Mia K Zinni
Architect · Mza Ltd. · Burlingame
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-39469First issued Nov 30, 2021, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 7 permits since 2022, 7 in the last 5 years. Latest filed Sep 10, 2026.
- What kind of projects?
- Addition 3 · Home remodel 2 · Deck, stairs or patio cover 2
- How long do their permits take?
- Addition: 16 months. City typical for the same review: 12 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 3 permits in San Francisco
Time to get a permit
Median from filing to permit, from 1 issued permit filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 872 permits.
Where
- Presidio Heights2
- Inner Richmond1
Most recent
- 68 Blake StSingle story rear yard addittion, new roof extenstion to match existing roof. dig out lower basement under the proposed new addition. interior remodel, revise rear patio at grade.project is subject to ab112 all-electric ordinance.Sep 10, 2026Filed
- 68 Blake StSingle story rear yard addition (1609sf) (n) roof extention to match (e) roof height. excavate lower basement under proposed addition. interior remodel . revise rear deck and patio at grade.Apr 14, 2025Withdrawn
- 258 12th AvSingle family residential interior remodel. two story rear yard addition, and revised back exterior deck.Aug 8, 2022Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 10, 2026 | 68 Blake St Single story rear yard addittion, new roof extenstion to match existing roof. dig out lower basement under the proposed new addition. interior remodel, revise rear patio at grade.project is subject to ab112 all-electric ordinance. Filed | Addition | Filed | — | |
| Jun 23, 2026 | 295 Sanchez St Add new sunshade and replace glass guardrail with solid parapet on existing level 2 deck. reconfigure exterior egress stair be6tween g/f and 2/f. Filed | Deck, stairs or patio cover | Filed | — | |
| May 6, 2026 | 295 Sanchez St Replace glass deck railing with solid walls. Filed | Deck, stairs or patio cover | Filed | — | |
| Apr 14, 2025 | 68 Blake St Single story rear yard addition (1609sf) (n) roof extention to match (e) roof height. excavate lower basement under proposed addition. interior remodel . revise rear deck and patio at grade. Withdrawn | Addition | Withdrawn | — | |
| Oct 7, 2024 | 258 12th Av Revision to pa# 202208080115: revise footing details on sheet s1 & s5; replace footing below existing structure on 3 sides; reframe interior stairway to make required head height Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 30, 2024 | 295 Sanchez St Kitchen & bathroom renovation/remodel, selective window replacement, replace roof-guardrail glass. Issued | Home remodel | Issued | 9 months | |
| May 3, 2023 | 2204 Green St One in kind bathroom renovation. all plumbing fixture locations in kind replacements. Cancelled | Home remodel | Cancelled | — | |
| Aug 8, 2022 | 258 12th Av Single family residential interior remodel. two story rear yard addition, and revised back exterior deck. Issued | Addition | Issued | 16 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Mia K Zinni? Request a correction.