P Vincent Gonzaga
Architect · Vincent Gonzaga Architect
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33614First issued May 2, 2012, expires Apr 30, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 25 permits since 2015, 25 in the last 5 years. Latest filed Sep 28, 2026.
- What kind of projects?
- Commercial or tenant improvement 12 · Legalize or fix a violation 6 · Home remodel 3
- How long do their permits take?
- Commercial or tenant improvement: 8 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 12 permits in San Francisco
Time to get a permit
Median from filing to permit, from 12 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 5,329 permits.
Where
- Castro/Upper Market4
- Bayview Hunters Point2
- Financial District/South Beach2
- Noe Valley1
Most recent
- 551 Alvarado StTo obtain final inspection for work approved under pa# 202504214871. all work is complete.Sep 28, 2026Complete
- 60 13th StNew commercial kitchen in new shipping container with new ramp and platform to access commercial ktichen. no change of use or occupancy groupApr 22, 2019Expired
- 2029 Market StAt (e) ground floor commercial tenant space, provide (n) power door operator to comply with accessible business entrance program (abe ordinance 51-16). project scope consists of barrier removal only.Mar 26, 2019Complete
- 75 Industrial StChange of use of portion of (e) ground flr area from industrial agriculture to wholesale sales with accessory office space from cannabis distribution. install new partitions, new doors & new toilet room. mech/plm/ele/lighting/sprinklerslife safety under sep permit maher naMay 31, 2018Complete
- 527 Howard StChange of use.at(e)grd floor commercial tenant space.change of use fr medical cannabis dispensary to cannabis retail. no chg of occupancy grp. no proposed demo or (n)constr. drawings show work previously approv under 2017-09-20-9121 & 2017-10-11-0942.Mar 21, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 28, 2026 | 551 Alvarado St To obtain final inspection for work approved under pa# 202504214871. all work is complete. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| May 13, 2026 | 2140 Sutter St To comply with nov 202538778 at 4/fl to remove (e) plumbing fixtures and door. infill door opening and provide (n) attic access. 3/fl legalize (e) window infill at bathroom. add a (n) closet. 1/fl- legalize (e) window replacement in kind not visible from street Issued | Legalize or fix a violation | Issued | Within 1 month | |
| Nov 7, 2025 | 812 Guerrero St Rev to pa# 2025-0428-5356: to comply with notice of correction from building inspector, indicate height and elevations of (n) fire rated wall at property line and provide a wall detail to comply with nov 201767431 item #2. Filed | Revision or supplement | Filed | — | |
| Oct 9, 2025 | 551 Alvarado St Revision to pa # 2023-0322-4205 s1. 3rd fl master bedroom closet add washer & dryer. flip bathroom fixtures and relocate door to mechanical closet. add steam shower equipment to master bathroom shower Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 26, 2025 | 74 Prospect Av Revision to pa# 202508193407: at (e) second floor bedrooms, remove (e) closets and fireplace. (n) bathroom, closets, doors, fixtures, and finishes. Complete | Revision or supplement | Complete | 2 months | |
| Aug 19, 2025 | 74 Prospect Av At existing 2nd floor bathroom, remove existing closet and enlarge existing bathroom. install new fixtures and finishes. non load bearing wall, no structural work. Complete | Home remodel | Complete | 1 month | |
| Jul 24, 2025 | 4799 Mission St Revision to pa# 202502130286: per electrical inspector document e) outlets, illumicated exit sign, bugeye fixtures, junction box for illumincated signage & general lighting to remain in front of tenant space (interior). document e) gfci outlet in toilet room for remain Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 21, 2025 | 551 Alvarado St Rev to permit 202303224205-s1. per correction notice, repair dryrot at (e) front stairs, railings and walkway including crumbled foundation. (e) stair configuration, dimensions and trim details to not change and to match (e). new rat slab and area drains under repaired exterior walkway & at (e) pit. Expired | Revision or supplement | Expired | 2 months | |
| Feb 13, 2025 | 4799 Mission St To comply with nov #202299059 at (e) ground fl vacant commercial tenant space; remove (e) stair & infill at fl opening, remove abandoned ductwork & infill ceiling openings with 2 hour fire rated construction Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Oct 24, 2024 | 2645 Ocean Av Revision to pa 202308235012 per senior building inspector, document change to form c, indicating 20% reached with parking paving & removal of walkway repaving from form c & scope of work Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 17, 2024 | 506 11th Av To comply w/ nov# 202180480: remove (e) unpermitted enclosed deck & bathroom at rear convert (e) unpermitted enclosed deck & bathroom at rear convert (e) closet to (n) bathroom (n) horiz additon at rear containing (n) bedroom and (n) office (n) rear deck and stair Reinstated | Legalize or fix a violation | Reinstated | 5 months | |
| Sep 20, 2024 | 1983 34th Av Revision to pa# 202311030096, (n) glass block window at rear wall, not visible from street. remove & replace (e) laundry sink in (e) garage. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 3, 2024 | 1475 Church St Revision to pa 202304135708 r1 due to as built conditions, retain a portion of shear wall and extend Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 4, 2024 | 740 Tennessee St #0 Deferred mechanical & electrical for garage exhaust. reference pa#202402125716. Complete | Revision or supplement | Complete | 9 months | |
| Feb 12, 2024 | 740 Tennessee St To comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement. Complete | OtherType unconfirmed | Complete | Within 1 month | |
| Nov 3, 2023 | 1983 34th Av Remove (e) ground fl single story rear addition & build (n) ground floor single story addition setback from side property lines. legalize wall & door at ground fl garage. legalize ground fl as-built condition including bathroom that differs from completed pa# 8806345 r1. ref complaint # 202310496. Complete | Legalize or fix a violationType unconfirmed | Complete | 10 months | |
| Aug 23, 2023 | 2645 Ocean Av A voluntary strengthening of the building walls Complete | Seismic retrofit or foundationType unconfirmed | Complete | Within 1 month | |
| Mar 22, 2023 | 551 Alvarado St (n) vertical & horizontal addition @ grd flr, legalize unauthorized dwelling unit & convert portion to (n) garage. reconfigure rooms @ 2nd flr. raise portion of roof & convert (e) attic to 3rd flr. convert portion of (e) crawlspace to (n) basement. Complete | Legalize or fix a violationType unconfirmed | Complete | 11 months | |
| Nov 9, 2022 | 118 Commonwealth Av Rev to pa# 2002-0430-5268 (recommenced under approved permit 2022-0516-4302) revise interior partition layout at 1st fl, 2nd fl & 3rd fl, revise approved spiral stair per site conditons, at 1st fl, replace (e) french doors and sidelights to rear yard and (e) window with (n) full-lite door Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 2, 2022 | 30 Cabrillo St At (e) g/f: remove (e) non-structural partitions, doors & fixtures. (n) parttions, doors, fixtures & cabinets for (n) bedroom, powder room & media room. rmeove (e) window & replace with (n) to rear yard. replace (e at lightwell in-kind , not visible from streeet. (351 sf) Issued | Home remodel | Issued | 10 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you P Vincent Gonzaga? Request a correction.