Peter A Zepponi
Architect · Peter A. Zepponi, Aia · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-26699First issued Jan 2, 1997, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 52 permits since 2004, 52 in the last 5 years. Latest filed Sep 16, 2026.
- What kind of projects?
- Home remodel 29 · Addition 11 · Deck, stairs or patio cover 4
- How long do their permits take?
- Home remodel: within 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 29 permits in San Francisco
Time to get a permit
Median from filing to permit, from 29 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 14,772 permits.
Where
- West of Twin Peaks15
- Inner Sunset4
- Russian Hill4
- Marina2
Most recent
- 3 Balmy StInterior remodel of (e) kitchen. new powder room at 2/f.Sep 16, 2026Issued
- 1692 08th AvKitchen and diniing room remodel. remove wall between kitchen and dining.Aug 4, 2023Complete
- 2530 14th Av1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl.Oct 24, 2022Issued
- 455 Melrose AvAdd new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater.Jun 8, 2022Expired
- 2530 14th AvDemolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level.Apr 29, 2022Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 16, 2026 | 3 Balmy St Interior remodel of (e) kitchen. new powder room at 2/f. Issued | Home remodel | Issued | Within 1 month | |
| Jul 21, 2026 | 3 Balmy St Chimney demolition Issued | Other | Issued | Within 1 month | |
| Jan 28, 2026 | 65 Raycliff Tr Recommencement & completion of work approved under pa# 202111182729, 202104198802, 202409060299. Issued | Revision or supplement | Issued | Within 1 month | |
| May 29, 2025 | 65 Raycliff Tr Revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build as Issued | Revision or supplement | Issued | 14 months | |
| Sep 6, 2024 | 65 Raycliff Tr Revision to pa 202111182729. to remove the addition of adu and maintain existing single family use. remove one (e) closet wall and door. revise kitchen to remove full size range and hood and full size refrig. replace w/ under counter frig and 2-burner invention cooktop. remove designated adu address Issued | Revision or supplement | Issued | Within 1 month | |
| Aug 4, 2023 | 1692 08th Av Kitchen and diniing room remodel. remove wall between kitchen and dining. Complete | Home remodel | Complete | Within 1 month | |
| Oct 24, 2022 | 2530 14th Av 1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl. Issued | Home remodel | Issued | 16 months | |
| Jun 8, 2022 | 455 Melrose Av Add new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater. Expired | Home remodel | Expired | Within 1 month | |
| May 2, 2022 | 84 Molimo Dr Corrective permit to document the construction work to comply with nov #201956581 "excavation, foundation and structural work, performed without permit, violation has been addressed undrer previously approved permit pa# 2019-0520-1153 ref drawngs s2.1, s3.1,s4.1,s4.2 Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Apr 29, 2022 | 2530 14th Av Demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level. Issued | Home remodelType unconfirmed | Issued | Within 1 month | |
| Jan 26, 2022 | 84 Molimo Dr To comply with nov #202289252.new 1 hour wall at property line. reduce size of (e) deck. replace (e) deck stair with new stair to rear yard. 2nd floor deck at rear demolish and rebuild. Complete | Legalize or fix a violation | Complete | 4 months | |
| Apr 16, 2021 | 112 Molimo Dr 1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights. Complete | ADUType unconfirmed | Complete | Within 1 month | |
| Nov 3, 2020 | 1474 06th Av Revision to pa #201801027653 - due to correction notice and public safety, remove and replace existing brick stairs in kind as a revision to approved plans. rebuild garage door opening. existing porch to remain Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 28, 2020 | 76 Molimo Dr 1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bath Complete | Home remodel | Complete | Within 1 month | |
| Oct 22, 2019 | 12 Whitney St Unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen. Complete | Seismic retrofit or foundationType unconfirmed | Complete | 8 months | |
| Oct 9, 2019 | 455 Melrose Av Remove and replace extg rear decks and stairs with new . new windows and doors at rear wall not visible from street. Expired | Deck, stairs or patio cover | Expired | 19 months | |
| May 20, 2019 | 84 Molimo Dr Interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom. Complete | Home remodel | Complete | Within 1 month | |
| Mar 7, 2019 | 48 Coventry Ct Interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heater Complete | Home remodel | Complete | Within 1 month | |
| Aug 21, 2018 | 48 Molimo Dr 1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island. Complete | Addition | Complete | 9 months | |
| Mar 7, 2018 | 48 Molimo Dr Residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Peter A Zepponi? Request a correction.