Matthew Palmer Frantz
Engineer · Zfa Strutural Engineers · Burlingame
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-5919First issued Jun 17, 2013, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 12 permits since 2019, 12 in the last 5 years. Latest filed Aug 27, 2025.
- What kind of projects?
- Commercial or tenant improvement 5 · ADU 2 · Seismic retrofit or foundation 2
- How long do their permits take?
- Commercial or tenant improvement: 6 months. City typical for the same review: 5 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 5 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 1,514 permits.
Where
- Oceanview/Merced/Ingleside1
- Lone Mountain/USF1
- Inner Sunset1
- Hayes Valley1
Most recent
- 283 Farallones StRear 825 sf horiz addition at lvs 1 & 2 and interior alterations to (e) group e childcare facility. change of use & occupancy from group e daycare to group i-4 & e daycare. inclds: seismic upgrde, (n) mep, (n) lvl 2 deck with 2 (n) exterior exit stairs, (n) platform lift, and (n) outdoor play areas.Aug 27, 2025Issued
- 2350 Turk BlRenovation of (e) theater includng installation of new cat- walk over (e) stageApr 11, 2025Complete
- 8 Locksley AvConversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave.Dec 29, 2022Filed
- 340 Fell StRenovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit.Dec 28, 2022Complete
- 2180 Harrison StT.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system.Jul 12, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 27, 2025 | 283 Farallones St Rear 825 sf horiz addition at lvs 1 & 2 and interior alterations to (e) group e childcare facility. change of use & occupancy from group e daycare to group i-4 & e daycare. inclds: seismic upgrde, (n) mep, (n) lvl 2 deck with 2 (n) exterior exit stairs, (n) platform lift, and (n) outdoor play areas. Issued | Commercial or tenant improvement | Issued | 6 months | |
| Apr 11, 2025 | 2350 Turk Bl Renovation of (e) theater includng installation of new cat- walk over (e) stage Complete | Commercial or tenant improvement | Complete | 6 months | |
| Nov 14, 2024 | 1017 Fell St Ref pa # 201702179707 repairs to (e) structural framing uncovered during construction including floor framing strengthening (n) framing under (e) floor members & foundation to support. also continuity improvements to header bracing at (1) location. work occurs on gr fl in 3 discrete locations Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 11, 2024 | 111 Pine St Deferred submittal for permit# 202402075406: for structural framing of walls. all work is interior only, no change of use or occupancy. no change of building height or footprint is limited to structural only. Withdrawn | Revision or supplement | Withdrawn | — | |
| Apr 8, 2024 | 270 Masonic Av Mandatory seismic retrofit of existing building per sfbc section 503.11.1. to allow for future non structural alternations including partitions, ceilings, and mep upgrades for more than two thirds of the building. (e) bldg is currently unoccupied. Approved | Seismic retrofit or foundation | Approved | — | |
| Dec 5, 2023 | 270 Masonic Av The structural scope is an addition to the parking deck rehabilitation permit under 202309196898 Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 27, 2023 | 301 King St #0 Conversion of un-used parking spots on the 2nd & 3rd floor into 10 new accessory dwelling units (adus) with (n) kitchen, bedroom, living room and new bathroom Issued | ADU | Issued | 32 months | |
| Jun 6, 2023 | 49 South Van Ness Av Vertical railing extension at (e) guard rail at 3rd fl terrace outside (e) day care center. Complete | Deck, stairs or patio cover | Complete | Within 1 month | |
| Mar 1, 2023 | 135 Mississippi St #0 Revision to 2022-0912-2262 demo (e)exterior ramp curb & railing; relocate van accessible parking stall & restripe parking stalls as needed. redesign of exterior ramp with ada compliant slope & handrails. raised concrete pad at back of ramp & (e) stair via revised grading throughout lot Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 29, 2022 | 8 Locksley Av Conversion of (e) un-used carpark spots on the 1st floor into new break-room at 8 locksley ave. Filed | Commercial or tenant improvementType unconfirmed | Filed | — | |
| Dec 28, 2022 | 340 Fell St Renovate two story portion into an electrical automobile service center and one story portion will be an automobile showroom. building does not have an elevator per cbc 11b-206.2.3 exception 1.1 the project includes core and shell modifications the ti willl be submitted under separate permit. Complete | Commercial or tenant improvement | Complete | 18 months | |
| Dec 28, 2022 | 6 Locksley Av #0 Conversion of (e) un-used storage on the 1st floor into (4) new adus with (n) kitchen, bedroom, living room, bathroom at 6 locksley ave. local ordinance. Filed | ADU | Filed | — | |
| Jul 12, 2021 | 2180 Harrison St T.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 9, 2021 | 1401 Lyon St To comply with nov 202178723 to provide (temporary) Complete | Legalize or fix a violation | Complete | Within 1 month | |
| May 20, 2021 | 27 Chabot Tr Repairs and voluntary retrofit to an (e) three story, wood framed, multi-fm dwelling. sheathing of wood shear walls addition ofan ordinary moment frame and the addiion of footsing to support shear walls and moment frame. releveling floor framing in front of building and replacing existing finishes. Issued | Seismic retrofit or foundation | Issued | Within 1 month | |
| Jul 16, 2020 | 50 Thomas More Wy Installation of a new platform lift system assocated with accessibility path of travel upgrdaes deferred under structural seismic upgrade pa201905079955, other works include installation of new casework. Complete | Revision or supplement | Complete | 7 months | |
| Mar 28, 2019 | 415 27th St #0 Replace (1) window & (1) patio door-visible with alarmwood clad (marvin) window window cut down slightly for egress (see #201703091079) Issued | OtherType unconfirmed | Issued | 5 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Matthew Palmer Frantz? Request a correction.