approved permit #201905029503 s1: add a closet to bedroom 2 and change the location of permeable paving from the driveway to the side walkway in the front yard setback. Complete | Revision or supplement | Complete | 5 months | |
| Mar 18, 2021 | 162 Parker Av Add a studio unit within (e) 1st floor. renovate (e) 2nd fl kitchen, bathroom & bedrooms & add a bathroom, laundry closet & spiral stair to backyard. Complete | Commercial or tenant improvement | Complete | 8 months | |
| Feb 26, 2020 | 21 Bennington St Remodel (e) kitchen, 2 bathrooms & deck within (e) buidling envelope Complete | Home remodel | Complete | 8 months | |
| Oct 1, 2019 | 130 Newman St Revision to 201807023461 s1 repair drurot in (e) 3rd flr attic storage and add new dormer per the reqs of the sf dormer ord Complete | Revision or supplement | Complete | Within 1 month | |
| May 2, 2019 | 117 Newman St Replace (e) exterior entry stair, driveway & garage door. restore street facade. add (n) 3rd story bedroom, office, bath & stair. add (2) skylights Complete | Addition | Complete | 20 months | |
| Oct 17, 2018 | 799 Athens St Remodel (e) kitchen & bath, open wall btwn kitchen and dining Complete | Home remodel | Complete | Within 1 month | |
| Jul 2, 2018 | 130 Newman St Renovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck. Complete | Addition | Complete | 10 months | |
| Jan 14, 2016 | 249 17th Av Horizontal addition bldg 1 story addition at rear of (e)structure w/patio on top. add 1st fl guest, bed, bath, study & laundry. enclose (e) 2nd flr rear porch. renovate 2nd flr kitchen. add (n) interior stair from 1st to 2nd flr. replace garage door. remove (e) ext rear stair from 1st to 2nd fl Complete | Addition | Complete | 10 months | |
| May 12, 2015 | 3855 17th St Replace (e) brick foundation, convert 1st fl storage into room & deck. add 3rd fl master suite & (n) internal stair to connect all floors. (n) sliding doors @ back of house, (3) (n) skylights. Complete | Addition | Complete | 11 months | |
| Feb 12, 2015 | 70 Beaumont Av Renovate 2nd floor kitchen, dining, living, powder rm and add deck, add 3rd floor master suite, 2 bedrooms, 2 full baths and stair Complete | Addition | Complete | 10 months | |
| Oct 8, 2014 | 555 29th St Convert(e) basement into (n)laundry,guest bath,playrm,&mstr bath.add(n)mstr bedrm under (e)family rm.add(n)guest bedrm in bsmt level w/ deck above.add(n)internal stair to bsmt.renovate powder rm on 1st fl. modify entry. Complete | Addition | Complete | 11 months | |
| Sep 9, 2013 | 527 Alvarado St Replace existing kitchen/dining room windows & doors. add 4'-6" addition at lower level. create two bedrooms, two bathrooms & playroom in place of former master bedroom, add 11'-0" deck, stair to yard & spiral stair to main level. Complete | Addition | Complete | 9 months | |
| Jul 19, 2013 | 1370 Florida St Renovate kitchen & pantry, replace 2 windows, not visable from street Complete | Home remodel | Complete | Within 1 month | |
| Jul 11, 2012 | 309 Waller St Remove stucco and restore facade. replace rotted second floor windows with matching aluminum clad wood double hung windows. Complete | Other | Complete | Within 1 month | |
| Apr 23, 2012 | 527 Alvarado St Remodel extg master bathroom: replace and relocate tub, toilet & sinks. install new lights and fan within the extg space. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Mark Reilly? Request a correction.